Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Veterans Affairs was posted on May 1, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

H244 Boiler Plant Services - STC

Awarded
36C26325P0640Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
SLED
G09-700046/Misc Equipment Repair
Solicitation # SRC0000037226
Solicitation SRC0000037226 is for the provision of hourly labor and parts for the repair and maintenance of miscellaneous small engine equipment, utility vehicles, and trailers for the Alabama Department of Transportation Equipment Yard in Montgomery. The scope of work includes standard servicing and specialized repairs such as welding fenders and gates and replacing wood flooring for specific assets, including Mahindra MPACT 750S and Flexhauler utility vehicles, as well as lowboy and transport trailers. The contractor is responsible for the pickup and delivery of equipment to and from the ALDOT Equipment Yard. Pricing is based on hourly labor rates and a percentage markup over vendor cost for parts. The contract is subject to a total cost limit of 25,000 dollars and may be renewed annually for up to five years, provided the total expenditure does not exceed the 25,000 dollar cap. Award evaluation is based on price reasonableness and cost realism, with the state reserving the right to request professional licenses, certificates of insurance, and manufacturer authorizations. Compliance requirements include E-Verify enrollment, registration with the Alabama Secretary of State for foreign entities, and certification of Alabama state and local tax compliance. Legal venue for any disputes is established in Montgomery, Alabama, with the Board of Adjustment of the State of Alabama serving as the sole remedy for monetary claims.
G09_3 Equipment Yard

POSTED

about 14 hours ago

DEADLINE

in 5 days
NAICS: 811310
New
SLED
Kitchen Equipment Repair/Maintenance
Solicitation # 39481
The Watertown Public Schools is seeking qualified vendors to provide kitchen equipment repair and maintenance services for five school locations: John Trumbull Primary, Polk Elementary, Judson Elementary, Swift Middle, and Watertown High School. The scope of work includes the repair and maintenance of all food service equipment, including refrigeration, freezers, and hot equipment. Key deliverables include two preventive maintenance inspections per year at all five locations, a comprehensive maintenance plan with reporting and recommendations, and the provision of service histories upon request. The contract period runs from December 1, 2026, through November 30, 2027, with the district holding the option to extend the agreement for two additional years. Proposals will be evaluated based on cost (40 points), experience and qualifications (25 points), service response and availability (20 points), and the quality of the preventive maintenance plan (15 points). Vendors must be able to provide an initial response within four hours for emergency services that threaten meal service or food safety. Submission requirements include two copies of the proposal package, including a price proposal for labor rates, travel charges, and parts markup. The successful vendor must provide a W-9 and Certificate of Insurance prior to execution, maintain a drug-free workplace, and comply with the Americans with Disabilities Act and equal opportunity employment laws. The deadline for sealed bid submissions is November 20, 2026, by 11:00 AM.
DAS Procurement

POSTED

about 18 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This is a single award, firm fixed price service contract awarded by the Department of Veterans Affairs Network 23 for the St. Cloud VA Health Care System. The contractor is responsible for providing comprehensive boiler plant services, including semiannual combustion tuning, semiannual instrumentation calibration, semiannual motor vibration analysis for nine motors, and annual safety device testing. The period of performance consists of one base year with four option years. All work must be performed in accordance with VHA Directive 1810, the VHA Boiler Plant Safety Device Testing Manual, and NFPA 85 standards. Qualified technicians must have at least one year of trade school and five years of experience with institutional or industrial boiler plants. The scope covers four Cleaver Brooks fire tube boilers and associated tanks, requiring the use of portable electronic flue gas analyzers and specific calibration tools. Key operational constraints include a requirement that only one boiler be offline at a time and that all services be coordinated with the Boiler Plant Supervisor. The contractor must submit detailed performance data reports within fifteen business days of service completion and affix heat-resistant service labels to all tested devices. This contract is set aside for Service-Disabled Veteran-Owned Small Businesses.

General Info

Contract Value

$52,759.57

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

Saint Cloud, MN, 56303, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

1

36C26325P0640 Boiler Plant Services - St. Cloud VA Health Care System

PDF, High priority: read this firstaward
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 23 (36C263)
Contacts2 people available
OfficeSaint Paul, MN, 55101, USA
Office AddressSaint Paul, MN, 55101, USA
Contacts

Full Description

Show more
STATEMENT OF WORK 1. TITLE: Boiler Plant Instrumentation Calibration, Combustion and Tune, Device Testing and Motor Vibration Analysis services to support the St. Cloud VA Health Care System. 2. OVERVIEW: The contractor shall provide boiler safety device testing, tuning, inspection, calibration of boiler plant equipment, burners, controls, instruments at the frequency described on the schedule below. 3. DEFINITIONS: a. CO - Contracting Officer b. VA - Department of Veterans Affairs c. VAHCS - St. Cloud VA Health Care System d. VATR - Veterans Affairs Technical Representative e. Contractor Employee - means all Contractor staff, technicians, personnel, subcontractors, or persons working on behalf of the Contractor. 4. PLACE OF PERFORMANCE: St. Cloud VA Health Care System, 4801 Veterans Drive, St. St Cloud, MN 56303 PERIOD OF PERFORMANCE: This contract will be a Single Award, Firm Fixed Price Service Contract for 1 (One) Base Year from with 4 (Four) Option Years. QUALIFICATIONS AND SPECIAL CERTIFICATIONS: Certified Technicians shall have completed at least a one-year trade school and have five years successful experience in this field. The experience shall be largely with institutional and industrial boiler plants similar in design to the VAHCS plant. The VAHCS facility manager/engineer may define and accept equivalent qualifications. Technicians shall demonstrate familiarity with and ready access to the current versions of the following references: NFPA 85, Boiler and Combustion Systems Hazards Code. VHA Boiler Plant Safety Device Testing Manual, most current edition. Technicians shall be equipped with portable electronic flue gas analyzers and other test instruments necessary for the required tests and calibrations, to calibrate all instruments, gauges, and transmitters as required herein. All must be calibrated within one month prior to test P-1 and P-4, or recalibration must be completed. At facilities with programmable digital controls, the technicians must be capable of programming the controls and have the appropriate hardware and software for this. Any anticipated sub-contracting work shall be presented in a sub-contracting plan, which is to include the identity of the sub-contractor who will be performing the work. The CO and the VATR must approve, in writing, any sub-contract work prior to its commencement. The contractor shall provide experience, past performance, and references with their bid submission. REGULATIONS / DIRECTIVES / POLICIES: VHA Directive 1810, Boiler and Boiler Plant Operations (most current version) VHA Boiler Plant Safety Device Testing Manual (most current version) Master Construction Specification, Division 23- Heating, Ventilating and Air Conditioning. NFPA 85 - National Fire Protection Association. Boiler and Combustion Systems Hazards Code (most current edition) Boiler Safety Device Testing Data Sheet Combustion Performance Data Sheet Compliance with all state, federal, and local laws SCOPE OF WORK: The Contractor shall provide all transportation, lodging, meals, labor, personnel, equipment, tools, materials, and any resources necessary to provide the following services. Semiannual Boiler Combustion and Tune, Semiannual instrument calibration to include all associated instruments, Semiannual motor vibration analysis, and Annual safety device testing. SPECIAL NOTES: Only one boiler is allowed to be offline for testing/tune purposes at a time! If a boiler plant emergency, site emergency, or national emergency develops, Contractor will cease testing at the request of site personnel. BOILER PERFORMANCE TESTING: P1 through P4 shall be completed in accordance with VHA Directive 1810 (Most Current Edition) and VHA Boiler and Associated Plant Safety Device Testing Manual (Most Current Edition) P-1 - Semiannual Boiler Combustion and Tune P-2 - Semiannual Instrumentation Calibration P-3 - Semiannual Motor Vibration Analysis P-4 - Annual Safety Device Testing Tests will follow VHA Boiler Plant Safety Device Testing Manual procedures verbatim. Technicians shall provide all tools, equipment, and labor necessary to perform inspection, testing, calibrating, and adjustments of burners and boiler and boiler plant controls as specified below. This shall be done every six or twelve months in accordance with a schedule provided by VAHCS. Instrumentation, monitoring, and data management systems as listed per Directive 1810 Appendix B Table 2 Number 10 shall be calibrated every six months. Provide at least two weeks notice to the Boiler Plant Supervisor prior to performing the work. Work must be conducted when the Boiler Plant Supervisor or his/her designate is available on site to monitor the work. During normal business hours unless approved by the Boiler Plant Supervisor. VAHCS will have the boilers that are to be serviced prepared for the technicians upon their scheduled arrival. This includes having the boilers clean of soot and loose scale; fully warmed and at normal steam pressure; steam exhaust silencer system operable. Performance Testing of Boiler, Burner, Economizer (if provided), Combustion Control, Boiler Plant Instrumentation to be done in accordance with VA Master Construction Specifications, Office of Construction and Facilities Management TIL (Technical Information Library) Division 23. Perform overall visual inspection of systems. Observing any minor or major deficiencies before administering test procedures. Verify that systems comply with referenced code and VAHCS requirements. Perform tests on each boiler on all main burner fuels. Operate burner(s) on each fuel from low fire to high fire and back to low fire in at least twelve increments and record combustion performance, flue gas oxygen, carbon monoxide, NOx, fuel train pressures, atomizing train pressures, burner pressures, combustion air temperature, flue temperatures and boiler steam output. If required by local emissions authorities, provides services of testing firm to determine NOx and carbon monoxide. Test firm shall be acceptable to emissions authorities. NOTE: If NOx emissions limits are applicable, list the method of testing that is required by local authorities if it differs from the method listed. NOx emissions shall be tested with electronic analyzer reading in parts per million. Analyzer shall be calibrated with certified test gas within three months prior to use. Analyzer shall be accurate to plus or minus 5% of reading. Test No. P-1: Combustion and Tune Operate boiler on each fuel, with economizer (if provided) in service and record data for at least twelve evenly spaced steam loads from low fire start to 100% of full steam output, and in the same sequence back to low fire. Demonstrate performance and efficiency required by paragraphs under Articles, BOILER, BURNER AND FUEL TRAINS, and ECONOMIZER. Demonstrate proper operation of combustion controls, draft control (if provided), feed water level controls, and instrumentation systems (Section 23 09 11, INSTRUMENTATION and CONTROL FOR BOILER PLANT). When flue gas oxygen trim is provided, conduct tests with trim control on manual at the zero trim (null) position (Section 23 09 11, INSTRUMENTATION and CONTROL FOR BOILER PLANT). After completion of tests with trim control on manual control, repeat the tests on one fuel with the trim control on automatic control. Test No. P-2: Calibration Check current draw of forced draft fan motor at startup and at 100 percent of maximum boiler load. Current draw shall not exceed full load current stamped on motor nameplate. This test may be combined with Test No. P-1. List of instrumentation and controls to be inspected and calibrated: (Yokogawa, Rose Mount, Cleaver Brooks, McDaniel, Trerice, Setra, Ashcroft, Ari industries INC, Siemens.) Steam flow transmitters (all). Steam flow recorders/computer readout. Flue gas oxygen sampling, analyzing and recorder/computer readout. Boiler and economizer stack temperature transmitters and recorder/computer readout. Master steam pressure and combustion controllers. Boiler outlet draft controllers. Boiler water level controllers. Feedwater deaerator and condensate storage tank water level controllers including overflow. All pressure and temperature sensors, gauges, and transmitters. Test Methods: Utilize permanent instrumentation systems for data. All systems shall be operable and in calibration. Utilize portable thermocouple pyrometer furnished and retained by Contractor to measure stack temperature as a verification of permanent stack temperature recorder. Use portable electronic flue gas analyzer to determine constituents of flue gas. Analyzer shall be capable of measuring oxygen in percent with accuracy of plus or minus 0.5 percent oxygen and carbon monoxide in parts per million (ppm) with accuracy of plus or minus 5 percent of reading (Range 0-l000 ppm). Obtain oxygen and carbon monoxide readings at each test point. Calibrate instrument with certified test gases within three months prior to use and immediately after analyzer cell replacement. In Test No. P-1 retain boiler at each load point for a time period sufficient to permit stabilization of flue gas temperature and other parameters. Steam loads for tests may be furnished by the hospital systems, by operation of the steam silencer vent system, or by a combination of the above. Utilize dry bulb and wet bulb thermometers furnished and retained by Contractor for checking combustion air. Smoke testing shall be by visual observation. If smoke density monitor is not provided, utilize Bacharach Model 21-7006 Smoke Test Kit. If there is disagreement with the results of these tests, provide qualified observation person and tests in compliance with EPA Reference Method 9 (CFR 40, Part 60, Appendix A). An additional efficiency test will be required, conforming to ASME Performance Test Code PTC 4, if the boiler efficiency determined in the Test P-1 above, does not comply with requirements. Utilize ASME Test Forms PTC 4.1.a, 4.1.b, and the abbreviated input-output and heat balance methods. Compare the combustion performance data with VAHCS requirements and previous readings. (Flue gas oxygen, carbon monoxide and NOx). If necessary, make adjustments to the fuel, combustion air controllers, and FGR controller and damper to obtain the required performance. Record the new performance data. Flash S.D. card with new tune. P-3: Motor Vibration Analysis Check vibration of all electric motors in the boiler plant: burner fans, feed water motors, and condensate motors. Total of 9 motors. EQUIPMENT LIST: Description Type Make Model/Serial Number Year Boiler 1 Fire Tube Cleaver Brooks 200-600-200 2008 Boiler 2 Fire Tube Cleaver Brooks 200-600-200 2008 Boiler 3 Fire Tube Cleaver Brooks 200-600-200 2008 Boiler 4 Fire Tube Cleaver Brooks 200-400-200 2008 DA Tank Industrial Steam Stamp # 13194 2008 Surge Tank Industrial Steam Stamp # 13138 2008 VA TECHNICAL REPRESENTATIVES: Primary: Boiler Plant Supervisor, 320-252-1670 Ext. 6829 Alternate: Lead Plant Operator, 320-252-1670 Ext. 6347 11. SCHEDULE: Contractor shall perform on-site services during normal business hours, 8:00 am to 4:30 pm, Monday through Friday, excluding Federal Holidays, unless otherwise coordinated with the VATR. If a holiday falls on Sunday, the following Monday will be observed as the legal holiday. If a holiday falls on Saturday, the preceding Friday is observed as a legal holiday. The eleven national holidays observed by the Federal Government are: - New Years Day January 1 - Martin Luther King Jr. Day Third Monday in January - Presidents Day Third Monday in February - Memorial Day Last Monday in May - Juneteenth June 19 - Independence Day July 4 - Labor Day First Monday in September - Columbus Day Second Monday in October - Veterans Day November 11 - Thanksgiving Day Fourth Thursday in November - Christmas Day December 25 - Any additional Federal Holiday declared by the President of the United States The Contractor shall coordinate with the VATR for an agreed upon work schedule to determine when services can be performed. Work may be required to be performed outside of normal duty hours if mutually agreed upon by the VATR or designate and Contractor. Any work resulting in hours outside of 8:00 am to 4:30 pm CT because of operational impacts shall occur at no additional expense to the Government. The Contractor shall provide a minimum of 48-hour notice of any schedule changes. Schedule: Description Type Make Model Number Serial Number Year Type of Service Testing Month(s) Boiler # 1-3 Boiler # 4, DA Tank, Surge Tank Fire Tube Cleaver Brooks 200-600-200 200-400-200 2008 Instrument Calibration April - May October - November Boiler # 1-3 Boiler # 4, DA Tank, Surge Tank Fire Tube Cleaver Brooks Industrial Steam 200-600-200 200-400-200 2008 Safety Device Testing October - November Boiler # 1-3 Boiler # 4 Fire Tube Cleaver Brooks 200-600-200 200-400-200 2008 Combustion Tuning April - May October - November Boiler # 1-3 Boiler # 4, DA Tank, Surge Tank Fire Tube Cleaver Brooks Industrial Steam 200-600-200 200-400-200 2008 Motor Vibration Analysis April - May October - November 12. REPORTING REQUIREMENTS: PERFORMANCE DATA REPORTS: The Contractor shall develop and submit to the Government for approval, a written report for instrumentation and calibration, and vibration analysis within ten (10) calendar days after contract award. The Contractor shall submit completed required reports on all services to the VATR within fifteen (15) business days from the completion of services. At a minimum, the report shall contain: Device description and/or model number Date(s) of services Method Equipment inspection checklist and comment section for identifying system defects Name and signature of service technician Defects/deficiencies (if applicable) Combustion Performance Data Sheet 13. SERVICE LABEL: After a calibration/testing/inspection/analyzed service has been accomplished for each device, a service label shall be placed conspicuously, readily accessible, visible, and legible, on the device in the immediate vicinity of the system tag or existing device label. The label shall be writeable and made of heat resistant, self-destructing material with self-sticking adhesive on the back. The label shall be pre-printed with the following information: Company name or identifier (logo) with the company's full address Technician name (Signature line) All information pertaining to complete date of service: year, month, day. This system has been: Inspected or Certified All information pertaining to next service due: days and years. This information shall be clearly and permanently affixed to the label capable of withstanding the elements. 14. SAFETY REQUIREMENTS: SAFETY REQUIREMENTS AND REPORTING: The Contractor is solely responsible for compliance with all federal, state, and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable and shall perform all work in a safe manner as required by these standards. The Contractor shall implement an Occupational Safety and Health Plan to ensure the safety of their personnel, as well as the protection of Government personnel and property. Additionally, the Contractor is responsible for the safety and health of all sub-Contractor employees. The Contractor shall provide a verbal report to the CO within 24 hours of an accident resulting in injury, death, occupational disease, or adverse environmental impact. The Contractor shall provide a completed copy of required accident investigation reports to the CO within five calendar days of each occurrence. SAFETY: The contractor shall have in place a documented and comprehensive Health and Safety program to ensure all shredding activities are provided in a safe and secure manor. 15. SECURITY REQUIREMENTS: BADGES: Contractor and/or all sub-contracted personal are required to always wear and have visible a Contractor Badge. Badges are issued by Facilities Management (FM), B-3, second floor. FM Office hours are Monday - Friday, 8:00 am - 4:30 pm. The Contractor shall be required to obtain and display identification badges for all employees requiring access to the St Cloud VA Facility. These badges will be Government furnished and issued to Contractor employees upon initial entry, under contract. Identification shall be always worn on the outer clothing between the neck and waist on the front of the body and visible with the Contractor's name plainly displayed. Loss of a contractor badge shall be reported to the VATR no later than the following workday. There is a $30.00 fee for a lost badge. All contract personal shall be checked in by Facilities Management (FM) located in building 3, second floor. Contractor personnel will be escorted by VA staff. 16. DAMAGE TO GOVERNMENT EQUIPMENT AND PROPERTY: The Contractor shall take all necessary precautions to prevent damage to Government equipment and property. The Contractor shall report damage of Government property or equipment to the Contracting Officer and/or VATR within 24 hours of the incident. 17. INVOICING: The contractor shall submit invoice(s) in arrears after the services have been completed. Invoice shall include, but not limited to: Contract Number Purchase Order (PO) Number (changes each option year) Date of Service Location Description Quantities 18. REFERENCES: REFERENCE UPON REQUEST 1 - Master Construction Specification, Division 23- Heating, Ventilating and Air Conditioning ATTACHMENTS: 1 - VHA Directive 1810, Boiler and Boiler Plant Operations 2 - VHA Boiler Plant Safety Device Testing Manual -Most Current Edition 3 - Combustion Performance Data Sheet 4 - Safety Device Testing Data Sheet

More opportunities from Department Of Veterans Affairs → Network Contract Office 23 (36C263)

Same awarding agency

NAICS: 333415
New
Federal
4120--SPECIAL Duplex Strainer - MPLS
Solicitation # 36C26327Q0054
Solicitation 36C26327Q0054 is an accelerated request for quotes issued by the Department of Veterans Affairs Network Contracting Office 23 for the supply and delivery of a brand name or equal Keckley duplex strainer and gasket for the Minneapolis VA Health Care System. This is a small business set-aside conducted under FAR Part 12 for commercial products, utilizing NAICS code 333415. The government intends to award one firm fixed price contract for one 20 inch Keckley Basket Strainer 150 RF Duplex assembly and one O-ring gasket. All items must be new and unused, featuring a modular design with sections not exceeding 2,000 pounds, carbon steel shell construction, and a one year warranty covering defects in materials and workmanship. The period of performance is from November 9, 2026, to March 15, 2027, with all deliverables due at the Minneapolis facility by the end date. Delivery is required FOB Destination, and the contract price must include all equipment, accessories, and shipping charges. Prospective offerors must be registered in the System for Award Management and the SBA Small Business Search database. Quotes must be submitted via email to the contract specialist by 10:00 AM on October 30, 2026. Submissions must include a Buy American Certificate of Origin and details regarding the manufacturer's socioeconomic category.
Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

POSTED

about 18 hours ago

DEADLINE

in 9 days
View Details
NAICS: 561710
New
Federal
R499--Sources Sought - Minneapolis VA Medical Center - Pest Control Services
Solicitation # 36C26327Q0063
The Minneapolis VA Health Care System is conducting market research through a Sources Sought Notice to identify capable vendors for Integrated Pest Management Services (IPMS) under NAICS code 561710. This is not a formal solicitation, and no contracts will be awarded from this notice. The government is seeking information to develop an acquisition strategy, including potential set-asides for Service-Disabled Veteran-Owned, Veteran-Owned, and other socio-economic small business categories. Interested parties must submit their capabilities, SAM Unique Entity ID, and responses to specific questions regarding subcontracting and government contract vehicles to Alisha Milander by October 22, 2026, at 12:00 PM Central Time. The scope of work involves comprehensive pest suppression across various buildings and grounds, including the main medical center and multiple clinics. Key requirements include the eradication of common indoor and outdoor pests, the use of convection heat treatment for bed bugs, and monthly K9 bed bug inspections. The contractor will be responsible for installing and maintaining at least 18 insect light traps, providing pigeon reduction services for Building 70, and performing annual perimeter pesticide applications. All services must comply with EPA, DOT, and OSHA regulations. The anticipated base period of performance is from December 1, 2026, to November 30, 2027.
Exterminating and Pest Control Services

POSTED

6 days ago

DEADLINE

in 1 day
View Details
NAICS: 811310
New
Federal
F109--Boot Repair for Underground Fuel Tank in Support of the Fargo VA Healthcare System, Fargo ND
Solicitation # 36C26327Q0058
The Department of Veterans Affairs Network Contracting Office 23 is seeking capable sources to perform boot replacement and hydrostatic integrity testing for underground fuel tank number 6 at the Fargo VA Health Care System in Fargo, North Dakota. The scope of work requires the contractor to provide all labor, materials, equipment, and supervision to remove deteriorated entry boots and install manufacturer-approved repair boots, while also correcting underground storage tank sump deficiencies. All work must be performed in accordance with North Dakota Department of Environmental Quality requirements, EPA, NFPA 110, and Joint Commission standards. Key deliverables include hydrostatic integrity test results, a certified final repair report, disposal records for removed equipment, and a one-year warranty on all parts and labor. This action is currently a Request for Information and Sources Sought notice, and no formal solicitation exists at this time. Interested parties must submit their company information, business size, capabilities statement, and proof of North Dakota UST contractor credentials to Joseph Bennett via email by 5:00 PM CT on Thursday, October 22, 2026. The email subject line must include RFI number 36C26327Q0058. Once awarded, the anticipated period of performance is 90 days from the Notice to Proceed, with a required completion date of November 13, 2026. Work is to be performed Monday through Friday between 8:00 AM and 4:00 PM.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

6 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS