Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Halsey House Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Halsey House, a historic structure built in 1923 and designated a local Historic Landmark eligible for the California Register of Historic Resources, was acquired by the City of Los Altos in 1974 and repurposed as a nature center. After remaining vacant since 2008, the city now proposes demolishing the building within a 15,000 square foot area surrounding the structure, with demolition activities expected to last approximately three months. Demolition will be carried out using heavy equipment including an excavator, bulldozer, and track loader, all accessing the site via the Redwood Grove Nature Preserve entrance on University Avenue, with equipment staged within the disturbance zone. Following demolition, the site will be cleared and restored with native plant landscaping consistent with the surrounding environment, and all debris and materials will be transported to approved off-site disposal facilities. The project is subject to CEQA regulations due to the building’s historic status, and all activities are planned to minimize environmental impact while ensuring proper disposal and ecological restoration.

General Info

City to demolish vacant historic Halsey House, restore site with native plants, comply with CEQA.

Agency

California → City of Los Altos

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

University Avenue and Adobe Creek Way, Los Altos, CA, 94022

Set-Aside

NONE

Documents

(11)

Notice of Preparation of Draft EIR for Halsey House Project

PDFpresolicitation

Appendix D Historic Resources Evaluation - Halsey House Los Altos CA

PDFhistoric-resource-evaluation

Halsey House Project Environmental Impact Summary

PDFenvironmental-summary

Appendix B CalEEMod Halsey House Demolition Project Detailed Report

PDFdetailed-report

Appendix E Geotechnical Investigation for Halsey House Project

PDFgeotechnical-report

Appendix F Hydrologic Evaluation for Halsey House CEQA Hydrology

PDFhydrologic-evaluation

NOC Halsey House Project Los Altos 6

PDFnotice-of-completion

Draft Environmental Impact Report for Halsey House Project

PDFenvironmental-impact-report

Appendix G Halsey House Relocation Feasibility Study

PDFfeasibility-study

Halsey House Project Draft Environmental Impact Report Notice of Availability

PDFnotice-of-availability

Halsey House Demolition Project Biological Resources Report 4814-01

PDFbiological-resources-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Altos
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Los Altos
Office AddressN/A
Contacts
Harun MusaefendicAssociate Civil Engineer
Michael LisenbeeSenior Project Manager

Interested Companies (1)

Show more
David J. Powers & Associates
San Jose, CA

Full Description

Show more
The Halsey House was built in 1923 and used as a private residence until the property was purchased by the City of Los Altos in 1974 to serve as a park. The building was then converted to a nature center for educational and recreational programming. Since 2008, the Halsey House has remained vacant and unused. The Halsey House is a local Historic Landmark and is eligible for the California Register of Historic Resources (CRHR). As a result, it is considered a historic resource under CEQA. The project proposes to demolish the Halsey House building. Demolition activities would occur within an approximately 15,000 square foot (or 0.3 acre) area of disturbance surrounding the building and would last roughly three months. Demolition equipment, such as an excavator, a bulldozer, and a track loader, would be utilized throughout the demolition period. Equipment and workers would access the site via the Redwood Grove Nature Preserve entrance on University Avenue. Equipment staging would occur within the proposed area of disturbance. After demolition of the building, the site would be cleared and replanted with native plant landscaping that matches the existing vegetation. All building materials would be hauled to an appropriate off-site disposal location.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
Monterey One - Renewable Energy Improvements (CP361), Marina, CA
Solicitation # monterey-one-renewable-energy-improvements-cp361-marina-ca
GSE Construction Co., Inc. is seeking qualified subcontractors and suppliers to participate in the Monterey One Water Regional Treatment Plant CP361 Renewable Energy Improvements Project located in Marina, California. The project encompasses a wide range of upgrades including replacement of digester gas piping and safety equipment, installation of new level measurement devices and five linear generators with associated electrical work, recoating and concrete repairs to four digesters and the building, installation of biogas conditioning and RNG upgrading systems with a pipeline to the PG&E injection station, replacement of the steam boiler with a hydronic heating system, replacement of waste gas flares with enclosed flares, and full demolition of the Cogen facility and related structures. Additional civil, structural, mechanical, and electrical work is required to support these improvements, with specific focus on enhancing renewable energy output and operational safety at the facility. Bidders must respond to this solicitation by the deadline of August 20, 2026, and are required to email estimating@gseconstruction.com to request access to secure project documents prior to submission. The contract falls under NAICS code 238910 and is open to Disadvantaged Business Enterprises certified under the Department of Transportation, Minority Business Enterprises certified by NMSDC, and Women Business Enterprises certified by WBENC. Primary point of contact for inquiries is Michael Demissie, reachable by phone or email. All bids must be submitted through the formal process outlined by GSE Construction Co., Inc., and bidders are expected to review full project documentation before submitting proposals.
GSE Construction Co., Inc.

POSTED

about 11 hours ago

DEADLINE

in 11 days
View Details
NAICS: 238910
New
SEA S Concourse Evolution (SCE) – Bid Package 02
Solicitation # sea-s-concourse-evolution-sce-bid-package-02
The Seattle-Tacoma International Airport S Concourse Evolution (SCE) Bid Package 2 is a major construction procurement managed by Hensel Phelps as General Contractor / Construction Manager, targeting small disadvantaged businesses under an 8A set-aside with a NAICS code of 238910. The scope encompasses eleven distinct subsystems including demolition and abatement, building concrete retrofit, structural steel and metal stairs, fire suppression, site paving, runway and taxi marking, site demolition and earthwork, deep foundations, site utilities, aviation fueling systems, and baggage handling systems, all concentrated at the airport’s S Concourse. Budget ranges for these subsystems collectively estimate the total contract value between $124.2 million and $143.7 million, with individual subsystems ranging from $600,000 for runway marking to over $20 million for baggage handling systems. All subcontracts exceeding $100,000 require performance bonds using Hensel Phelps–provided forms, and all subcontractors must comply with a mandatory Workers’ Compensation Waiver of Subrogation. The project operates under a Project Labor Agreement requiring union labor adherence, and all subcontracts must use Hensel Phelps’s standardized subcontract templates supplied in the bid documents. Bids are due by August 11, 2026, at 8:00 PM PDT and must be submitted via email to SEA-SCEBids@henselphelps.com using the official bid form from the Instructions To Bidders document. The place of performance is fixed at Seattle-Tacoma International Airport in Washington, and the solicitation is open exclusively to small disadvantaged businesses registered under the 8A program.
Hensel Phelps

POSTED

about 11 hours ago

DEADLINE

in 25 days
View Details
NAICS: 238910
New
Pismo - DB Services for the Central Coast Blue AWPF, Pismo Beach, CA
Solicitation # pismo-db-services-central-coast-blue-awpf-pismo-beach-ca
GSE Construction Co., Inc. is seeking qualified subcontractors and suppliers to support the Design-Build construction of the Central Coast Blue Advanced Water Purification Facility in Pismo Beach, California, under solicitation number 2026-138. The project will deliver a 0.50 MGD facility designed to produce approximately 500 acre-feet per year of purified water, encompassing key components such as a 200,000-gallon equalization tank, microfiltration/ultrafiltration and two-stage reverse osmosis systems, UV/advanced oxidation processes, post-treatment stabilization, chlorination, chemical storage and feed systems, purified water storage and pumping infrastructure, approximately 2,000 linear feet of HDPE conveyance pipelines, and groundwater recharge elements including one injection well and two monitoring wells. The scope also includes full electrical, instrumentation, SCADA, and control systems necessary for facility operation. Bidders must respond under specified NAICS codes including 237110, 238120, 237310, 238990, 561730, 238110, 238320, 332312, 238220, and 221310, and must request project documents via email at estimating@gseconstruction.com to gain secure access to all technical and contractual materials prior to submission. The solicitation is open exclusively to small businesses, with set-asides designated for Small Business, Small Disadvantaged Business, Women-Owned Small Business, Disadvantaged Business Enterprise certified under the Department of Transportation, and Minority Business Enterprise certified by NMSDC. The response deadline is August 11, 2026, and all bids must be submitted through the formal requesting process outlined by GSE Construction. Primary points of contact for inquiries are Michael Demissie and Juan Catano, both reachable via email at mdemissie@gseconstruction.com and jcatano@gseconstruction.com respectively. The project is located at 966 Huber Street, Pismo Beach, CA 93433, with performance confined to this site in California. Bidders are expected to fully review the detailed project documentation before submitting competitive proposals, and no bids will be accepted without prior request and access to the comprehensive suite of project files.
GSE Construction Co., Inc.

POSTED

about 11 hours ago

DEADLINE

in 2 days
View Details