Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on January 8, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hammonton-Smartsville Shoulder Widening Project

Closed
2024-8098State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utility installation involving tunneling, boring, jacking, and micro tunneling, as well as site work such as land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs and signals, along with environmental support services including storm water pollution prevention and waste management. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate an ability to maintain labor harmony on the project. Quotes are due by November 18, 2025, and should be submitted through the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 6 days
NAICS: 237310
New
SLED
803_2027 PLANT MIX - PRIMARY
Solicitation # CM827PMA129935
The Virginia Department of Transportation (VDOT) is soliciting bids for contract CM827PMA129935, titled 2027 Plant Mix - Primary, which involves the production and placement of Thin Hot-Mix Asphalt Concrete Overlay (THMACO) and Balanced Mix Design (BMD) surface asphalt concrete across various locations, specifically including Route 42. The scope of work includes the application of tack coat, sinusoidal asphalt rumble strips, and pavement markings, as well as flexible pavement planing. Contractors must be prequalified to bid and are required to submit a Job Mix Formula (JMF) for approval at least two weeks prior to production. Key technical requirements include meeting Performance + Volumetric Optimized criteria for specific mix types and ensuring a minimum film thickness of 9 microns. The contract is subject to several federal and state regulations, including the Davis-Bacon Act, the Buy America Act, and the Build America, Buy America Act (BABA). Contractors must comply with non-discrimination and equal opportunity provisions and are encouraged to partner with Small, Women-owned, and Minority-owned (SWaM) businesses. Administrative requirements include the use of a VDOT-approved inventory tracking system and the submission of performance test results via the PLAID website within 48 hours of sampling. Payment is structured through monthly progress estimates based on the contractor's name, with interest accruing at one percent per month. Liquidated damages for violations of the Contract Work Hours and Safety Standards Act are set at $33 as of January 15, 2025.
Virginia Department of Transportation

POSTED

about 14 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Hammonton-Smartsville Shoulder Widening Project involves road and storm drain improvements along Hammonton-Smartsville Road in Yuba County, California. The project aims to enhance roadway safety and drainage infrastructure, with a contract value estimated between 5 million and 15 million dollars. The solicitation was posted on January 8, 2025, and interested parties are required to submit their responses by January 31, 2025. The project is managed by Yuba County under the NAICS code 237310, which pertains to highway, street, and bridge construction. The primary point of contact for inquiries is Robert Pontureri, reachable via email at [email hidden] or by phone at [phone hidden]. Additional project details and procurement information can be accessed through the provided online portal link.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Yuba County
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → Yuba County
Office AddressN/A
Contacts

Full Description

Show more
General work description: The work in general consists of road improvements and storm drain improvements along Hammonton-Smartsville Road in the County of Yuba.

More opportunities from California → Yuba County

Same awarding agency

NAICS: 237310
SLED
Waldo Road Over Dry Creek Bridge Replacement Project
Solicitation # BRLO-5916(092)
The Waldo Road Over Dry Creek Bridge Replacement Project, managed by Yuba County, involves the demolition of the existing structurally deficient bridge (Bridge No. 16C0006) and the construction of a new concrete box girder bridge approximately 100 feet upstream. The project includes realigning the roadway to correct substandard curves and raising the vertical profile of the bridge to improve water conveyance during flood events. Located in Wheatland, California, the work encompasses a 5.55-acre area and requires strict adherence to environmental and cultural protections, including the implementation of a Riparian Restoration Plan and compliance with CARB Tier 4 emission standards for off-road equipment. The project is subject to extensive regulatory oversight and environmental mitigation, as detailed in a Partially Recirculated Draft Environmental Impact Report. Key requirements include the employment of UAIC-certified Tribal Monitors for all ground-disturbing activities and the oversight of a qualified biologist to protect species such as the Western Pond Turtle and Chinook salmon. Construction is restricted by ecological windows, specifically prohibiting avian breeding season activities from March 1 to August 31 and limiting water diversion in Dry Creek to the period between July 1 and October 31. The project also involves the demolition of a historic bridge listed on the National Register of Historic Places, which is managed through a Memorandum of Agreement and specific documentation standards.
Highway, Street, and Bridge Construction

POSTED

about 2 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS