This Solicitation opportunity from Mississippi was posted on November 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Hancock High School Chiller On-Site Walkthrough for RFP Respondents
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Hancock County School District has issued a Request for Proposal (RFP) for the full replacement and installation of a new chiller system at Hancock High School, scheduled for 2025. This turnkey project requires vendors to supply, install, and integrate a new Trane Agility Chiller HDWA 400 460v3ph model along with all necessary equipment, cabling, and labor to ensure full operational capability with existing building systems. Vendors must attend a mandatory on-site walkthrough on December 3, 2025, with proposals due by December 15, 2025. The pricing must be all-inclusive, covering equipment, shipping, installation, training, technical support, and trash removal, and remain valid for 12 months from contract signing. The project includes providing a comprehensive Test and Balance (TAB) report, performed by an independent certified agency, to verify system performance and compliance with AABC or NEBB standards. If post-installation testing reveals deficiencies, the vendor is obligated to correct them at no additional cost. The place of performance and acceptance is the Hancock High School site in Mississippi. The evaluation criteria for awarding the contract prioritize best value, considering price, quality, vendor experience, prior positive engagements with the district, Mississippi-based vendor preference, and the ability to fully deliver and integrate the solution. Vendors must be authorized dealers in Mississippi, and all bidders exceeding $50,000 must provide a Certificate of Responsibility number in compliance with Mississippi state law, including for subcontractors exceeding this threshold. The district retains broad rights to reject any or all bids, waive technicalities, or award the contract in the district’s best interests, including award to other than the lowest bidder. Contract termination can occur for default or convenience, including non-availability of funds. Proposals may be submitted electronically or in sealed envelopes clearly marked with the solicitation title. All communications and questions must be directed to a central procurement email with strict deadlines for inquiries and addenda compliance. The project budget is estimated between $250,000 and $500,000, though no detailed line-item pricing is provided. Contract formation occurs upon acceptance by letter via email, and the district does not provide specific payment or invoicing instructions within the solicitation documents.
General Info
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Install Pier D High Pressure Air System, NSBREM-724-AOpen now, due in 21 days
- Springdale JCC –Recreation HVAC Repair or ReplacementOpen now, due in 13 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Organization & Contact Information
Full Description
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
