Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

HARBOR BLVD STREET REHABILITATION PROJECT

Closed
20260616028State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking a subcontractor for road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum opportunity has an estimated value between $100,000 and $250,000. The scope of work includes the replacement of 62,500 square feet of asphalt across five specific areas, the repair of five storm sewer drain structures, and the patching of five potholes. The selected contractor must provide all labor, materials, equipment, and supervision, completing the project within 90 consecutive business days following a written Notice to Proceed. The solicitation is open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities under NAICS code 237310. Bids are due by October 21, 2026, and must be submitted using the MTC Bid for Lump Sum Contract form, accompanied by a detailed cost breakout and a completed MTC Supplier Packet. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid submission. Award decisions will be based on overall best value. Compliance requirements include adherence to Construction Wage Rate Requirements (CWRR) and the provided Wage Determination. For bids equal to or exceeding $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. Payment will be processed via pay applications using AIA G702 and G703 forms, with a 10% retainage held until substantial completion and the submission of required closeout documentation, including operation and maintenance manuals.
Joliet Job Corps

POSTED

about 9 hours ago

DEADLINE

in 6 days
NAICS: 237310
New
SLED
ENG HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project
Solicitation # 2025-24/2025-28
The County of Marin is soliciting bids for the HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project (Project No. 2025-24/2025-28). Located at the intersection of Irving Drive and Butterfield Road in unincorporated San Anselmo, the scope of work includes installing two crosswalks, ADA-compliant curb ramps, Rectangular Rapid Flashing Beacons (RRFBs), and two bioretention basins, along with minor grind/pave and traffic striping. The project has an engineer's estimate of 550,000 dollars and a performance period of 35 working days. The contract will be awarded to the responsible and responsive bidder based on the lowest total base bid. Bidders must be registered public works contractors with the Department of Industrial Relations, hold a valid professional license, and submit a Bidder's Qualification Statement. Required submission documents include a bid security of at least 10 percent of the base bid, with performance and payment bonds each set at 100 percent of the total bid amount. Bids must be submitted via BidExpress by October 27, 2026, at 2:00 pm. The project is subject to California prevailing wage laws and requires compliance with the Americans with Disabilities Act and the Fair Employment and Housing Act. The contractor is responsible for implementing a comprehensive Quality Control program, while the County will provide Quality Assurance. Payment for change orders must be processed through the Department's internet billing system by the 15th of each month. A baseline schedule is required within 15 days of contract execution, with monthly updates due by the 24th.
County of Marin

POSTED

about 19 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The City of Fullerton is soliciting bids for the Harbor Blvd Street Rehabilitation Project, which involves extensive street improvements along Harbor Blvd and Chapman Ave. The scope of work encompasses the removal and construction of concrete hardscape, including sidewalks, curb ramps, driveway approaches, and gutters. Additionally, the project requires the installation of asphalt rubber hot mix pavement, traffic signal conduits, pullboxes, and the adjustment of manholes and valve boxes. Contractors will also be responsible for demolition, grading, traffic striping, signage, and necessary repairs to street lighting, landscaping, and irrigation, all while implementing required water pollution control measures. This solicitation, identified by bid number 44083 and solicitation number 20260616028, is managed by the City of Fullerton in California. Interested parties must submit their responses by the deadline of June 30, 2026. The project falls under NAICS code 237310 for highway, street, and bridge construction. Primary points of contact for this effort include Juan Zavala, Stephen Bise, and the city's capital improvement program office.

General Info

City of Fullerton bids for Harbor Blvd street rehabilitation due June 30, 2026.

Place of Performance

Fullerton, CA, 92832, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fullerton
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Juan ZavalaP.E. (Principal Civil Engineer), Stephen Bise (Public Works Director)

Full Description

Show more
Bid #44083: The project focuses on detailed street rehabilitation along Harbor Blvd and Chapman Ave in Fullerton. The scope includes removing and constructing concrete hardscape (sidewalk, curb ramps, driveway approaches, curb & gutter), installing new asphalt concrete pavement, adjusting valve boxes and manholes, installing traffic signal conduit and pullboxes, and implementing water pollution control measures. The work involves demolition, grading, paving with asphalt rubber hot mix (ARHM), traffic striping and signage, and related street lighting, landscaping, and irrigation repairs.

More opportunities from California → City of Fullerton

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS