Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on December 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Harbor Marina S-N Wave Attenuator Replacement

Closed
23-0030-MAState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between $80,000,000 and $100,000,000, with a solicitation expected around March 15, 2027. Construction is scheduled to begin in September 2027 and last approximately two years, spanning two dredging seasons from September 1, 2027, to August 31, 2029. The work is divided into two primary sequences: the construction of a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, including an access channel, and the subsequent maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth. The total scope involves mechanically dredging approximately 5,500,000 cubic yards of material using closed clamshell buckets. Specifically, 3,200,000 cubic yards will be removed to create the CAD cell, with material placed at Port Edgewood Basin, Fox Point Reach CAD cells, Prudence Island, and the Rhode Island Sound Disposal Site. The remaining 2,300,000 cubic yards of maintenance material will be placed within the newly constructed Edgewood Shoals North CAD cell. To meet strict environmental windows and project timelines, the contractor must maintain a production rate of at least 300,000 cubic yards every 30 calendar days, operating 24 hours a day, 7 days a week. Interested firms must submit a capabilities package by November 26, 2026, demonstrating experience with these production rates and open water placement in New England during winter months.
W2SD Endist New England

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica Public Works Engineering Division. The project involves comprehensive upgrades and improvements to the San Vicente and Mt. Olivette reservoirs, with an estimated contract value of $27,344,000. Bidders are required to hold a Class A General Engineering license. The scope of work includes civil, structural, and electrical improvements, such as the installation of flexible expansion joints, meter and valve vaults, and concrete-lined swales, as well as cathodic corrosion protection and SCADA integration. The contract specifies a performance period of 730 calendar days, though the sample contract mentions substantial completion within 520 calendar days from the Notice to Proceed. Bids must be submitted electronically via the OpenGov portal by November 5, 2026, at 3:00 pm. Key requirements include the provision of Labor and Material Payment and Performance Bonds for 100% of the contract sum, compliance with prevailing wages, and adherence to the Santa Monica Living Wage Ordinance. Liquidated damages for delays are set at $13,200 per day. The project is subject to rigorous inspection standards, including ASTM and CBC requirements, with the Prime Contractor responsible for contracting and billing Enterprise Automation for specific integration services.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 15 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

This contract involves the comprehensive replacement and repair of floating wave attenuators and related infrastructure at the Clearwater Harbor Marina, specifically targeting the marginal wharf and A-Dock areas. The project scope covers the removal of four existing floating wave attenuators and installation of three new 13-foot-wide attenuators arranged per the approved engineering drawings. To address alignment and functional needs, a new gangway will connect the new attenuators to existing structures on A-Dock, and additional steel pipe piles with guides will be installed to anchor portions of the marginal wharf. The work also entails replacing damaged electrical, water, and fire utility lines along the dock, replacing damaged transition plates and pile sleeves resulting from previous hurricane impacts, and restoring affected areas in compliance with environmental and construction standards. All construction activities must adhere strictly to the City of Clearwater's approved engineering plans, FDOT standard specifications, and multiple ASTM and AWS standards governing materials, welding, and structural integrity to ensure durability in a corrosive marine environment. The contractor is responsible for quality control, scheduling, environmental protection, and obtaining required approvals throughout the project. Delivery and installation inspections occur at both manufacturing plants and the job site, with final acceptance contingent on meeting detailed performance standards. Bid submissions must comply with prequalification requirements, incorporate necessary affidavits, and be submitted electronically by the specified deadlines. Although no contract value or detailed pricing is provided, the solicitation includes multiple lump-sum line items covering pile installation, concrete repairs, fender replacement, gangway installation, electrical upgrades, demolition, erosion control, and site restoration. The procuring agency is the City of Clearwater’s Public Works department, with designated points of contact provided for contract and procurement inquiries. The contract does not specify special clauses like key personnel requirements, options for extensions, or explicit FAR clause insertions, but emphasizes strict compliance with safety, environmental, and construction quality mandates throughout project execution.

General Info

The scope of this project includes the replacement of 4 floating wave attenuators on the marginal wharf and A-Dock, one finger pier, electrical and mechanical utilities within the project area, and replacement of cable-connections within the floating dock to accommodate the removal of the wave attenuators. The wave attenuators will be replaced by 3 13-foot-wide wave attenuators in the orientation presented on the drawings. Due to the alignment and size of floating docks to be removed and anticipated to be replaced with, a small gangway is needed to bridge the gap between the new and existing attenuators on A-Dock. Also, a new piles including pile guides as shown on the drawings will need to be installed to anchor the remaining portions of the marginal wharf. The work also includes replacing the water, fire and electrical lines that run along the dock from the marginal wharf through A-dock due to damage from the hurricane and replacement needed based on the removal and replacement of floating wave attenuators. Additionally, the contractor shall replace the transition plates at the south end of A-Dock from the previous attenuator replacement that were damaged during Hurricane Helene, as well as fixing the pile sleeves that were also damaged during the hurricane.

Documents

4

Clearwater Harbor Marina Wave Attenuator Replacement Revised Plans 2025-03-28

PDF, High priority: read this firstspecifications
High

Core Boring Logs for Wave Attenuator Replacement Clearwater Bayfront Marina

PDF, High priority: read this firstcore-boring-logs
High

Invitation to Bid 23-0030-MA Harbor Marina S-N Wave Attenuator Replacement

PDF, High priority: read this firstifb
High

Preliminary Geotechnical Investigation Report for Clearwater Bayfront Marina Wave Attenuator Replacement

PDF, High priority: read this firstgeotechnical-report
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Works
Contacts2 people available
OfficeClearwater, FL, 33756, USA
Organization / AgencyFlorida → Public Works
Office AddressClearwater, FL, 33756, USA
Contacts
Jennifer BurgettContract and Procurement Specialist
Kelly RogersProcurement Analyst II

Interested Companies (42)

caulfield associatesDoylestown, PA
Lincoln Surety GroupSarasotat, FL
ConstructconnectCincinnati, OH

See All 42 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The scope of this project includes the replacement of 4 floating wave attenuators on the marginal wharf and A-Dock, one finger pier, electrical and mechanical utilities within the project area, and replacement of cable-connections within the floating dock to accommodate the removal of the wave attenuators. The wave attenuators will be replaced by 3 13-foot-wide wave attenuators in the orientation presented on the drawings. Due to the alignment and size of floating docks to be removed and anticipated to be replaced with, a small gangway is needed to bridge the gap between the new and existing attenuators on A-Dock. Also, a new piles including pile guides as shown on the drawings will need to be installed to anchor the remaining portions of the marginal wharf. The work also includes replacing the water, fire and electrical lines that run along the dock from the marginal wharf through A-dock due to damage from the hurricane and replacement needed based on the removal and replacement of floating wave attenuators. Additionally, the contractor shall replace the transition plates at the south end of A-Dock from the previous attenuator replacement that were damaged during Hurricane Helene, as well as fixing the pile sleeves that were also damaged during the hurricane.

More opportunities from Florida → Public Works

Same awarding agency

NAICS: 339950
New
SLED
2709ITB - Citywide Banner Printing & Fabrication
Solicitation # 2709ITB
The City of Daytona Beach is soliciting bids under solicitation 2709ITB for the as-needed printing, fabrication, finishing, packaging, and delivery of various large-format signage, including vertical and horizontal pole banners, event banners, facility banners, and yard signs. This is a production and delivery only contract; installation, removal, and maintenance are specifically excluded. All bids must be submitted electronically via the OpenGov platform by November 19, 2026, at 3:00 pm, as paper submissions will not be accepted. Award will be granted to the lowest responsive and responsible bidder based on the combined total of all line item unit costs in the base bid pricing proposal. Qualified bidders must have at least three years of successful operation and possess the necessary organizational capacity and equipment to meet the city's requirements. Technical specifications mandate the use of heavy-duty vinyl for vertical pole banners with specific tensile ratings and double-sided full-color printing. Bidders are required to provide a bid security equal to 10 percent of the bid and, upon award, performance security equal to 100 percent of the contract price. Additionally, the successful contractor must maintain insurance with a combined single limit of at least 1 million dollars per occurrence and a general aggregate of 2 million dollars. The contract emphasizes strict quality control, requiring vendors to inspect products for dimensions and material quality before delivering them to the Public Works facility at 950 Bellevue Ave. Bidders must also comply with the U.S. Department of Homeland Security E-Verify system and provide a drug-free workplace certification. Local vendor preference under Code 30-86 will be considered as a primary tie-breaking factor. All artwork and production files provided by the city remain its exclusive property and must be protected from unauthorized distribution.
Sign Manufacturing

POSTED

about 20 hours ago

DEADLINE

in 22 days
View Details
NAICS: 541330
New
SLED
Construction, Engineering And Inspection (CEI) Services For The Sands Boulevard And Surfside Boulevard Bridge Repair Projects
Solicitation # 2026-RFP-PW-070-KR
The City of Cape Coral is soliciting proposals for Construction Engineering and Inspection (CEI) services for two federally funded bridge repair projects: the Sands Boulevard Bridge over Eternity Canal and the Surfside Boulevard Bridge over Maxine Canal. The selected engineering firm will provide construction contract administration to restore resiliency to bridge approaches, bulkheads, and shoreline protection. These projects are funded through the FDOT Local Agency Program and must adhere to FDOT manuals, FHWA requirements, and federal-aid compliance standards. The contract duration is 300 calendar days from the Notice to Proceed, and the consultant must be capable of supporting both projects concurrently or independently. The procurement follows a Qualifications-Based Selection process, with proposals due by November 5, 2026. To be responsive, firms must be FDOT prequalified and provide evidence of professional licensure in Florida. Evaluation is conducted by a Selection Advisory Committee based on personnel qualifications, team management, and prior experience. Awarded consultants must provide payment and performance bonds and meet comprehensive insurance requirements for professional and general liability. Compliance mandates include the Davis-Bacon Act, Build America Buy America Act, and specific environmental protections for threatened burrowing owls.
Engineering Services

POSTED

about 20 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237110
New
SLED
Wastewater Collections Point Repair and Improvements
Solicitation # 26-0060-UT
Solicitation 26-0060-UT is a unit price contract issued by the City of Clearwater Public Works department for Wastewater Collections Point Repair and Improvements. The scope of work is divided into six groups: Group A for sanitary sewer trenchless reconstruction, Group B for sewer cleaning and televising inspection, Group C for wastewater point repair, Group D for sanitary cleanouts and laterals, Group E for polyurethane manhole surfacing, and Group F for smoke and dye testing. Work is performed on an as-needed basis authorized through individual work orders, and the City is not obligated to a minimum or maximum quantity of work. The initial contract period is 365 consecutive calendar days from the Notice to Proceed, with the City reserving the right to renew for up to three additional years. The contract will be awarded to the lowest responsible and responsive bidder. Bidders must provide bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds upon award. Key technical requirements include compliance with the Florida Trench Safety Act, OSHA provisions, and the City's Utilities Standards and Specifications Manual. Performance is verified through pre- and post-installation CCTV inspections, and payment is contingent upon work being watertight and free of defects. Contractors are required to provide a one-year warranty, or a two-year manufacturer warranty if the standard term cannot be met from the date of substantial completion. Invoicing requires electronic submission of applications for payment accompanied by progress photographs, as-built documentation, and lien waivers.
Water and Sewer Line and Related Structures Construction

POSTED

about 24 hours ago

DEADLINE

in 8 days
View Details
New
SLED
Lift Station No. 85 Replacement
Solicitation # IFB27-0027
The City of Orlando, through its Public Works agency, is soliciting sealed responses for the Lift Station No. 85 Replacement project, identified as IFB27-0027. The project is located at 3915 South Lake Orlando Parkway, Orlando, Florida, and involves a lump sum contract for the installation, start-up, testing, and training of several critical systems. The scope of work includes hoist systems, HVAC systems, plumbing systems, and instrumentation and control systems, as well as the delivery of comprehensive O&M manuals. All work must comply with the 2008 ADA Standards for Accessibility and specific military and IEEE standards for performance testing and electromagnetic interference suppression. Responses must be submitted electronically via OpenGov by 2:00 pm local time on December 4, 2026. The contract will be awarded to the lowest responsive and responsible bidder based on the Total Base Bid. Requirements for award include a 10 percent bid bond, payment and performance bonds, and proof of insurance within two weeks of notification of intent to award. Contractors must adhere to Davis-Bacon Act wage determinations for heavy construction in Orange County and certify compliance with Florida Statutes regarding human trafficking. Payment is processed through signed applications for payment, which require the submission of certified payrolls via the City's electronic tracking system. Wright-Pierce, Inc. serves as the Engineer of Record for the project.

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS