Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on May 31, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Harwell Middle School Chillers Replacement

Closed
25-80State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, and compressed air systems. Additionally, the work includes a full NFPA-compliant fire suppression system, electrical distribution and lighting upgrades, building automation controls, and site improvements such as paving, drainage, and hazardous materials abatement. The estimated contract value is between 10 million and 25 million dollars, with a performance period of 730 days after award. The contract will be awarded based on the lowest price, with pricing required for two primary exhibit line items: building renovation and paving removal and replacement. Bidders must adhere to strict quality control standards, including a three-phase control system and specific technical standards such as MIL-STD-101 for piping and ASME A13.1 for color coding. Bonding requirements vary by proposal value, with projects over 150,000 dollars requiring bid, payment, and performance bonds. Administrative requirements include monthly invoicing via Wide Area Work Flow and compliance with the Davis-Bacon Act and the Americans with Disabilities Act. Proposals were due by November 23, 2026.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a firm-fixed-price design-build contract for the renovation and modernization of Transfer Facility Building 6594 at Naval Base Kitsap Bangor, Washington. With an estimated magnitude between 10 million and 25 million dollars, the project involves comprehensive demolition, the replacement of deteriorated components, and the construction of a 400 square foot addition for forklift battery charging. The scope includes critical upgrades to HVAC, fire protection, electrical systems, and the installation of a prefabricated paint booth and new bridge crane. A primary constraint is that the facility must remain operational and mission-capable throughout the process, requiring a strict two-phase execution plan with multiple mobilization and demobilization cycles. The project timeline requires work to commence within 15 calendar days of award, with the base bid completion due within 360 calendar days and an option period extending to 1,082 calendar days. Performance is subject to liquidated damages of 4,137 dollars per day for the base bid and 280 dollars per day for the option. Contractors must adhere to strict NAVFAC, UFC, and IBC standards, as well as cybersecurity and information safeguarding requirements under DFARS. Proposals must be submitted via the PIEE portal by December 7, 2026, and will be evaluated based on the most advantageous offer to the government, with a primary focus on price reasonableness.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 18 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes the installation of drywall, joint finishing, and painting for approximately 300 square feet of floor area in utility rooms and hallways, along with the temporary removal and re-installation of HVAC equipment such as furnaces and water heaters. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing, a detailed work plan including project phasing and occupied-building protection, and evidence of relevant experience. Award requirements include the provision of payment and performance bonding for the full project value, as well as general liability insurance with a minimum of 1 million dollars per occurrence, within ten days of award. Final acceptance is contingent upon the successful testing of all restored systems and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 5 hours ago

DEADLINE

in 2 days
NAICS: 236220
New
SLED
Construction of Building at Eagle Skate Park
Solicitation # 2026-ITB-PW-055-MR
The City of Cape Coral, Florida, is soliciting bids for the construction of a new building at Eagle Skate Park under solicitation number 2026-ITB-PW-055-MR. The project involves the construction of an approximately 3,870 square foot facility featuring office space, multipurpose rooms, a pro shop, a concession area, and support services for storage. The scope of work includes comprehensive site preparation, clearing, demolition, and the installation of concrete sidewalks, chainlink fencing, and specific landscaping. Technical requirements encompass detailed electrical, plumbing, and mechanical plans, with a particular emphasis on energy compliance and the protection of threatened burrowing owls in accordance with state and federal laws. Bids must be submitted electronically via the OpenGov platform, with the final response deadline extended to November 20, 2026, at 2:00 PM EST. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, based on an evaluation of resources, past performance, and professional standing. The performance period allows 365 calendar days for substantial completion and 395 calendar days for final completion from the date of the Notice to Proceed. Required submittals include a bid bond equal to 5 percent of the base bid, proof of E-Verify enrollment, and a detailed Bidder Information Statement and Questionnaire. Payment will be processed monthly via applications for payment reviewed by the project engineer.
Public Works

POSTED

about 15 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The Harwell Middle School Chillers Replacement project is a solicitation issued by the Ector County Independent School District in Texas, with a response deadline of June 16, 2025. The project involves replacing chillers at the school and is estimated to have a contract value between $500,000 and $1,500,000. Interested bidders are invited to submit proposals in accordance with detailed instructions outlined in the Invitation to Bid, which emphasizes the importance of thorough site inspection, careful review of construction documents, and adherence to submission procedures. A pre-bid conference is scheduled for June 10, 2025, to facilitate site assessment and clarify project requirements. Bidders must provide a bid bond equal to 5% of their proposal amount, and proposals are to be submitted on official forms, sealed, and signed by authorized personnel. The process requires detailed preparation, including obtaining complete sets of construction documents, verifying their accuracy, and submitting questions in writing for clarification, with responses issued via addenda. The district reserves the right to reject any or all proposals, waive irregularities, and award the contract based on the best value to the owner. The project site is accessible for inspection, and bidders are encouraged to coordinate access and work with the district’s representatives. The contract is to be performed under Texas sales tax exemption, and proposals must be valid for 60 days after submission, with no withdrawals permitted during this period.

Documents

1
PDF, High priority: read this firstrfp
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Building 262 Renovations FLETC GlyncoOpen now, due in 16 days
  • Repair Auto Maintenance Bldg 575Open now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Ector County Independent School District
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
INSTRUCTIONS TO BIDDERS
  INVITATION
Your firm is invited to submit proposals to the Owner, at the Owner's address indicated above, for the work described herein, on or before the deadline indicated above.
INSPECTION OF SITE
The site is also accessible for the inspection after the pre-proposal meeting.  Proposers are encouraged to visit the site and assess existing conditions.
PRE-BID CONFERENCE:  A Pre-Bid Conference meeting has been scheduled for Tuesday, June 10, 2025 @ 9:30 A.M. at ECISD Facilities Department - 1305 E. Schunior, Edinburg, TX

SECURITY BOND
Proposers will be required to provide Proposal Security in the form of a Bid Bond in the amount of 5 percent of the largest possible total proposal, including consideration of alternates, with each proposal. A Bid Bond shall be issued by a Surety acceptable to the Owner and meeting the requirements of General Conditions of the Contract for Construction. Bid Bonds shall be prepared on forms meeting all the requirements of applicable States of Texas statues. Bid Bonds shall be issued on forms acceptable to the Owner and shall include, as a minimum standard, the information, requirements and standard illustrated by AIA Document A310, latest revised edition available. Failure to provide the Bid Bond with the proposal will constitute a non-responsive proposal and the proposal will not be considered.
PROPOSAL WITHDRAWAL
Proposals will be required to be submitted under a condition of irrevocability for a period of 60 days after submission.  NO PROPOSALS MAY BE WITHDRAWN FOR A PERIOD OF 60 DAYS.
DOCUMENTS
Qualified offerors may obtain one (1) set(s) of Drawings and Project Manuals from: Engineer - Sigma HN Engineers, 701 S. 15th St., McAllen, TX 78501, Sign up to see this detail.
Subcontractors may obtain one (1) set of Drawings and Project Manuals from: Engineer - Sigma HN Engineers, 701 S. 15th St., McAllen, TX 78501, Sign up to see this detail.
No deposit will be required for a set of Drawings and Project Manuals issued. Partial sets will not be issued.
Complete sets of Construction Documents shall be used in preparing proposals; neither the Owner nor the Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Construction Documents.
The Owner or Engineer in making copies of the Construction Documents available on the above terms, does so only for the purpose of obtaining proposals on the work and does not confer a license or grant for any other use.
Complete sets of Drawings and Project Manuals are on file at the following locations and subcontractors may examine them there:
ECISD Facilities and Maintenance Department, 1305 E. Schunior, Edinburg, TX
  A.G.C. PLAN ROOMS, (McAllen, Harlingen, Brownsville)   DODGE REPORTS (Online)   EXAMINATION
Offerors shall carefully examine the Construction Documents and the construction site to familiarize themselves with existing local conditions under which the Work is to be performed.
Extra payments will not be authorized for work that could have been foreseen by careful examination of the site. Submission of a proposal shall constitute acceptance, by the offeror, of existing site conditions as a part of the requirements for this work.
Offerors shall carefully examine the Construction Documents to verify that they agree with the Table of Contents in the Project Manual, the Index of Drawings Sheet on the Drawings, and the Cover Page of all Addenda. Offerors shall be responsible for obtaining any pages or sheets which have been inadvertently left out during the printing process.
All entities providing proposals on any portion of the work contained in the Construction Documents shall ascertain the completeness of the set of documents.   The Construction Documents are printed by an independent vendor and, although the Engineer endeavors to check the documents for completeness, the Engineer has, in the past, discovered missing or misplace sheets in the drawings and the Specifications.   Each entity receiving a set of Construction Documents shall check the indexes against the sheets or pages contained in the sets.   Should pages or sheets be found to be misplaced or missing, immediately notify the Engineer who will give direction as to placement or provide the sheets or pages that are missing.   Failure to notify the Engineer means the offeror is providing a proposal based on a complete set of Construction Documents.   INTERPRETATION OF CONSTRUCTION DOCUMENTS
Offerors shall promptly notify the Engineer of any ambiguity, inconsistency, or error which they may discover upon examination of the Construction Documents or of the site and local conditions. Do not dimension the drawings. Any dimensions, questions, should be directed to the Project Manager.
Submit all questions regarding clarification or interpretation of Construction Documents to the Office of the Engineer:  Gabriel Hinojosa - Sign up to see this detail and Edinburg CISD Maintenance & Facilities, Roberto S. Gomez – Sign up to see this detail and Ramon Villalobos - Sign up to see this detail.

Submit all questions in writing. In the interest of time, requests may be made by telephone, but they must be confirmed in writing the same day. Replies to questions will be issued to all Offerors in the form of an Addenda. General contractor and subcontractors shall submit questions in writing seventy-two (72) hours prior to opening of proposals.
Make requests for interpretations as early as possible so as to allow adequate time to prepare and issue Addenda.
All Offerors shall check with the Engineer within seventy-two (72) hours prior to Opening of proposals to secure all Addenda. The Engineer will not be responsible for oral clarification.
BASIS OF PROPOSALS
Proposals shall be on a lump sum basis for each and or combined proposal packages and shall include all costs for these projects as described and indicated by the Construction Documents. Basis for proposals shall be on brands, materials, processes, products, persons or organizations, etc.
Proposals shall include all unit price costs and all Alternate costs as indicated by the Construction Documents and Proposal Form.
PROPOSALS
Proposals shall be made on unaltered Proposal Forms furnished by the Engineer. No oral, telephone or personal Proposals will be considered. All blank spaces shall be properly filled in by typewriter or manually in ink.
Where so indicated by the makeup of the Proposal Form, sums shall be expressed in both words and figures, and in case of discrepancy between the two, the written amount shall govern.
Any alteration or erasure to information entered in the blank spaces must be initialed by the signer of the proposal.
Original typed sheets shall be submitted, signed in longhand below the typed name of the person authorized to bind the offeror to a Contract.
Wherever the offeror is a corporation, Proposal must be signed with the legal name of the corporation followed by the name of the State of Incorporation and the legal signature of a person authorized to bind the corporation to a contract.
Failure to submit a proposal on the form requested, or the inclusion of conditions, limitations or previsions, distorting the intent of the Construction Documents, will render the Proposal irregular and subject to rejection.
MANUAL SUBMITTALS
Submit proposal, Security Bond and other required data in an opaque, sealed envelope. Submit proposal at the time and place shown in the Notice for Competitive Sealed Proposals.
Envelopes shall be addressed to the Owner and identified with the Project Name and the name and address of the offeror.
If the Proposal sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the notation “PROPOSAL ENCLOSED” on the face thereof. No envelopes shall be opened until the date and time proposals are to be received.
The District is requesting one (1) original, one (1) copy and one (1) digital copy on a USB drive.
MODIFICATION OR WITHDRAWAL OF PROPOSAL
A Proposal may not be withdrawn or cancelled by the offeror for a period of sixty (60) days following the time and date designated for the receipt of proposals
Prior to the time and date designated for receipt of Proposals, Proposals submitted early may be modified or withdrawn only by notice to the party receiving Proposals at the place and prior to the time designated for receipt of Proposals.
Modification of Proposals shall be in writing over the signature of the offeror or be by telegram; if by telegram, written confirmation over the signature of offeror must have been mailed and postmarked on or before the date and time set for receipt of Proposals; it shall be so worded as not to reveal the amount of the original Proposal.
Withdrawn Proposal may be resubmitted up to the time designated for the receipt of Proposals provided that they are then fully in conformance with these Proposal Instructions.
Security bond shall be in an amount sufficient for the Proposal as modified or resubmitted.
CONSIDERATION OF PROPOSAL
Properly identified Proposals received on time will be considered.
The Owner shall have the right to reject any or all Proposal and in particular to reject a Proposal not accompanied by any required security bond or data required by the Contract Documents or a Proposal in any way incomplete or irregular.
The Owner shall have the right to waive any formality or irregularity in any proposal received.
If the Owner accepts any Alternates, he shall have the right to accept them in any order or combination.
It is the intent of the Owner to award a contract to the offeror submitting the proposal providing the “best value’ to the Owner provided the Proposal has been submitted in accordance with the requirements of the Contract Documents, selection criteria and adopted by the Owner.
LOCATION AND ACCESS TO PREMISES
The project site location: Refer to vicinity map on drawings.
The offeror shall have access to the premises for the purpose of acquainting himself with the conditions, delivering equipment, and performing the work necessary to fulfill the contract. Offeror shall cooperate with the other contractors who may concurrently be working on the premises, integrating his work with that of others, all to the best interest of the total work and its orderly completion. The offeror must schedule with the Architect an agreed upon date and time to access premises. Architect is to submit a list to Roberto S. Gomez, Director of Facilities.
STATE SALES TAX
The Owner will furnish the Contractor proof or Certificate of Exemption upon award of contract.
This Contract is to be performed for an exempt organization as defined by Title 2; Subtitle E; Chapter 150 of the Texas Limited Sales, Excise and Use Tax Act and Section 151.311 of the State Statutes.
Proposer shall not include sales tax in their proposal.
REJECTION
The Owner reserves the right to reject any or all Proposals, and to waive any irregularities or formalities.
PROPOSAL FORM
The undersigned, as bidder(s), declares that the only person or parties interested in this proposal as principals are those named herein, that this proposal is made without collusion with any other person, firm or corporation; that he has carefully examined the Form of Contract, Notice to Bidders, General Conditions, Special Provisions, Measurement and Basis of Payment, specifications and the plans thereon referred to, and has carefully examined the locations, and conditions and classes of materials of the proposed work; and agrees that he will provide all the necessary labor, machinery, tools, and apparatus, and other items incidental to construction, and will do all the work and furnish all the materials called for in the contract and specifications in the manner prescribed therein and according to the requirements of the Engineer as therein set forth.
It is understood that the following quantities of work to be done at unit prices are approximate only and are intended principally to serve as guide in evaluating proposals.
It is further agreed that the quantities of work to be done at unit price and materials to be furnished, may be increased or diminished as may be considered necessary, in the opinion of the Engineer, to complete the work fully as planned and contemplated, and that all quantities of the work, whether increased or decreased, are to be performed at the unit prices set forth below except as provided for in the specifications.
It is further agreed that lump sum prices may be increased to cover additional work ordered by the Engineer, but not shown on the plans or required by the specifications, in accordance with the provisions of the General Conditions. Similarly, they may be decreased to cover deletion of work so ordered.
The 5% proposal security accompanying this proposal shall be returned to the bidder, unless in case of the acceptance of the proposal the bidder shall fail to execute a contract and file a performance bond and payment bond within the ten (10) days after its acceptance, in which case the proposal security shall become the property of the OWNER, and shall be considered as payment for damages due to delay and other inconveniences suffered by the Owner on account of such failure of the bidder, it is understood that the Owner reserves the right to reject any or all proposals.
ECISD highly recommends responses be submitted electronically though this electronic bidding system as it helps expedite the bidding process and helps to alleviate errors. Manual responses will still be accepted as long as they are received by the close date and time listed on this bid event. NO EMAILED OR FAXED RESPONSES WILL BE ACCEPTED FOR MANUAL SUBMITTALS.
  BOARD MEMBERS: David Torres - President, Carmen Gonzalez - Vice-President, Letty Flores - Secretary, Luis Alamia - Member, Xavier Salinas - Member, Leticia "Letty" Garcia - Member, Dominga "Minga" Vela - Member, Dr. Mario H. Salinas - Superintendent of Schools.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS