Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on July 15, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hastings Water Transmission Main Project - Arpa Funded

Closed
SB-1923-0-2024/BMState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The project involves constructing a new water transmission main originating from the Hastings Water Treatment Plant, with the primary line (Water Transmission Line #1) extending approximately 4,300 linear feet of 12-inch PVC pipe along N Dancy and St. Johns Avenue to connect with an existing main on N Main Street, utilizing open cut and HDD installation methods within County and FDOT right-of-way and easements. Additionally, the County is considering multiple bid alternates for a second transmission line (Water Transmission Line #2), which would run from the Hastings WTP site southward along S Dancy Avenue, then eastward along George Miller Road, with various modifications in installation techniques (open cut and HDD) at different segments, including crossing CR 13 South and transitioning between installation methods near station 14+44 and other key points. The third alternate proposes extending the line further south along George Miller Road to SR207, with a combination of open cut and HDD methods, terminating at the northern shoulder of SR207. The project is federally funded through the American Rescue Plan Act and is managed by St. Johns County, Florida, with a contract value estimated between 2 and 4 million dollars. The solicitation was posted on July 15, 2024, with responses due by August 14, 2024.

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → St. Johns County
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → St. Johns County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The purpose of the project is to construct one (1) new water transmission main extended from the Hastings Water Treatment Plant (WTP): Water Transmission Line #1: New water transmission main from the existing Hastings WTP along N Dancy and St. Johns Avenue to a tie in location to an existing main on the east side of N Main Street. Includes installation of approximately 4,300-LF of 12-inch DR-18 C-900 PVC via open cut and 16" HDPE DR-11 via HDD, including piping, fittings, valves, hydrants and other appurtenances. Installation will be in County and FDOT right-of-way (ROW) and acquired easements. Designed by Ardurra.
The County is seeking to construct one (1) additional new water transmission main that is being considered as a Bid Alternate #1: Water Transmission Line #2: The work will begin at the 12-inch stub-out at the Hastings WTP site and continue south along S Dancy Avenue via open cut and HDD before turning east at the S Dancy Ave and George Miller Road intersection. The proposed water main will continue eastbound along the easement north of George Miller Road to station 14+44. Designed by Mott Macdonald.
For Bid Alternate #2 – Water Transmission Line #2, the County is proposing the open-cut installation will change to HDD near station 14+44, and the pipe route will cross the CR 13 South and George Miller Road intersection, where the pipe alignment will transition to the easement south of George Miller Road. The proposed installation will change to open-cut near Vanessa Ave., and the Alternate Bid 2 portion of the contract will terminate just past the 12” x 8” stub-out.
For Bid Alternate #3 – Water Transmission Line #2, the County is proposing the water main to continue along the easement south of George Miller Rd. to Sta. 46+00 via open-cut. Here the proposed water main will shift to installation via HDD, and the alignment will transition to the northern shoulder of George Miller Road. The proposed water main will transition back to open-cut installation before turning north into the SJC utility easement north of Smith Road, where it will continue north until its termination at the southern shoulder of SR207. The project includes Federal funding through the American Rescue Plan Act (ARPA).

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS