Hazardous Waste Facility Operation and Post Closure Permit for Quemetco
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The California Department of Toxic Substances Control (DTSC) has approved the renewal and split of the Hazardous Waste Facility Operation Permit and Post-Closure Permit for the Ecobat Resources, Inc. facility in Industry, California, effective November 21, 2025. This approval transitions the existing combined permit into two distinct permits: a five-year Operation Permit and a ten-year Post-Closure Permit, both tied to the facility located at 720 South 7th Avenue. The Operation Permit authorizes the continued treatment, storage, and handling of hazardous waste for the purpose of recovering lead from spent lead-acid batteries and other secondary sources, without any increase in facility capacity. The Post-Closure Permit ensures the long-term environmental management of the site, including cover maintenance, groundwater and stormwater monitoring, and security measures. Minor facility modifications approved under the Operation Permit include installing a sump and power pump in the battery storage area’s secondary containment, removing and replacing the containment building floor with a new leak detection system, correcting tank issues, raising the wastewater treatment plant berm, and operating two dewatering units—a centrifuge and compression auger—to remove free liquids. These upgrades are designed to strengthen containment and prevent the migration of hazardous constituents into soil, groundwater, or surface water. The project builds upon the environmental analysis conducted in the 2005 Final Environmental Impact Report, with DTSC determining that the proposed activities will not result in new or substantially more severe environmental impacts. As the lead agency under CEQA, DTSC concluded the project will not have a significant effect on the environment, adopted a mitigation monitoring plan, and made all required findings, but did not issue a Statement of Overriding Considerations. The permit conditions are enforceable regulatory obligations, not contractual terms, and oversight is the responsibility of DTSC, with Sam Coe and William Heung serving as the primary points of contact for compliance and permitting matters. No federal procurement or financial terms are involved, as this is a state regulatory permitting action governed by California Health and Safety Code and Title 22 regulations.
General Info
Agency
NAICS
Place of Performance
Industry, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
