This Solicitation opportunity from California was posted on May 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HCTP Cleanout and Clarifier Beach Repairs Project (MI 2646)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The HCTP Cleanout and Clarifier Beach Repairs Project (MI 2646) is a public works initiative by the City of Thousand Oaks, California, aimed at repairing and replacing critical infrastructure at a treatment facility. The scope includes repairing one existing clarifier scum beach unit, replacing a second unit, removing and replacing a failed cleanout pipe and its riser, performing minor excavation, and conducting minor asphalt concrete repairs. All work must comply with Drawing Number 26-08A, Sheet 4, the published specifications, and the full contract documents. The Contractor is responsible for furnishing all labor, materials, tools, equipment, transportation, and incidentals, including fuel, power, water, and communication services. The project is subject to strict inspection and acceptance protocols by the Engineer or City, with all materials requiring rigorous testing per ASTM standards and prior notification for manufacturing and inspection. The Contractor must maintain compliance with prevailing wage laws, the Federal Occupational Safety and Health Act, and California Code of Regulations Title 8, while also adhering to the Immigration Reform and Control Act and the Americans with Disabilities Act. All bidders must be currently registered with the California Department of Industrial Relations and provide certifications under the Iran Contracting Act and non-collusion declarations under penalty of perjury. The contract will be awarded using the lowest price technically acceptable (LPTA) method to the lowest responsible bidder who submits a responsive bid, with bid evaluation gating out unbalanced pricing, non-responsiveness, or lack of responsibility. Payment is made monthly based on undisputed progress submissions, which require detailed measurements and adjusted quantity lists to support each request. The City retains the right to adjust quantities of unit price items by up to 25% without changing unit prices. The Contractor is required to post both a Performance Bond and a Payment Bond with an admitted California surety and maintain Commercial General Liability insurance with limits of at least $5 million per occurrence and $10 million general aggregate, naming the City as an additional insured with subrogation waived. Insurance must remain in force for the duration of the contract, including any extensions, and for three years after completion. A preliminary construction schedule must be submitted within ten days of award, with a final as-built schedule due upon project completion. Time is of the essence, and liquidated damages apply for each calendar day of delay beyond the designated completion date. The Contractor must remove all temporary facilities within seven days after work completion and discontinue temporary utilities upon City notice. All products must be
General Info
Place of Performance
CA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (22)
See All 22 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
More opportunities from California → Public Works
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
