Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on December 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

HCUD Admin and Wiscon Facilities Improvements

Closed
25-C00948/FCTState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The project has an estimated value of 16,690,000 dollars. This solicitation is set aside for Small Businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation criteria focusing on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. The agreement is based on EJCDC standard forms, requiring performance and payment bonds, as well as proof of insurance. Bids are due by November 10, 2026, with a final bid opening date of November 12, 2026. Contract administration involves monthly progress payments due 30 days after presentation to the owner, subject to review by the Engineer and the Resident Project Representative. The contractor must adhere to rigorous technical standards, including AWS D1.2 for welding and NEMA standards for motors. Materials must be delivered in original manufacturer packaging with specific labeling and storage requirements, such as maintaining a minimum ambient temperature of 45 degrees Fahrenheit for coatings. The project commences upon the issuance of a Notice to Proceed, which typically occurs within 30 to 60 days of the bid opening or effective date.
Don Moorhead Construction, Inc.

POSTED

24 minutes ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of FRP reinforcing systems. Mechanical and structural requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation of new slide gates and modifications to existing sluice gates. Additional technical tasks include the rehabilitation of reactor mixers and aerators, the installation and operation of a temporary 11 MGD pumped bypass, and extensive electrical and instrumentation upgrades, including the replacement of motor control center components. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Requested services and supplies include lead abatement, metals fabrication, painting and coatings, trucking and hauling, and the provision of access hatches. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Submissions should be based on Garney Standard PO and Subcontract Forms, with any exceptions submitted as redlines.
Garney Pacific, Inc.

POSTED

24 minutes ago

DEADLINE

in 20 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of a new Mountain Avenue Lift Station with two submersible pumps and a new SCE power connection, modifications to the RP-2 Lift Station to include a standby generator and an elevated electrical platform for flood protection, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and electrical and instrumentation and control. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on encouraging participation from minority-owned and disadvantaged business enterprises. Bids are due by October 29, 2025, at 2:00 PM.
Filanc

POSTED

24 minutes ago

DEADLINE

in about 8 hours

AI Contract Overview

Show more

The contract involves comprehensive improvements to the Hernando County Utilities Department's administrative and Wiscon site parking lots in Florida, including asphalt overlay, milling, and paving of designated areas. It also encompasses the construction of a stormwater drainage roof gutter system, expansion of an existing drainage retention area, installation of a truck wash system, and various stormwater infrastructure enhancements across both sites. Additionally, the project requires sidewalk repairs, installation of beacons, signage, thermoplastic pavement markings, and sod replacement for disturbed areas, all in accordance with the approved plans and specifications. A significant component of the work is the installation of a new central sewer collection system, complete with a pump station and related appurtenances built to HCUD standards, alongside electrical upgrades coordinated with the electrical service provider. The project also includes constructing a new Fuel Island, ensuring all site improvements adhere to HCUD and Hernando County Facility Design guidelines. The contractor is responsible for providing all labor, equipment, materials, and supplies necessary to complete the project efficiently and professionally, following the specified standards. The solicitation was posted in late 2024, with a response deadline in early February 2025, and the project budget ranges between two to five million dollars.

General Info

Documents

13

25-C00948/CT HCUD Admin and Wison Facilities Improvements

PDF, High priority: read this firstitb
High

Contract 13-R002 Task Order 58: Admin Pavement & Roof Gutter Civil Plans

PDF, High priority: read this firstspecifications
High

Contract 13-R002 Task Order 58 - HCUD Construction Plans

PDF, High priority: read this firstspecifications
High

Contract 13-R002 Task Order 58: HCUD Operations Site Improvements Civil Plans

PDF, High priority: read this firstspecifications
High

Contract 18-R00045: HCUD Operations Site Improvements Fuel Island Civil Plans

PDF, High priority: read this firstspecifications
High

Exhibit C - Geotechnical Engineering Reports (HCUD Site Improvements)

PDF, High priority: read this firstspecifications
High

Exhibit D - ERP Permit No. 43023165.001 (HCUD Administration)

PDF, High priority: read this firstspecifications
High

Hernando County Utilities Dept - Exhibit A: General Requirements and Technical Specifications

PDF, High priority: read this firstspecifications
High

ITB 25-CG00780/CT - HCUD Admin and Wison Facilities Improvements

PDF, High priority: read this firstcontract-document
High

OPS Fuel Island Electrical Plans

PDF, High priority: read this firstspecifications
High

OPS Site Improvements Landscape Plans

PDF, High priority: read this firstspecifications
High

25-C00881 Construction Documents Required After Award

PDF, Low prioritycontract-document
Low

Hernando County 2025 Holiday Schedule

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Utilities
Contacts1 person available
OfficeN/A
Organization / AgencyFlorida → Utilities
Office AddressN/A

Full Description

Show more
This project consists of asphalt overlay of the entire Hernando County Utilities Department (HCUD) Admin and Wiscon site parking lots, in Hernando County, Florida. Several areas will be milled and paved. There will also be construction of a storm water drainage roof gutter system, enlarging an existing drainage retention area (DRA), a truck wash system, and various stormwater improvements on each site. Sidewalk repair will be required. Incidental work includes compliance with the storm water pollution prevention plan, the installation of beacons, signage, thermoplastic pavement markings, and sodding of the disturbed areas, with all proposed work per the plans and specifications. The project also entails a new central sewer collection system to be installed complete with a new pump station and appurtenances constructed to HCUD standards. Electrical upgrades will also be performed by the electrical service provider and coordination will be required. A new Fuel Island will also be constructed as part of this project. All site Improvements are as shown per plan, all construction will be to HCUD specifications, and The Hernando County Facility Design guidelines shall be followed. The contractor shall furnish all labor, vehicles, fuel, tools, equipment, parts, supplies, materials, and fees necessary to accomplish the work set forth in a timely and professional manor per HCUD specification.

More opportunities from Florida → Utilities

Same awarding agency

NAICS: 237110
SLED
Replacement of Water Service Lines (Age and/or Emergency)
Solicitation # 26-T01417
Hernando County Utilities is soliciting bids for a term contract under solicitation number 26-T01417 for the replacement of water service lines due to age or emergency conditions. The project requires a licensed underground and excavation contractor registered in the State of Florida to provide all labor, materials, and equipment for the installation of 1-inch and 2-inch long side and short side water services using open cut and trenchless methods. Key technical requirements include the installation of corporation stops, service tubing, TPS T3 service saddles, and TPS Quick-Cam repair clamps, as well as comprehensive roadway restoration involving asphalt milling, concrete replacement, and full depth lime rock backfill. The estimated annual budget for these services is 1 million dollars. Bids must be submitted via the County eProcurement Portal by November 9, 2026, at 10:00 a.m. local time. Evaluation is based on price, completeness, compliance, and the bidder's resources, with a price preference of up to 5 percent available for local vendors. Performance is required within 14 calendar days of receiving a purchase order, and contractors must provide pre-construction audio-video documentation and passing density tests for roadway backfill prior to payment. For projects valued at 250,000 dollars or more, both performance and payment bonds are required. Payments are made via ACH within 45 days of invoice submission.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS