Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

HDPE Piping and Valve Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → County of SacramentoView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Sloughhouse, CA, 95683, USA

Set-Aside

NONE

Documents

This scope was carved out of 41019.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Kiefer Landfill Basin Discharge Piping

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → County of Sacramento
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → County of Sacramento
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs High-Density Polyethylene (HDPE) piping, fittings, and valves for prime contractors on County of Sacramento Department of Waste Management and Recycling projects. Performs fusion welding of HDPE pipe and tubing, installs valves, fittings, and utility vaults for cleanouts. Adheres to ASTM and ANSI standards and manufacturer specifications. Delivers a completed HDPE piping system and valve vaults.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is being managed by Filanc and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is extensive, encompassing pipeline infrastructure such as pipe installation, valves, welding, and cathodic protection, as well as civil engineering tasks including paving, striping, flatwork, precast vaults, fencing, and potholing. Technical and environmental services are also required, including surveying, testing and inspections, settlement monitoring, videography, SWPPP implementation, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, with a strong emphasis on the participation of SBE, MBE, and WBE entities. Filanc has indicated a willingness to assist qualified diverse firms with bonding, insurance, and equipment to encourage their participation. Bids and quotes for the various project scopes must be submitted by 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications at no cost by contacting Julia Masaitis.
Filanc

POSTED

about 13 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of associated appurtenances such as trenchless crossings, air release valves, blowoff assemblies, valves, and fittings, as well as connections to existing water facilities. Additional requirements encompass the construction of flow control facility components, site improvements, pavement removal and restoration, traffic control, and the overall commissioning and disinfection of the system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for this project, with a response deadline of September 18, 2026, by 2:00 PM PT. The solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, DBE, and DVB. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Requested trade scopes include trenchless construction, steel pipe welding, electrical and instrumentation, cathodic protection, and various restoration and hauling services. Point of contact for the project is Alyssa Callaway.
Garney Pacific, Inc.

POSTED

about 13 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins with diameters of 54 and 145.5 inches. Additional structural requirements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and various piping systems. The technical execution of the project requires specialized civil works, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises. James W. Fowler Co. provides specific support for M/W/DBE subcontractors, including assistance with bonding, insurance, lines of credit, and the procurement of materials. Bids are due by September 29, 2026, and all negotiations must be finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 13 hours ago

DEADLINE

in 26 days
View Details

More opportunities from California → County of Sacramento

Same awarding agency

NAICS: 237990
New
SLED
Kiefer Landfill- Module 5, Phase 1 Liner Construction
Solicitation # 20260901044
The County of Sacramento is soliciting bids for the construction of the Module 5, Phase 1 base liner system and related structures at the Kiefer Landfill in Sloughhouse, California. This project involves the development of approximately 24 acres, including earthwork for soil excavation and stockpiling, the installation of a multi-layer base liner system consisting of HDPE geomembranes, GCL, and geotextiles, and the construction of a leachate collection and removal system. Additional infrastructure work includes surface water drainage structures, perimeter access road extensions, and the installation of utility alignments for electrical power, landfill gas header pipes, and leachate force mains. The estimated construction cost is 29 million dollars, which includes a 500,000 dollar bonus for early completion by March 15, 2028. The contract will be awarded to the lowest qualified, responsive, and responsible bidder. Bids must be submitted electronically via the Sacramento County portal by October 8, 2026, at 2:00 PM. Requirements for bidders include a bid bond of at least 10 percent of the aggregate bid sum, a valid CSLB license, and registration with the California Department of Industrial Relations. The successful contractor must provide performance and payment bonds for 100 percent of the contract price and adhere to prevailing wage requirements. The project has a completion timeline of 350 working days, with liquidated damages set at 10,000 dollars per calendar day for delays beyond the established completion date. Quality assurance is managed through a comprehensive CQA plan and strict testing requirements for all liner layers and welding certifications.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
SLED
Kiefer Landfill Basin Discharge Piping
Solicitation # 41019
The County of Sacramento, Department of Waste Management and Recycling, is soliciting sealed bids for the Kiefer Landfill Basin Discharge Piping project located in Sloughhouse, California. The project involves replacing a deteriorating 6-inch HDPE outlet pipe with approximately 1,132 feet of new 8-inch HDPE piping, which will be connected to existing 12-inch PVC piping at South Deer Creek. The scope of work includes the installation of a new air relief valve, the placement of new culverts at two road crossing locations, and the subsequent repair of the access road. Additional requirements include excavation, trenching, backfilling, selective demolition of existing piping, and site cleanup. The estimated construction cost for the project is 120,000 dollars, and all work must be completed within 45 working days. Bids must be submitted electronically via the SacCountyEbids portal by 2:00 PM on September 24, 2026. The award will be based on the base bid only. Bidders must provide bid security of at least 10 percent of the aggregate bid sum and are required to execute performance and payment bonds for 100 percent of the contract price upon award. The successful contractor must adhere to California prevailing wage laws and CAL-OSHA regulations, including the provision of independent sanitary facilities for all personnel. Technical compliance requires adherence to the County of Sacramento Standard Construction Specifications revised November 2024, as well as AWWA standards for pipe installation and hydrostatic testing. Final payment is contingent upon the submission of project record documents and the approval of quantities by the County.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 21 days
View Details