Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Department Of Energy was posted on November 17, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Heavy Haul Transportation to MFC

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract, titled Heavy Haul Transportation to MFC, is issued by the Battelle Energy Alliance for the Department of Energy. The project involves the specialized transportation of oversized components, such as skids and 70-ton shielding blocks, from various fabrication sites to the Materials and Fuels Complex at the Idaho National Laboratory in Idaho Falls. The scope of work encompasses all necessary logistics, including detailed route planning, securing required permits, and professional rigging services. The opportunity is categorized under NAICS code 484220 for specialized freight trucking. Interested parties must submit their responses by the deadline of December 24, 2025. Performance of the contract will take place within the 83415 zip code area of Idaho Falls.

General Info

NAICS

484220 - Specialized Freight (except Used Goods) Trucking, Local

Place of Performance

Idaho Falls, ID, 83415, USA

Set-Aside

NONE

Documents

This scope was carved out of INL-26-004.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

NRIC Reactor Supplemental Shielding Construction

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Tree Material Hauling and DisposalOpen now, due in 17 days
  • Heavy Equipment Transport (ATV Delivery)Open now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Battelle Energy Alliance–doe Cntr
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Transportation of oversized components (e.g., 70-ton shielding blocks, skids) from fabrication sites to the Materials and Fuels Complex (MFC) at INL, including route planning, permitting, and rigging.

More opportunities from Department Of Energy → Battelle Energy Alliance–doe Cntr

Same awarding agency

NAICS: 335910
New
Federal
Long-Duration Energy Storage (LDES) Battery System
Solicitation # INL-26-050
Idaho National Laboratory (INL) and Argonne National Laboratory (ANL) are seeking Expressions of Interest (EOI) for non-lithium, rechargeable electrochemical long-duration energy storage (LDES) battery systems to undergo benchmark performance testing. The requirement includes two module-scale systems (100-150 kWh, 10-15 kW) to be delivered to INL and one full-scale system (1000-1500 kWh, 100-150 kW) to be delivered to ANL. All systems must support at least 10 hours of continuous discharge, operate between 0 to 50 degrees Celsius, and possess a minimum field lifetime of 15 years. Technical specifications require a 3-phase 480 VAC interface, an isolated 800-1500 VDC export, and support for SCADA protocols such as Modbus TCP/IP, DNP3, and IEC 61850. Systems must comply with NFPA 855, UL 9540/9540A, and NEC/IEEE standards, and vendors must provide comprehensive hazard assessments and emergency response instructions. The delivery timeline specifies that modules should arrive at INL approximately three months after final design acceptance, while the full-scale system is due at ANL within six months. This EOI process is a preliminary step to identify qualified vendors for a future Request for Proposal (RFP). Interested parties must submit a consolidated PDF or Word document including technical descriptions, physical characteristics, safety documentation, indicative pricing, and a project schedule to Chase Egbert by December 8, 2026.
Battery Manufacturing

POSTED

about 12 hours ago

DEADLINE

in 21 days
View Details
NAICS: 334519
Federal
ATR Plant Protection System (PPS) Seismic Switch Replacement
Solicitation # INL-27-002
Battelle Energy Alliance, LLC, acting as the management and operating contractor for the Department of Energy owned Idaho National Laboratory, has issued an Expression of Interest under solicitation number INL-27-002. The objective is to conduct market research and acquisition planning to identify qualified suppliers capable of replacing obsolete Kinemetrics Model TS-3A seismic switches within the Advanced Test Reactor Plant Protection System. The required solution must provide three-axis ground motion sensing, dry contact output, and adjustable trip setpoints to ensure critical reactor protection functions and long-term system reliability. Potential suppliers must demonstrate the ability to meet stringent nuclear safety standards, including environmental and seismic qualifications per IEEE 323, IEEE 344, IEEE 603, and ANSI/ISA-67.04.01, while maintaining a Quality Assurance Program consistent with ASME NQA-1. Mandatory capabilities include the provision of comprehensive qualification reports, certificates of conformance, and long-term obsolescence management. Interested organizations must submit a concise PDF response, limited to approximately 10 pages, detailing their technical capabilities, business size, and relevant experience to Chase Egbert and Stacey Hill by April 23, 2027.
Other Measuring and Controlling Device Manufacturing

POSTED

7 days ago

DEADLINE

in 5 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS