Hemet-Ryan Air Attack Base Replacement Project
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California Forestry and Fire Protection, Department of
Place of Performance
West Acacia Avenue and South Sanderson Avenue, Hemet, CA, 92545Set-Aside
NONE
Timeline
Organization & Contact Information
Show more
AgencyCalifornia Forestry and Fire Protection, Department of
Contacts3 people available
OfficeN/A
Organization / Agency
California Forestry and Fire Protection, Department of
Office AddressN/A
Contacts
Interested Companies (1)
LSA AssociatesIrvine, CA
Full Description
Show more
CAL FIRE is proposing to replace the existing HRAAB facilities and construct a new, modern HRAAB facility that would allow the base to continue to provide high-quality fire protection and emergency response services. The Project would result in improved fueling operations; improved flight capability and improved response time by updating aircraft and aircraft pads and ancillary features; and replacing administrative and support uses. The Project would be developed on approximately 15.25 acres in the south-central portion of the existing airport, portions of which are currently operating as a helitack base. The Project includes the following components:
A two-story air operations building with a control room
Landing pads and retardant loading pits.
A 32-bed barracks/mess hall to replace the existing modular units.
A combination helicopter/OV-10 hangar
Two aircraft storage canopies
A helicopter training tower with a hoist system for repelling training
A fire retardant mixing station
A vehicle storage building to protect and store firefighting equipment
A generator yard/electrical building
Site work would consist of the demolition of an existing RCSD helipad, barracks, pilots building, office, Quonset hut, tanks, gas shed, canopies, maintenance and storage buildings; the replacement of existing structures with new facilities; the relocation of the existing control tower; and the installation of sewer connections, fencing, paving, landscaping, associated utilities, appurtenances, and other
related site work. The facility lease would be extended to 50 years.
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS