Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

PD-24-21 Sacramento River Floodplain Enhancement Project

Awarded
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The PD-24-21 Sacramento River Floodplain Enhancement Project, identified by solicitation number RMP-2026-0050-R2, is a restoration initiative located on approximately 58 acres across two parcels in Colusa County, California. The project focuses on removing existing earthen berms and grading floodplain habitat to increase swale inundation frequency and establish positive drainage toward the Sacramento River. These efforts are designed to restore natural geomorphic and hydrologic processes, improve seasonal floodplain connectivity, and enhance juvenile salmonid rearing habitat while eliminating fish stranding hazards caused by artificial barriers. Managed by the California Department of Fish and Wildlife and the County of Colusa, the project is designated as a Qualifying Restoration Project under section 1671(d)(1) of the Fish and Game Code. The scope includes the restoration and enhancement of riparian habitat followed by ongoing monitoring and adaptive management of the land. A Notice of Determination issued on September 10, 2026, confirms that the project will not have a significant effect on the environment within the jurisdiction of the Department of Fish and Wildlife, provided that specific mitigation measures are implemented as conditions of approval.

General Info

Sacramento River floodplain restoration in Colusa County to enhance salmonid rearing habitat.

Agency

California → Colusa County

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Colusa County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Colusa County
Office AddressN/A
Contacts
Jordan RobbinsSenior Environmental Scientist
Jennifer RotnemSenior Restoration Science Ecologist / Project Manger
Steve GeigerPrincipal Planner

Full Description

Show more
Approval of Permit No. 20118, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To remove remnants of an existing orchard and plant 36 acres of native riparian habitat upon a 48-acre parcel located within the Sacramento River floodway. Activities include re-grading the existing drainage swale to improve connection with the Sacramento River and planting approximately 5,800 riparian plants with a temporary irrigation system.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 9 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 9 hours ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS