Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on January 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Herndon Street Landslide Remediation Project

Closed
2025-IFB-299State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
27-018 T6026-1 North River Gap Sidewalk Project
Solicitation # 27-018
The City of Sandy Springs is soliciting bids for the T6026-1 North River Gap Sidewalk Project, which involves the construction of approximately 300 linear feet of sidewalk on the east side of North River Drive, spanning from 100 North River Drive to 501 North River Parkway. The scope of work includes site preparation through the removal of granite, concrete, and vegetation, the supply and grading of clean fill and topsoil, the reconstruction of two driveways, and the installation of ADA-compliant ramps. All work must adhere to Georgia Department of Transportation (GDOT) Standard Specifications and the Manual of Uniform Traffic Control Devices (MUTCD), with materials sourced from GDOT certified suppliers. The project requires a 75-day performance period from the issuance of the Notice to Proceed, with work permitted on weekdays from 8:00 AM to 5:00 PM and traffic-interfering activities restricted to 9:00 AM to 4:00 PM. Bids for solicitation 27-018 must be submitted by January 7, 2027. Required documentation includes a bid schedule, price certification, drug-free workplace certification, and a Georgia Security and Immigration Compliance Act affidavit. A bid bond is mandatory if the bid price exceeds $100,000, and the successful contractor must provide performance and payment bonds, as well as a certificate of insurance. Key deliverables include before-and-after project videos, independent testing for concrete and sub-grade compaction, and a two-year warranty on sod installation. There is no specified set-aside status for this solicitation.
City of Sandy Springs

POSTED

about 9 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
International
EN27TFM021 South Peter FSR Extension - Arrow
Solicitation # EN27TFM021
The EN27TFM021 South Peter FSR Extension - Arrow is a Major Works Contract for forest road construction issued by the BC Timber Sales Branch of the Province of British Columbia. The scope of work involves mobilization and demobilization, site preparation including clearing and debris disposal, and roadway and drainage excavation such as embankments, ballasting, and excavation in solid rock. The project is located in British Columbia, Canada, and requires the contractor to commence work immediately upon execution of the agreement, with completion dates defined in the contract schedules. Award is based on identifying the lowest compliant bidder, with evaluation factors focusing on the bidder's technical experience, qualifications, and possession of necessary machinery and equipment. Key requirements include mandatory BC Forest Safety Council SAFE certification for all subcontractors and adherence to strict camp standards regarding health, sanitation, and water safety. The contract is administered by the Minister of Forests through the Kootenay Business Area, with payments typically processed between 30 to 60 days after invoice certification. Bidders must provide bid security, and the successful contractor is required to provide performance and labour and material payment bonds, as well as WorkSafe BC coverage.
BC Timber Sales Branch

POSTED

about 11 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Herndon Street Landslide Remediation Project addresses significant slope movement that has caused pavement damage and displacement of an adjacent private retaining wall. The remediation plan involves installing a drilled, cantilevered soldier pile and lagging wall designed to intercept the slide plane and provide durable lateral support to the roadway. The engineering approach includes controlled excavation, back-lagging to minimize disturbance, and Class 3 excavation, along with drainage measures at weepholes using geocomposite strip drains. Surface restoration efforts will ensure positive drainage flow to an existing Public Works Service Authority inlet, stabilizing the area while maintaining roadway functionality. Additional project components focus on community and environmental considerations, such as adding a parking lane along the newly stabilized shoulder, replacing guiderail, and restoring vegetation through native steep-slope seed mixes and reforestation of city-owned parcels downslope. Materials acceptance and quality control protocols incorporate contractor quality assurance, owner acceptance testing, and supplier or manufacturer certifications as outlined in Section 106. The solicitation, issued by Pennsylvania’s Mobility & Infrastructure agency, is managed by a project team based in Pittsburgh, with key contacts available for procurement inquiries.

General Info

Remediation of Herndon Street landslide with soldier pile wall, drainage, restoration, parking, and vegetation.

Place of Performance

PA, USA

Set-Aside

MBE, WBE, Veteran, LGBTQIA+

Documents

5
PDF, High priority: read this first50 pages · ifb
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this first29 pages · special-provisions
High
PDF, High priority: read this first16 pages · construction-drawings
High
PDF, High priority: read this first5 pages · wage-determination
High

Read all 5 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 7 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Mobility & Infrastructure
Contacts2 people available
OfficePittsburgh, PA, 15219, USA

Interested Companies (32)

12 BravoIRWIN, PA
A. Merante ContractingPittsburgh, PA
Advanced BuildersPerryopolis, PA

See All 32 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Herndon Street has experienced slope movement resulting in pavement distress and displacement of an adjacent private jumbo-block retaining wall. The selected remediation is a drilled, cantilevered soldier pile and lagging wall designed to intercept the slide plane and provide long-term lateral support to the roadway. The design incorporates controlled excavation and back-lagging to limit disturbance and Class 3 excavation, drainage provisions at weepholes with geocomposite strip drains, and surface restoration to re-establish positive roadway drainage to an existing PWSA inlet. The project also addresses community impacts by adding a parking lane along the stabilized shoulder, replacing guiderail, restoring vegetation with a native steep-slope seed mix, and reforesting City parcels downslope. Materials acceptance will follow Section 106 with contractor QC, owner acceptance testing, and supplier/manufacturer certifications as specified.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS