Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Energy was posted on July 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

High-Voltage Bushing Replacement and Testing

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract pertains to the removal and installation of high-voltage bushings on the KT2A transformer, requiring precise technical execution including dielectric testing, torque calibration, and sealing to ensure operational integrity and safety. All work must comply with industry standards for high-voltage equipment and involve qualified personnel capable of handling critical electrical infrastructure. The project demands strict adherence to procedural protocols for testing and calibration to validate performance and prevent future failures. This is a subcontract under the SBA set-aside classification, with a NAICS code of 335999 indicating it falls under Other Electrical Equipment and Component Manufacturing. The solicitation was posted on July 24, 2026, and responses are due by August 3, 2026, with the work to be performed under the Department of Energy’s Western Sierra Nevada Region. The contract does not specify a physical location for performance, but the context implies on-site execution at a federal energy facility. All contractors must be prepared to meet federal compliance requirements and deliver results that ensure the reliability of critical power transmission components.

General Info

Remove and install high-voltage bushings on KT2A transformer with certified testing and federal compliance.

NAICS

335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing

Place of Performance

Not specified

Set-Aside

SBA

Documents

This scope was carved out of 89503326QWA000410.

The full solicitation package (14 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Amd 3 Tracy Substation Transformer Refurbishment

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Western Sierra Nevada Region
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Removal and installation of high-voltage bushings on the KT2A transformer, including dielectric testing, torque calibration, and sealing.

More opportunities from Department Of Energy → Western Sierra Nevada Region

Same awarding agency

NAICS: 237130
Federal
COTP Series Capacitor Two-Phase Design Build
Solicitation # 89503326RWA000049
The California Oregon Transmission Project (COTP) Series Capacitor Bank Replacement is a firm-fixed-price, two-phase design-build construction project issued by the U.S. Department of Energy, Western Area Power Administration (WAPA). With an estimated magnitude exceeding $80 million, the project involves the engineering, procurement, and construction of four 525kV series capacitor banks at the Maxwell, Tracy, Olinda South, and Olinda North substations. The scope includes the installation of capacitor banks, live tank circuit breakers, disconnect switches, MOVs, and associated control systems, as well as the demolition and construction of foundations and platforms. The project is scheduled for completion by June 30, 2033, with a proposal deadline extended to November 13, 2026. The procurement follows a best-value source selection process divided into two phases. Phase I focuses on qualifications, evaluating corporate experience, technical competency, and past performance to shortlist up to five offerors. Phase II involves a detailed technical and price proposal, where factors such as organization, key personnel, technical solution, and price are assessed. Key contract requirements include strict adherence to Buy American standards, cybersecurity approvals for network-interfacing equipment, and compliance with prevailing wage determinations for Colusa, Shasta, and Alameda counties. Financial terms include progress payments for mobilization and preparatory work, while liquidated damages are established for delays in returning capacitor banks to service. Security protocols require comprehensive background checks for all personnel and specific data cards for foreign nationals.
Power and Communication Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS