Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

High-Voltage Pulse Power Thyratron Tube Manufacturing

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves the design, engineering, and manufacturing of 70 hydrogen gas thyratron switching tubes, each rated to handle high voltages of 50kV, currents of 6kA, and operation at 180Hz. These specialized tubes are intended for use in the Linac Coherent Light Source (LCLS) particle accelerator, a facility requiring precise and reliable high-voltage pulse power components. The work falls under the industrial classification related to electronic component manufacturing (NAICS code 334510) and is being handled as a subcontract by the SLAC National Accelerator Laboratory, which operates under the Department of Energy. The contract was posted on June 1, 2026, with a response deadline of June 20, 2026, indicating a competitive and time-sensitive procurement process. The place of performance is within the zip code 94025, suggesting the work or delivery is associated with the SLAC facility's location. There is no specific set-aside designation, and further details such as point of contact and exact organizational type were not provided, though the contracting agency is clearly the Department of Energy through its contractor SLAC National Accelerator Laboratory.

General Info

Design and manufacture 70 hydrogen thyratron tubes for LCLS accelerator, high voltage, DOE subcontract.

Agency

Department Of Energy → Slac National Accel Labor -Doe Contractor

NAICS

334510 - Electromedical and Electrotherapeutic Apparatus Manufacturing View NAICS

Place of Performance

CA, 94025, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Slac National Accel Labor -Doe Contractor
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Energy → Slac National Accel Labor -Doe Contractor
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design, engineering, and manufacturing of 70 hydrogen gas thyratron switching tubes rated at 50kV, 6kA, and 180Hz for use in the Linac Coherent Light Source (LCLS) particle accelerator.

Similar Contracts