Hilton San Diego Bayfront Hotel Renovation
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → San Diego Unified Port District
NAICS
236220 - Commercial and Institutional Building ConstructionView NAICS
Place of Performance
San Diego, CASet-Aside
NONE
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Full Description
Show more
The proposed project would involve renovations at the Hilton San Diego Bayfront Hotel by One Park Boulevard, LLC, in the city of San Diego, California. The proposed project would involve interior and exterior renovations of an existing hotel facility. Interior renovations would consist of improvements to existing guest rooms, common areas such as lobbies, meeting spaces, ballrooms, restroom facilities, and the bar and club lounge. Exterior renovations would consist of improvements to the pool area, porte-cochere, outdoor bar and the refreshment of existing landscape areas. Work to specifically complete the proposed project is outlined below:
Guestrooms
Proposed guestroom improvements would include interior renovations to approximately 1190 existing guestrooms, including replacement or improvement of:
Furnishing, fixtures, and equipment;
Showers;
Doors;
Lighting;
Furnishings, fixtures, and finishes; and
Associated mechanical, electrical, and plumbing work.
All interior improvements and renovations would remain within the footprint of the existing hotel rooms and would not result in the addition of guest rooms.
Common Areas
Proposed improvements to common areas including but not limited to:
Corridors;
Meeting Spaces;
Lobbies;
Ballrooms; and
Public Restrooms.
Proposed improvements would include replacement or improvement of:
Lighting;
Flooring;
Wall finishing; and
Associated mechanical, electrical, and plumbing work.
All interior improvements and renovations would remain within the footprint of the existing common areas and would not result in the addition of capacity.
Registration Area and Lobby and Corridor
Proposed improvements to the registration area, lobby and corridor would include:
Lighting;
Flooring; and
Furniture, fixtures and finishes.
All interior improvements and renovations would remain within the footprint of the existing area and would not result in the addition of capacity of the space.
Bar Lounge
Proposed improvements to the bar would include replacement or improvement of:
Lighting;
Furniture, fixtures and finishes; and
Associated mechanical, electrical, and plumbing improvements.
Other renovations would include:
Installation of new Nano-Wall style doors leading to the outdoor patio space.
All interior improvements and renovations would remain within the footprint of the existing bar and would not result in the addition of capacity of the bar space.
Club Lounge
Proposed improvements to the club lounge would include replacement or improvement of:
Lighting;
Flooring;
Furnishings, fixtures, and finishes; and
Associated mechanical, electrical, and plumbing improvements.
All interior improvements and renovations would remain within the footprint of the existing club lounge and would not result in the addition of capacity of the club lounge space.
Hotel Entry and Porte-Cochere
Proposed improvements to the hotel entry and the porte-cochere would include:
Lighting, and
Furnishings, fixtures, and finishes.
Additionally, adjacent to the Porte-Cochere, outdoor seating would be installed to enhance the existing arrival space. Improvements would not result in the addition of capacity to the hotel facility.
Pool Area/Deck
Proposed improvements to the pool and lawn areas, which are located on the southwest side of the hotel, would consist of the following:
Furniture, fixtures, and equipment;
Refreshment of existing landscaping;
Remodel of existing kids play area;
Replacement of cabana structures;
Replacement of light fixtures;
Infill of one (1) existing spa;
Landscape improvements;
Associated mechanical, electrical, and plumbing improvements; and
Demolition and relocation of existing bar area of substantially the same size, and associated finishes.
The proposed scope of the pool and event lawn area improvements would not involve the expansion of the existing spaces or event capacity and would be limited to the existing footprint.
The proposed renovations are anticipated to begin in Winter 2025 and would be carried out in two (2) phases over the course of approximately two (2) years. The first phase would consist of the proposed renovations and improvements to the pool and event lawn areas, as well as the initial work on the meeting space areas and guestrooms, which are anticipated to take approximately two (2) months. The second phase would consist of the remaining meeting space areas and guestrooms and other proposed interior and hotel entry renovations. The laydown area for the first and second phase of work would utilize approximately 40 parking spaces within the leasehold, which are not currently used for guest parking and are not anticipated to impact the availability of public parking. Renovation work would not restrict public access at the site at any time. Construction crews would utilize nearby ACE lots for parking and incorporate carpooling to reduce vehicle trips.
Due to its nature and limited scope, construction of the proposed project would generate a minor number of vehicle trips and would require limited use of equipment. Exterior and interior improvements associated with the first phase of work are anticipated to require minimal use of a bobcat, dump truck, scissor lifts jackhammers associated with the removal of debris and transportation of materials, and no other large or special equipment. Minimal truck trips associated with the removal of debris and transportation of materials are anticipated to be generated for this phase of work. Interior improvements associated with the second phase of work are anticipated to require use of scissor lifts and no other large or special equipment. The April 2018 Technical Advisory on Evaluating Transportation Impacts in CEQA (Advisory) prepared by the former State of California Governors Office of Planning and Research , outlines how utilizing Vehicle Miles Travelled to evaluate transportation impacts under CEQA helps implement Senate Bill 32, a greenhouse gas (GHG) emissions reduction bill. The advisory asserts that projects that generate or attract fewer than 110 trips per day generally may be assumed to cause a less-than-significant transportation impact. As the project is anticipated to generate a maximum use of 40 vehicles or 80 vehicle trips per day, or approximately 1 truck trip per week, it is not anticipated to cause a significant transportation impact. Lastly, the proposed project would not result in a change in size, capacity, or operations of the hotel facility from that which is currently existing. Therefore, the Project would not result in impacts related to air quality, greenhouse gas emissions, transportation and traffic.
Furthermore, the Applicant would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.
Similar Contracts
Same NAICS industry code
