Hinojosa Rip Rap Repair Project (Project)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Hinojosa Rip Rap Repair Project, managed by the Regional Water Quality Control Board Region 5 in California, focuses on bank stabilization to prevent seasonal erosion. The scope of work involves restacking and re-keying existing onsite rip rap boulders located below the high water mark. Logistical operations, including equipment staging and the path of travel, will take place on the property of Tomas and Renee Hinojosa. The contractor is required to repair any disturbances to the path of travel to ensure it is returned to its original condition. Project coordination is handled by Senior Environmental Scientist Lynn Coster and Project Manager Christy Morgan.

General Info

Bank stabilization project involving rip rap repair on Hinojosa property by Region 5.

Agency

California → Regional Water Quality Control Board, Region 5 - Redding

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

5A32CR00266 Hinojosa Rip Rap Repair Project

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 5 - Redding
Contacts3 people available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 5 - Redding
Office AddressN/A
Contacts
Lynn CosterSenior Environmental Scientist
Tomas and Renee HinojosaProperty Owner
Christy MorganProject Manager

Full Description

Show more
The proposed project will consist of bank stabilization using existing onsite rip rap boulders already below the high water mark to prevent seasonal erosion. The rip rap will be restacked and re-keyed. Equipment staging and the path of travel will be on the homeowner’s property. If disturbed, the path of travel will be repaired to original condition.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The project is located in Haleiwa, Oahu, Hawaii, and is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. The estimated contract value ranges from 1,000,000 to 5,000,000 dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The contract requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. Bidders must provide a bid guarantee and subsequent performance and payment bonds. Liquidated damages for construction delays are set at 2,297 dollars per calendar day. Quality control is managed through a three-phase inspection process, and final acceptance is contingent upon a certificate from the QC Manager attesting that all work complies with the contract specifications. Payment is handled via monthly invoices, and the contract is subject to Davis-Bacon Act prevailing wage requirements.
Healy Tibbitts Builders, Inc.

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, with an estimated bid value of 19,300,000.00 dollars. The project scope involves the design and removal of existing trailer-mounted electrodialysis reversal, slab-mounted membrane filtration, and reverse osmosis units at the South Bay Water Reclamation Plant. These will be replaced with new slab-mounted membrane filtration and reverse osmosis units to create a demineralization facility aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, has a submission deadline of August 27, 2026. Garney Pacific is actively seeking quotes from subcontractors for various trades, including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The project emphasizes the participation of SLBE, ELBE, DBE, MBE, WBE, and SBE certified firms and requires the use of union labor. Subcontractors must be prepared to provide a 100 percent payment and performance bond from a US Treasury listed surety company, though Garney will reimburse the bond premium. Contracting will be based on Garney Standard Purchase Order and Subcontract forms, and the company offers assistance to SLBE and ELBE firms in securing bonding lines of credit or insurance.
Garney Pacific, Inc.

POSTED

about 11 hours ago

DEADLINE

in 1 day
View Details