Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Proposed Drainage improvements and Restoration Activities at the Rancho Mission Viejo Riding Park

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 2026 East End Horse Stable Project, located at the Rancho Mission Viejo Riding Park in San Juan Capistrano, California, is managed by Premier Equisport Events, LLC under a ground lease with the City. The project consists of the construction of eight standard row-stall horse barns, each approximately 9 feet in height with 10-foot by 12-foot stalls, providing a total capacity of approximately 315 stalls. To support this infrastructure, the project includes the installation of berms and a dedicated stormwater capture and infiltration basin designed to manage stormwater independently from the existing Concentrated Animal Feeding Operation water quality infrastructure. The project was approved by the San Juan Capistrano City Council on August 18, 2026, following an environmental evaluation under CEQA via an Addendum to the 2020 Mitigated Negative Declaration. This evaluation concluded that the project would not result in new significant environmental impacts, and it remains subject to the existing Mitigation Monitoring and Reporting Program. Additionally, the project has received necessary authorization from the San Diego Regional Water Quality Control Board under the Industrial General Permit framework.

General Info

Premier Equisport Events will build eight horse barns and stormwater systems in San Juan Capistrano.

Agency

California → City of San Juan Capistrano

Place of Performance

San Juan Capistrano, CA, 92675

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Juan Capistrano
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of San Juan Capistrano
Office AddressN/A
Contacts
Matisse ReischlAssistant City Manager

Full Description

Show more
Full Title: 2026 East End Horse Stable Project, Addendum to the Previously Adopted Final Initial Study (IS) and Mitigated Negative Declaration (MND) for the Proposed Drainage Improvements and Restoration Activities at the Rancho Mission Viejo Riding Park at San Juan Capistrano Premier Equisport Events, LLC (Premier) operates the City-owned Riding Park property at the Rancho Mission Viejo Riding Park, San Juan Capistrano, pursuant to a Ground Lease approved by the City Council in July 2025. Premier is responsible for operating and maintaining the property's existing water quality infrastructure, known as the Concentrated Animal Feeding Operation (CAFO) Water Quality Improvements. Premier proposes the 2026 East End Horse Stable Project, which includes: (1) eight standard-size row-stall horse barns similar to, or the same as, the existing horse barns on-site, which would be approximately 9 feet in height and would include 10-foot by 12-foot stalls arranged side-by-side in two rows, accommodating up to approximately 315 stalls total; and (2) berms and a dedicated stormwater capture and infiltration basin intended to isolate and manage stormwater generated by the new horse stables. The proposed system would operate independently from the existing CAFO water quality infrastructure. The proposed project was evaluated under CEQA through an Addendum to the previously adopted 2020 Mitigated Negative Declaration. The Addendum concludes that the project would not result in new significant environmental impacts or substantially increase the severity of impacts previously identified. The existing Mitigation Monitoring and Reporting Program remains applicable, and no additional mitigation measures are required. Premier has also received the necessary authorization from the San Diego Regional Water Quality Control Board under the applicable Industrial General Permit framework. On August 18, 2026 the City Council of the City of San Juan Capistrano, after considering the Addendum and the IS/MND, adopted the Addendum, found the 2026 East End Horse Stable Project “functionally equivalent” to the previous Drainage Improvements and Restoration Activities, and approved the Revised Project.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 12 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 12 hours ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS