Modular K-Rail System
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Santa Barbara is forecasting the temporary installation of a modular K-Rail system located between Firestone Road and Firestone Ditch in Santa Barbara, California. This project is a critical preventative measure designed to address inadequate floodwater conveyance that resulted in two airfield closures during 2025 and 2026. By implementing this temporary barrier, the airport aims to prevent creek overtopping and protect the facility as a vital community transportation hub during the predicted severe 2026/27 rainy season. The project is managed by the City of Santa Barbara with Jessica Metzger serving as the primary point of contact. This forecast identifies the need for infrastructure to mitigate flooding risks at the airport site within the 93117 zip code.
General Info
Agency
NAICS
Place of Performance
Firestone Avenue and Hollister Avenue, Santa Barbara, CA, 93117Set-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
