Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

HM2 RIV 15; EA 08-1P911/PN 0825000074

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 8 is seeking to rehabilitate a 440-foot long, 72-inch corrugated steel pipe culvert located at Postmile 29.6 on Interstate 15 near Temescal Valley in Riverside County. The project, identified as EA 08-1P911/PN 0825000074, utilizes concrete invert paving as the primary rehabilitation method to perform preventive maintenance and extend the service life of the drainage system. The estimated construction duration is 50 working days, with the project being funded exclusively through state-only funding. The scope of work includes installing a temporary gravel bag berm, removing sediment from the final 50 feet of the culvert, and performing minor clearing and grubbing for fire prevention during welding operations. Construction will be managed from the De Palma Road inlet using a Traffic Control System with Reversible Control, while shoulder closures on I-15 will be implemented for culvert marker replacement and the installation of temporary drainage inlet protection. The project requires a temporary encroachment permit from the County of Riverside and adherence to a Traffic Management Plan, including the Construction Zone Enhanced Enforcement Program. Environmental compliance is a critical component of the contract, requiring adherence to CEQA and NEPA standards. The contractor must provide a qualified biologist to conduct preconstruction surveys for special-status plants, perform weekly monitoring of project activities, and implement a Worker Environmental Awareness Program. Additionally, the contractor must utilize Environmentally Sensitive Area temporary fencing to protect rare plants and ensure artificial lighting is directed only at the job site to minimize habitat spillover.

General Info

Caltrans to rehabilitate 440-foot culvert on I-15 with concrete invert paving using state funds, minimal shoulder closures, and no access roads.

Agency

California → Caltrans, District 8 - San Bernardino/Riverside

Place of Performance

De Palma Rd and Glen Eden Rd, CA, 92883

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 8 - San Bernardino/Riverside
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 8 - San Bernardino/Riverside
Office AddressN/A
Contacts
Jazlyn T GonzalezEnvironmental Scientist
Kourtney GravesBranch Chief, Environmental Studies C

Full Description

Show more
Caltrans proposes to rehabilitate an existing 72-inch Corrugated Steel Pipe (CSP) culvert at Postmile (PM) 29.6 on Interstate 15 (I-15), near Temescal Valley in Riverside County. The proposed rehabilitation method is concrete invert paving. Construction activities will primarily be performed from the inlet located on De Palma Road, where a Traffic Control System with Reversible Control will be implemented. No temporary access roads are required. All equipment and vehicles will be parked on the shoulder. Vehicles and equipment will not be traveling to and from the culvert work area. This project is funded by State-only funding. The purpose of this project is to perform preventive maintenance on the existing culvert to preserve the drainage system and extend its service life. The need of this project is to delay or prevent further deterioration of the culvert and to postpone the need for more extensive rehabilitation or replacement in the future. Limited work will occur in the channel near the outlet to implement best management practices (BMPs), including installing a temporary gravel bag berm and removing sediment from the last 50 feet inside the culvert. Additional limited work will occur in the channel near the inlet to establish a ~6-foot-wide walkway for the construction crew to access the work site. To establish this walkway, plants and bushes will be cut while leaving the roots in the soil. Minor clearing and grubbing will also occur in front of the inlet and outlet for fire prevention related to welding operations. On I-15 Northbound and Southbound, shoulder closures will be implemented to replace the culvert markers and install Temporary Drainage Inlet Protection. Traffic Management Plan (TMP) Elements include “Traffic Management Plan-Public Information” and “Construction Zone Enhanced Enforcement Program (COZEEP)”. Per Right-of-Way Engineering, there are impacted areas on this culvert project along De Palma Road that were purchased by the State and subsequently relinquished to the County of Riverside. As a result, a request for an encroachment permit will be submitted to the County of Riverside. The Encroachment Permit will be temporary and valid only during the construction period. The estimated construction duration is 50 working days, and the total culvert length is approximately 440 feet.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; extensive pipeline and utility work involving tunneling, boring, jacking, and the installation of steel casing and cathodic protection; and surface improvements including asphalt paving, lighting, and landscaping. Additionally, the project requires environmental and support services such as storm water pollution prevention, quality control, and waste management, as well as the supply of ready mix, precast concrete, and manhole materials. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. All quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

14 minutes ago

DEADLINE

in 10 days
View Details
NAICS: 237310
New
SLED
STP-011-2(046) VOLCANO RD REHAB, OSHIRO RD TO ALII KOA ST
Solicitation # B27000729
The Hawaii Department of Transportation is soliciting bids for the Volcano Road Rehabilitation project, spanning from Oshiro Road to Alii Koa Street in Lanai, Hawaii. The scope of work focuses on comprehensive roadway reconstruction and maintenance, including cold planing, resurfacing, the reconstruction of weakened pavement areas, pavement marking and striping, guardrail improvements, and the installation of milled rumble strips. Key deliverables include the leveling of roadway dips using A.C. Mix No. V and the deployment of Type II OM warning signs. The project mandates strict adherence to environmental mitigation, including NPDES Permit requirements for water pollution and erosion control, and requires that all lanes remain open during morning peak hours from 6:00 a.m. to 8:00 a.m. Contractual compliance requires the submission of performance and labor and material payment bonds, as well as certifications for Workers' Compensation and Temporary Disability Insurance. The project is subject to the Davis-Bacon and Related Act and the Contract Work Hours and Safety Standards Act. Technical acceptance is based on the Mean Roughness Index for pavement smoothness, with specific HMA tolerances for asphalt content and mixture temperature. Specialty items for the project include hot mix asphalt pavement, guardrails, and work zone traffic control. Bidders must submit their proposals via the HIePRO portal, with a virtual pre-bid conference scheduled for November 16, 2026.
Department of Transportation

POSTED

about 16 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237310
New
SLED
Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements
Solicitation # 2095-SCP
The City of Rock Hill is soliciting competitive bids for the Downtown Traffic Management Project, which is divided into two primary scopes: Component 1, focusing on the Intelligent Transportation System (ITS), and Component 2, involving Wilson Street Improvements. The ITS component requires the installation of Dynamic Message Signs, Blank-Out Signs, CCTV, and fiber optic infrastructure, including a specific 90-day window for conduit installation following the Notice to Proceed. The Wilson Street Improvements involve widening the roadway from two to three lanes with the addition of bike lanes, milling, resurfacing, and ADA ramp installations. The project has a substantial completion timeline of 730 calendar days. Bidders must be SCDOT prequalified and submit their proposals electronically via the OpenGov eProcurement Portal by November 18, 2026, at 2:00 p.m. Required submission materials include a 5% bid guaranty, proof of prequalification, AIA document A305, and signed certifications regarding lobbying and debarment. The contract will be awarded to the responsible and responsive bidder offering the lowest Total Base Bid. Awardees must adhere to the Davis-Bacon Act, the Build America, Buy America Act, and NIST cybersecurity frameworks for any access to SCDOT electronic data. Payment terms include a 30-day processing window with a 10% retainage withheld until project completion.
Project Management

POSTED

about 17 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237310
New
SLED
Bridge Front Upgrade Project (Re-Bid)
Solicitation # ITB27-6310-01B
The City of Lauderdale Lakes is soliciting bids for the Bridge Front Upgrade Project (ITB27-6310-01B) through its Public Works Administration. The scope of work involves the installation of decorative walls and pavers, swale regrading, minor drainage modifications, curb and pavement restoration, and signing and marking. All work must adhere to applicable building codes, City standards for dust nuisance abatement, and ADA guidelines for detectable warnings. Bids must be submitted via the City's eProcurement portal by December 9, 2026, at 3:00 PM. Qualified firms must demonstrate a track record of completing at least two similar projects in Florida and provide necessary licensing, certificates of competency, and a federal tax ID. Required submission documents include a bid bond, certificates and affidavits for bonds, and forms for subcontractors and principal materials manufacturers. The City evaluates respondents based on the licensing of supervising personnel, owned equipment, and confirmation of a drug-free workplace. The contract includes strict compliance requirements, including the Florida Trench Safety Act, E-Verify for employment eligibility, and certifications regarding scrutinized companies and foreign concerns. The successful contractor must provide performance and payment bonds in accordance with Florida Statutes and maintain all required insurance, submitting renewals 30 days prior to expiration. Payments are processed through the City's Accounts Payable Department within 30 days of invoice receipt, with a 15-day window for the City to notify the contractor of any disputed amounts.
Public Works Administration

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS