Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

HM4-TMS D1 South 25/26 (01-0P800)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 1 is undertaking a state-funded project in Lake and Mendocino Counties to replace aging and obsolete Traffic Management System (TMS) assets within the existing State right-of-way. The work includes upgrading Closed-Circuit Television (CCTV) units, traffic signal heads, communication hardware, interconnecting wiring, equipment cabinets, internal controllers, and defective components within Changeable Message Sign (CMS) boards. Additional tasks involve replacing traffic count devices and inductive loop detectors to ensure continued operational reliability of the statewide transportation monitoring network. All activities are confined to paved surfaces and existing non-vegetated turnouts, with no tree removal or vegetation disturbance beyond pavement limits, consistent with a Class 1 environmental exemption under California Code of Regulations Title 14 Section 15304. The project aims to modernize critical infrastructure nearing end-of-life, enhancing system performance and safety without expanding the physical footprint of operations. The project, identified as HM4-TMS D1 South 25/26 (01-0P800), is forecasted for performance at specific postmiles on Routes 101, 20, 222 in Mendocino County and Route 53 in Lake County. No contract value, pricing details, or line-item costs are provided, indicating this is a preliminary notice rather than a fully executed contract. The solicitation was posted on July 29, 2025, with Coady Reynolds serving as the primary contact, though formal roles for Contracting Officer’s Representative, Procurement Contracting Officer, or Technical Representative are not designated. There are no identified FAR clauses, special requirements, evaluation factors, packaging specifications, or submission instructions in the available documentation, suggesting that full contract terms and conditions have not yet been released. Payment details, invoicing procedures, accounting data, and delivery terms are also unspecified, with the absence of UEI, CAGE codes, or socioeconomic certifications indicating that offeror information has not been collected. The project remains in a pre-solicitation planning phase with performance locations defined but without a finalized period of performance or award mechanism.

General Info

Caltrans upgrades TMS assets on Routes 101, 20, 222, 53 without vegetation disturbance or expanded footprint.

Agency

California → Caltrans, District 1 - Eureka

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for HM4-TMS D1 South 25/26 Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 1 - Eureka
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 1 - Eureka
Office AddressN/A
Contacts
Coady ReynoldsSr. Environmental Scientist

Full Description

Show more
Caltrans is developing a State-Funded project in Lake and Mendocino Counties at Various Locations. Work will consist of replacing obsolete Closed-Circuit Television (CCTV) units and associated communication equipment, traffic signal heads, interconnecting wiring, and ancillary cabinet components. The project includes replacing obsolete equipment cabinets, internal controllers, and replacing defective electronic components and switches within existing Changeable Message Sign (CMS) boards. In addition, there will be replacement of traffic count devices, inductive loop detectors, and communication hardware. All work will be within the existing State right of way. Equipment staging will be confined to existing paved surfaces and existing non-vegetated turnouts, if applicable. There will be no tree removal. Except for construction area signs, no soil or vegetation disturbance will occur outside the pavement limits. The purpose of this project is to address technology lifecycle of the core Traffic Management Systems (TMS) assets. Supporting the systematic overhaul of aging resources by replacing assets which are at the end of their lifecycle, using obsolete technology, or are in poor condition. This project will install census equipment upgrades, CCTV replacement, and CMS repairs.

Similar Contracts

Same NAICS industry code