Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on September 27, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

HMRT A/C Repair and Removal

Awarded
Federal
Submission Closed
Solicitation #
HSCG26-16-Q-XE1090

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Federal
Fire Extinguisher Replacement & Exchange Services
Solicitation # fire-extinguisher-replacement-exchange-services
The Earle C. Clements Job Corps Center is soliciting bids for fire extinguisher replacement and exchange services in Morganfield, Kentucky. The scope of work involves the exchange of approximately 260 existing units, including 231 10 lb. ABC, 8 K-Class, 12 5 lb. ABC, 4 5 lb. CO2, 1 5 lb. Halotron, and 4 20 lb. ABC extinguishers. Additionally, the contractor must supply one new 6-liter Wet K-Class and one new 20 lb. ABC extinguisher. Per Addendum #1, the requirement for forty-seven 2.5 lb. 5BC DOT-compliant extinguishers has been removed from the procurement. All work must be performed Monday through Friday, 8 AM to 5 PM CST, in compliance with NFPA 10 and DOT standards, and must include a complete inventory list, tagging for each unit, and a written summary report. This is a fixed-price solicitation set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Bids and required documentation, including a bid sheet, supplier packet, and proof of worker's compensation insurance, are due by December 4, 2026. The contract is subject to Service Contract Labor Standards under Wage Determination 2015-4687 Revision 31. Management & Training Corporation (MTC) will serve as the sole judge to determine the best value for the award.
Earle C. Clements Job Corps Center

POSTED

14 minutes ago

DEADLINE

in 5 days
NAICS: 811310
New
International
Lift Servicing and Maintenance Services (North)
Solicitation # ocds-h6vhtk-07c418
Southern Housing is procuring a single contractor to provide comprehensive lift servicing and maintenance for its housing stock in the North region, covering London, Berkshire, Buckinghamshire, and Oxfordshire. The scope includes planned and preventative maintenance, responsive call-outs, emergency repairs, and defect correction for all communal and domestic lifts, as well as associated electrical and builder works. The contractor will also be responsible for discharging Principal Contractor duties under CDM and Building Safety Regulations when applicable, though lift modernization and replacement are excluded from the scope. The contract utilizes the JCT MTC 2024 Form of Contract with Amendments and is estimated to be valued at 11,660,000 GBP excluding VAT. The agreement is set for an initial three-year term starting March 15, 2027, with options to extend for up to seven additional years, allowing for a maximum term of ten years. Award decisions will be based on an open procedure using a weighted scoring system, with 40% allocated to price and 60% to quality factors such as resourcing, performance, and health and safety. Key objectives include improving resident satisfaction through technology, ensuring robust subcontractor management, and delivering social value outcomes. There is no specific set-aside status for this contract.
Southern Housing

POSTED

2 days ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The United States Coast Guard Gulf Strike Team requires a licensed HVAC contractor to remove and replace four rooftop-mounted air conditioning condensers and four internally mounted evaporators on one Hazardous Materials Response Trailer. The project involves the removal of R-22 refrigerant and the installation of HDT/Nordic Air Model 2KR28 units or an approved equivalent using R-407C refrigerant to ensure compliance with State and Federal EPA regulations. The contractor is responsible for all parts, labor, tooling, and surface preparation, with the work estimated to take three business days. Performance may occur on-site at the USCG Gulf Strike Team in Mobile, Alabama, or at the contractor's facility if within a reasonable distance. The contractor must adhere to all OSHA industrial safety practices and maintain comprehensive insurance coverage, including Worker's Compensation, General Liability, Automobile Liability, and Pollution Legal Liability. Strict adherence to environmental laws and the USCG tobacco policy is required for on-site work. The government will provide electricity and lifting capabilities if the work is performed on-site. Final acceptance is contingent upon a government inspection to ensure proper operation of the cooling and heating systems. This solicitation is evaluated based on the Lowest Price Technically Acceptable process and must comply with prevailing wage rates for Mobile County, Alabama.

General Info

Contract Value

$31,780

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

US Coast Guard Gulf Strike Team Aviation Training Center Mobile 8501 Tanner Williams Road, MOBILE, AL, 36695, USA

Set-Aside

NONE

Award Issued Date

Potential End Date

September 30, 2016

Documents

3
DOCX, High priority: read this first7 pages · rfp
High
DOC, High priority: read this first5 pages · sow
High
PDF, High priority: read this firstwage-determination
High

Read all 3 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Fire Extinguisher Replacement & Exchange ServicesOpen now, due in 6 days
  • Pump Maintenance and ServiceOpen now, due in 15 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → National Strike Force Command CTR(0
Contacts2 people available
OfficeELIZABETH CITY, NC, 27909, USA

Full Description

Show more
STATEMENT OF WORK UNITED STATES COAST GUARD HAZARDOUS MATERIALS RESPONSE TRAILER AIR CONDITIONING UNITS REMOVAL AND REPLACEMENT 1.0 Purpose. The United States Coast Guard (USCG), Gulf Strike Team has a requirement for the removal and replacement of four (4) roof top mounted air conditioning units for one (1) each Hazardous Materials Response Trailer (HMRT). 2.0 Scope. 2.1 This Statement of Work (SOW) defines the removal and replacement of the air conditioning unit on one (1) HMRT, which consists of four (4) roof top mounted Condensers and the four (4) internally mounted Evaporators, to include the removal, preparation of the existing surfaces (inside and out) on the HMRT for installation, installation of the new units, and testing to insure proper operation of cooling and heating systems. 2.2 The existing air conditioning unit to be removed and replaced is Model Number 2KC30ABA, Voltage 208-230/1/60, F. L. AMPS C.13.4H, manufactured by Nordic Air, Inc. There will be a requirement to remove the existing R-22 refrigerant. The disposal of the R-22 must be in compliance with all State and Federal Environmental Protection Agency (EPA) Regulations. 2.3 The desired replacement unit is the HDT/Nordic Air Model #2KR28 heavy duty, self-contained air conditioning unit or an approved equivalent. The new unit must contain the R-407C refrigerant to be in compliance with all State and Federal EPA Regulations. 2.4 The contractor shall comply with all Occupational Safety and Health Administration (OSHA) Industrial Safety Practices concerning the removal and replacement of these air conditioning units. 2.5 The contractor shall be a licensed Heating, Venting and Cooling (HVAC) contractor and shall provide all parts, materials, labor, tooling, supervision, and containment equipment required, with the exception of Government Furnished Materials (GFM) detailed in section 4.0 of this SOW. 2.6 The HMRT is a mobile unit. The work to be performed will either be accomplished on-site at the USCG Gulf Strike Team or at the contractor's facility, if located with a reasonable distance. The reasonable distance will be determined by the Contracting Officer and/or the Government Point of Contac (POC) taking into account mileage, travel expenses, etc. 3.0 Major Tasks. 3.1 Removal and replacement of the old units. Removal and replacement of the four (4) Condensers and the four (4) Evaporators will be conducted either at the contractor's facility or on location at the USCG Gulf Strike Team, as approved by the Contracting Officer and/or Government POC. 3.2 Once the units have been removed and disposed of properly, the contractor is required to clean and prepare the existing surfaces of the HMRT (inside and outside), prior to installation of the new unit. 3.3 Installation of the new units. Contractor shall install the new units ensuring that the units have been correctly installed and wired. 4.0 Government Furnished Material (GFM). If the work is to be performed on-site at the USCG Gulf Strike Team location, the Government will provide 1) Electricity (if needed) and 2) Any necessary lifting capabilities to gain access to the HMRT. Any other items will require prior approval by the Contracting Officer or Government POC prior to commencement of work. 5.0 Quality Assurance. The USCG reserves the right to review the contractor's work anytime during the performance of this contract. The Government POC will complete a final inspection and acceptance of all work performed. 6.0 Tobacco Policy. 6.1 If the work to be performed on-site, the USCG prohibits the use of smoking tobacco and smokeless tobacco in the workplace in order to protect the health of all it workers. The workplace includes any area inside a building or facility over which the USCG has custody and control where work is performed by active duty personnel, civilian employees, or personnel under contract to the USCG. 6.2 Contractors may only use tobacco products in designated smoking areas and are accountable for appropriately discarding their smoking material and/or spit tobacco. Tobacco spit and residue shall be held in containers with sealing lids to prevent odor and accidental spills and disposed of in a sanitary manner which prevents public exposure. Contractor employees found abusing the Tobacco Policy shall be subject to removal. 7.0 Period of Performance. It is estimated that the work being performed will take three (3) business days to complete whether on-site or at the contractor's facilities. For the work being performed on-site, work period shall be from 7:00 a.m. to 4:00 p.m. EST, Monday through Friday. Work to be performed outside these hours must be requested in advance and approved by the Contracting Officer prior to commencement of work. All work will take place in designated work areas. 8.0 Mishap/Incident Notification/Reporting. 8.1 For work being performed on-site, the contractor shall comply with all applicable Federal, State, and Local Safety Laws. Emergency services are available by dialing 911 from a facility phone or cellular phone. The contractor shall notify the Government POC or the Safety and Environmental Health Office (SEHO) within one (1) hour of all mishaps or incidents. This will include all exposure data and all accidents resulting in death, traumatic injury, or occupational disease, damage to property, materials, supplies, and equipment incidental to work performed under this contract. Note: It is the sole responsibility of the contractor to report recordable injuries of its employees to OSHA. 8.2 A written report of the safety mishap/incident shall be sent within three (3) calendar days to the Government POC, who shall forward it to the Safety Office. For information not available at the time of initial written report, the contractor shall provide the remaining information no later than twenty (20) calendar days after the mishap, unless an extension is granted by the SEHO. Mishap notifications shall contain, at a minimum, the following information: - Contract, Contract Number, Name and Title of Person(s) reporting. - Date, Time and Exact Location of accident/incident. - Brief narrative of accident/incident (Events leading to accident/incident). - Cause of accident/incident, if known. - Nomenclature of equipment and personnel involved in accident/incident. - Estimated cost of accident/incident (material and labor to removal/replace corrective actions (taken or proposed). - Other pertinent information. 8.3 If requested by the Government POC, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the SEHO. 9.0 Environmental and Spills/Releases. 9.1 The contractor shall comply with all applicable Federal, State and Local Environmental Laws. If the contractor spills or releases any hazardous substance into the environment, the contractor or its agent shall immediately report the incident to the local Fire Department (See Section 12.0). The incident must also be immediately reported to the Government POC. If the amount released meets or exceeds the reportable quantity as listed in 40 CFR 302, the contractor or its agent shall immediately notify the National Response Center (Sign up to see this detail). The liability for the spill or release of hazardous substances rests solely with the contractor and its agent. 9.2 If the work to be performed in on-site, the contractor shall provide the Contracting Officer and the Government POC proof of General Liability Insurance or Pollution Legal Liability Insurance for both the contractor and any sub-contractors prior to the commencement of services. The contractor shall also be liable for damages to Government property in the event such damages are found to be due to negligence on the part of the contractor and shall be a no cost to the Government. 10.0 Safety Requirements. 10.1 The contractor is solely responsible for compliance with all Federal, State, and Local laws, including, but not limited to, the OSHA Act (Public Law 91-596) and the resulting standards, and OSHA Standard 29 CFR 1910. The Government shall assume no liability of responsibility for the contractor's compliance or non-compliance with such requirements. In addition, the contractor is required to flow down the safety requirements/specifications to all sub-contracts/sub-contractors. Safety requirements listed herein that do not concern contractor's operations or services as mutually agreed by the Contracting Officer and the contractor shall be deleted by a modification to the contract. 10.2 The contractor shall be subject to safety inspections of its worksites by the Government. Contractor safety records shall be available up request by the Contracting Officer. The contractor shall be liable for, and shall indemnify and hold harmless, the USCG against all action or claims pertaining to the "personal" safety requirements of its employees. The USCG will NOT provide contractors with respiratory protection, safety shoes, prescription eyewear or any other Personal Protection Equipment (PPE). The contractor shall be responsible for determining and providing the correct PPE required, prior to any performance of work. 10.3 If the work to be performed is on-site, a hazardous material control program shall be in effect to inform employees of potential hazards if and when chemicals are used. The Safety Data Sheets (SDS) will be maintained on file IAW OSHA 29 CFR 1910-1200 and will be provided to contractor and sub-contractor employees for review of safety and health information. The SDS's for any hazardous materials that will be used in the performance of this contract shall be submitted to the Government POC prior to the contractor/sub-contract's arrival onboard the facility. Hazardous materials storage is the responsibility of the contractor and shall be in accordance with NFPA, as well as, Federal, State, and Local Environmental and Safety Regulations. 11.0 Liability Insurance. 11.1 The contractor shall procure and maintain insurance during the entire period of performance under this contract, IAW FAR 52.228-5, entitled "Insurance - Work on a Government Installation". The following minimum insurance is required: 11.1.1 Worker's Compensation and Employer's Liability. As required by applicable Federal and State, Worker's Compensation and Occupational Disease Statutes. 11.1.2 General Liability: Bodily injury liability insurance coverage written on the comprehensive form of policy of at least $200,000 per person and $500,000 per occurrence. 11.1.3 Automobile Liability Insurance: Written on a comprehensive form of policy of at least $200.000 per person for bodily injury and $500,000 per occurrence for property damage. 11.1.4 Pollution Legal Liability Insurance: Required for both the contractor and any sub-contractors prior to the commencement of services. The contractor shall also be liable for damages to Government property in the event such damages are found to be due to negligence on the part of the contractor and shall be at no cost to the Government. 11.2 Prior to commencement of work hereunder, the contractor shall furnish to the Contracting Officer, a certificate or written statement of the above required insurance. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the interests of the Government shall not be effective until thirty (30) days after written notice has been given and approved by the Contracting Officer. 12.0 Contractor Identification. All contractor and sub-contractor personnel will be required to wear and display badges provided by the contractor/sub-contractor identifying them as contractor/sub-contractor employee. 13.0 Contracting Officer's Authority. No oral or written statement by any person other than the Contracting Officer will, in any manner or degree, modify or otherwise affect the terms of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the Contracting Officer. In the event the contractor effects such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred as a result thereof. 15.0 Government Point Of Contact's Information. The Government Point of Contact (POC) will be available to answer questions and coordinate the performance of work during regular business hours (Monday through Friday, excluding Government holidays, between the hours of 7:00 am to 4:00 pm). POC information will be provided at contract award. 16.0 Inspection and Acceptance. The Government reserves the right to inspect the contractor's work at any time during the installation of the systems. The project will not be considered complete until the Government POC has inspected and accepted the work accomplished by the contractor.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS