Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on July 10, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

HOMER J. STEWARDSHIP PROJECT

Awarded
AG-9A63-S-14-0025Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 20 hours ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 20 hours ago

DEADLINE

in 3 days
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning (PCT) contracts in the McAllister Creek area on the Colville Indian Reservation. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit SP-16-PCT-27 (13.44 acres). The scope of work requires the selection and retention of the most vigorous trees, strict slash management including clearing roadways and streams, and the removal of all foreign debris. Contractors must adhere to specific technical standards, such as maximum stump heights of one-half the stump diameter and a maximum slash height of 24 inches, with financial penalties of 3 dollars per tree for damage to leave trees. Bids must be physically submitted to the mailbox at the Mt Tolman Complex by 4:00 PM on November 17, 2026, as electronic submissions are prohibited. A complete bid packet must include a bid sheet, bid evaluation form, a detailed work plan, TERO compliance and utilization forms, and a signed debarment certification. Award decisions are based on the contractor being responsive and responsible, though the lowest bid is not guaranteed to be accepted. Payment is issued per completed and accepted acre, with 20 percent of each payment withheld until final acceptance. Contractors are required to provide liability insurance and comply with TERO Title X and TOSHA safety regulations.
Confederated Tribes of the Colville Reservation

POSTED

about 20 hours ago

DEADLINE

in 18 days
NAICS: 115310
New
Grant
Landscape Scale Restoration Grant Program for Tribes
Solicitation # USDA-FS-2026-LSR-TRIBAL
The Landscape Scale Restoration Grant Program for Tribes, solicitation USDA-FS-2026-LSR-TRIBAL, is a competitive funding opportunity administered by the USDA Forest Service. The program supports collaborative, science-based forest restoration projects on rural non-industrial private forest land, rural state or local government forest land, and Indian trust or fee lands. Projects must align with a science-based restoration strategy, such as a Tribal Forest Plan, and focus on reducing wildfire risk, improving fish and wildlife habitats, maintaining water quality, or mitigating invasive plants, insects, and disease. Total program funding is 1.26 million dollars, with individual awards ranging from 100,000 to 300,000 dollars. A mandatory 1:1 non-Federal cost-share match is required for all grant recipients. Applications must be submitted via email to [email hidden] by January 26, 2027. Required documentation includes a project narrative limited to five pages, a detailed budget spreadsheet, and a valid Unique Entity Identifier from SAM.gov. Projects involving equipment purchases must submit form FS 1500-34, and all applicants must undergo a risk assessment and submit a financial capability questionnaire prior to award. The evaluation process is based on a 100-point scale focusing on deliverables, goals, strategy integration, and sustainability. Awarded projects must be completed within three years, with possible extensions up to five years. Performance is measured by quantitative outcomes in hazardous fuels management, invasive plant treatment, or insect and disease management.
Forest Service

POSTED

1 day ago

DEADLINE

in 3 months

AI Contract Overview

Show more

The Tahoe National Forest is soliciting best value offers for the Homer J Stewardship Project, a commercial item acquisition designed to trade goods for services across multiple units in the urban interface. The primary objectives are to conduct commercial tree thinning and reduce hazardous fuels across 537 acres of natural stands. The scope of work includes the cutting and removal of individually designated commercial sawlogs, the thinning of small conifers, and the treatment of existing and activity-generated slash to minimize the need for government burning. The contract consists of 11 mandatory activity bid items and two optional items, requiring the contractor to perform whole tree removal of small trees and transport limbs and tops to landings. Additional requirements include erosion control, road maintenance, and the removal or chipping of landing slash. While brush treatment is excluded, the contractor must remove dead and down material while adhering to wildlife requirements. All operations are governed by the stewardship project guidelines of Section 323 of Public Law 108-7.

General Info

Tahoe National Forest seeks offers for commercial tree thinning and fuel reduction services.

Contract Value

$1,414,490.88

NAICS

115310 - Support Activities for Forestry

Place of Performance

The project area (537 acres) is located on the South Shore of Lake Tahoe. The legal locations are: T. 11N, R. 18E, Sec. 5, 6, , multiple locations, CA, USA

Set-Aside

NONE

Award Issued Date

Documents

27

Amendment 001 to Solicitation AG-9A63-S-14-0025

DOC, High priority: read this first1 page · amendment
High

Amendment 002 to Solicitation AG-9A63-S-14-0025

DOC, High priority: read this first1 page · amendment
High

Amendment 003 to Solicitation AG-9A63-S-14-0025

DOC, High priority: read this first1 page · amendment
High

Appendix A – Work Activity Items (HomerJ)

DOCX, High priority: read this first11 pages · specifications
High

Appendix C - Road Maintenance and Erosion Control

DOCX, High priority: read this first5 pages · specifications
High

Homer CTL Unit 205 Sawmill Map

PDF, High priority: read this firstspecifications
High

Homer CTL Unit 49 Mastication Map

PDF, High priority: read this first1 page · specifications
High

Homer CTL Unit 5, 109, 1109, 188, 189 & 1189 Map

PDF, High priority: read this first1 page · specifications
High

Homer CTL Units 127, 128, 141 & 1141 Map

PDF, High priority: read this first1 page · specifications
High

Homer CTL Units 17, 155 & 156 Map

PDF, High priority: read this first1 page · specifications
High

Homer CTL Units 199 & 1199 Trout Creek Map

PDF, High priority: read this first1 page · specifications
High

Homer CTL Units 74 & 1074 - Trout Creek Map

PDF, High priority: read this first1 page · specifications
High

Homer CTL Urban Lot Units 236, 242, 335 & 343

PDF, High priority: read this first1 page · specifications
High

Homer CTL Urban Lot Units S. Upper Truckee/Hwy 89 Map

PDF, High priority: read this first1 page · specifications
High

Homer J CTL IRSC-Appendix A Map 5 of 8

PDF, High priority: read this first1 page · specifications
High

Homer J CTL IRSC-Appendix A Map 6 of 8

PDF, High priority: read this first1 page · specifications
High

Homer J CTL Stewardship Contract Area Map 2 of 8

PDF, High priority: read this first1 page · specifications
High

Homer J CTL Stewardship Contract Area Map 3 of 8

PDF, High priority: read this first1 page · specifications
High

Homer J CTL Stewardship Contract Area Map 4 of 8

PDF, High priority: read this first1 page · specifications
High

Homer J CTL Stewardship Contract Area Map (8 of 8)

PDF, High priority: read this first1 page · specifications
High

Homer J CTL Stewardship Contract Area Map (Map 7 of 8)

PDF, High priority: read this first1 page · specifications
High

Homer J CTL Stewardship Contract Area Map - Spring Creek IRSC

PDF, High priority: read this first1 page · specifications
High

Homer J CTL Volume Summary

XLS, High priority: read this first2 pages · specifications
High

Homer J Fuels Reduction and Forest Health Stewardship - Appendix B

DOC, High priority: read this first16 pages · specifications
High

Homer J Fuels Reduction and Forest Health Stewardship Solicitation AG-9A63-S-14-0025

DOC, High priority: read this first49 pages · rfp
High

Wage Determination No: 1977-0727 (Rev. 44) - California Statewide

DOCX, High priority: read this first3 pages · wage-determination
High

Vicinity Map - Homer J CTL

PDF, Low priority1 page · specifications
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Mar 26, 2014 to Mar 27, 2014. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Combined Synopsis

Type Changed

Combined Synopsis → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Tahoe National Forest
Contacts1 person available
OfficeNEVADA CITY, CA, 95959, USA
Office AddressNEVADA CITY, CA, 95959, USA
Contacts
Matthew GagnonContracting Officer

Full Description

Show more
The Lake Tahoe Basin Management Unit is soliciting competitive offers for the Homer J Stewardship Project. The Homer J Stewardship Project is various multiple units in and around the urban interface . Sealed - "Best Value" offers will be received at the Forest Supervisor's Office at Tahoe National Forest, 631 Coyote Street, Nevada City CA 95959 at 1:00 PM local time on March 26, 2014. The solicitation will be released on this website on or about February 28th, 2014. This solicitation and any resultant contract is a stewardship project in accordance with Section 323 of Public Law 108-7 (16 U.S.C. 2104 Note, as revised February 28, 2003 to reflect sec. 323 of J.J. Res. 2 as enrolled), the Consolidated Appropriations Resolution, 2003, amending Public Law 105-277, sec. 347. This is a commercial item acquisition that has been tailored to fit the Government's method of trading goods for services. Work includes 11 mandatory activity bid items and 2 optional items that will be treated in addition to thinning and removal of commercial sawlogs on 537 acres. These stewardship work activity items are described in detail in Appendix A and attachments. Treatment areas consist of natural stands. The intent of the Homer J CTL contract is to conduct commercial tree thinning and reduce hazardous fuels. Commercial thinning will be accomplished through cutting and removal of individually designated trees. Reduction of hazardous fuels will be accomplished by thinning and removal of small conifers and treatment of activity and existing slash. Completion of associated erosion control and road maintenance work will be required for all operations. Brush treatment is not a bid item and is not a requirement of this contract. It is the intent of this contract to both remove and dispose of as much activity and existing slash and other biomass generated from operations as feasible so as to limit the amount of post-contract government slash burning. Whole tree removal of small trees, and removal of top portions and limbs of larger trees to the landing will be required. Removal of existing dead and down to the landing will be required, while retaining what is necessary to meet wildlife requirements. Other slash treatment methods may be utilized only with contract administrator approval. Such methods may include masticating/chipping, piling, or lopping and scattering of slash and biomass material. Slash that is forwarded to landings shall be removed from site or chipped and removed by Contractor. Landing slash disposal will be the responsibility of the Contractor and is a separate bid item.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS