Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

HVAC and Roof Replacement at the Sodium Hypochlorite Building

Closed
CP 25-047State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 6 hours ago

DEADLINE

in 6 days
NAICS: 238160
New
SLED
Mesilla Valley Community of Hope Building 5 Re-roof
Solicitation # 26-27-035
Solicitation 26-27-035, issued by the City of Las Cruces Public Works department, is for the re-roofing of Building 5 at the Mesilla Valley Community of Hope located at 999 W. Amador Avenue, Las Cruces, New Mexico. The project has an estimated total cost of 400,000.00 dollars and involves the removal and replacement of all existing insulation, roof membrane, and metal roofing. The scope of work includes the installation of thermoplastic membrane roofing, standing seam metal roofing, and sheet metal flashing and trim, along with additional insulation and cricketing materials to enhance drainage and performance. Additionally, the contractor must replace ceiling tiles and repair deteriorated stucco and windows at the clerestory. The facility must remain fully operational throughout construction, requiring materials to be procured and delivered prior to demolition to minimize disruption. Bids are due by 2:00 pm on November 3, 2026, and must be submitted via the OpenGov portal. The contract will be awarded based on the lowest individual, grouped, or lump sum unit price, with preferences of up to 10 percent available for New Mexico resident veterans, New Mexico residents, local Las Cruces businesses, and the use of recycled content. Awarded contractors must provide performance and payment bonds, proof of insurance, and adhere to prevailing wage rates as per Wage Decision DA-26-3243-B. All work must comply with SMACNA and AAMA 2605 standards, OSHA safety regulations, and New Mexico Administrative Code licensing requirements. The contract includes a one-year correction period for defective materials and workmanship, with liquidated damages set at 500 dollars per day.
Public Works

POSTED

1 day ago

DEADLINE

in 7 days
NAICS: 238160
New
SLED
TDF - PIF Rooftop Walkway SP
Solicitation # B-54660
The Illinois Department of Human Services is soliciting bids for the installation of approximately 2,000 feet of anti-slip roofing walkway pads at the TDF Rushville facility. The project requires 1,600 feet of Versico brand pads for existing tan TPO roofing and 400 feet of Firestone brand pads specifically for the Gamma housing unit roof. All pads must be 34 inches wide with a minimum thickness of 150 mil, feature a raised diamond plate tread pattern, and include safety yellow edges if available from the manufacturer. Installation must be performed by an approved Versico and/or Firestone installer in accordance with manufacturer specifications and ASTM standards. To be considered responsive, the prime vendor must perform at least 51 percent of the work using permanent, full-time W-2 employees who have been employed for at least 30 consecutive days prior to bid submission. Vendors must certify compliance with the Illinois Prevailing Wage Act, the Illinois Department Human Rights Act, and various state certifications regarding legal entity status, felony convictions, and tax delinquency. The contract includes a 12-month warranty period and allows for termination for convenience with 30 days' written notice. Payments are processed according to the State Prompt Payment Act, and the contract is contingent upon the availability of funds from the Illinois General Assembly or federal sources.
MENTHLTH444 - Mental Health

POSTED

1 day ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The contract solicitation CP 25-047, issued by the City of Turlock, California’s Municipal Services-Engineering division, seeks bids for the replacement of the HVAC system and flat roof at the Sodium Hypochlorite Building, with an engineer’s estimate of $227,500. The scope includes removal and environmentally compliant disposal of existing equipment, installation of a 7.5-ton Bryant packaged rooftop unit (460-volt, 3-phase, 140K BTU heat with coated coils), and a wall-mounted mini-split unit, along with new roof jacks and curbs for HVAC integration. The flat roof must be replaced using either 60 mil PVC or KEE-Stone FB 60 thermoplastic membrane, with strict delivery, storage, and handling requirements for roofing materials—including use of manufacturer-sealed original packaging, dry elevated storage at least four inches above ground, and temperature limits not exceeding 90°F for PVC. All work must comply with ASTM E108 Class A fire ratings and require certification from Factory Mutual, Underwriters Laboratories, or an approved third-party testing facility. Substitutions of materials require a stamped and sealed professional engineer’s report. The contractor must submit a Critical Path Method (CPM) baseline schedule before field construction, provide 3-week lookahead schedules for progress meetings, and sequence work to ensure substantial completion by the deadline. Roof demolition cannot begin until all new roofing materials are on site, and the existing sheathing must be inspected by city staff before installation proceeds. The award will go to the lowest responsible bidder, determined solely by the base bid excluding any additive alternates, and bidders must provide a bid bond of at least 10% of the total bid amount, along with a Non-Collusion Affidavit, proof of licensure, and compliance with Title 49 CFR Part 26 and state non-discrimination statutes prohibiting bias based on race, color, national origin, or sex. Contractors must also obtain a City of Turlock business license prior to receiving a Notice to Proceed, with an upfront fee of $84 plus half a cent per thousand dollars of project revenue paid semiannually. Progress invoices are due monthly, detailing work accomplished to date, and must be reviewed and approved by the Engineer prior to payment. All submittals are electronic via the Internet-Based Construction Management System, and field quality control requires manufacturer representatives to conduct inspections twice weekly and submit detailed reports, culminating in a final certification

General Info

Replacement of HVAC and roof at Sodium Hypochlorite Building, $227,500, Turlock, submissions by June 18, 2026.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

15

Appendix E - HVAC Installation Specifications

PDF, High priority: read this firstspecifications
High

Bidder's Bond for City of Turlock Project

PDF, High priority: read this firstbidder-bond
High

CP 25-047 HVAC and Roof Replacement at Sodium Hypochlorite Building

PDF, High priority: read this firstrfp
High

CP 25-047 Sodium Hypochlorite Building Roof and HVAC Replacement Site Map and Photos

PDF, High priority: read this firstsow
High

Exhibit 12-B Bidder’s List of Subcontractors

PDF, High priority: read this firstsow
High

Exhibit 15-H Proposer/Contractor Good Faith Efforts

PDF, High priority: read this firstsow
High

Flat Roof Technical Specs (PVC) Section 07 54 19

PDF, High priority: read this firstspecifications
High

Project Specifications by City Engineer William D. Morris

PDF, High priority: read this firstspecifications
High

Section 075500 Modified KEE Membrane Roofing Technical Specifications

PDF, High priority: read this firstspecifications
High

Subcontractors Listing Form for California Public Contract

PDF, High priority: read this first1 page · subcontractors-listing
High

Affidavit of Non-Collusion for Bid Submission

PDF, Low priority1 page · affidavit
Low

Disadvantaged Business Enterprises (DBE) Certification Status Change Instructions

PDF, Low priority2 pages · other
Low

Disclosure of Lobbying Activities SF-LLL

PDF, Low priority2 pages · disclosure-of-lobbying-activities
Low

Exhibit 15-G Construction Contract DBE Commitment

PDF, Low priorityform
Low

Exhibit 17-F Final DBE Utilization Report

PDF, Low priorityform
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Municipal Services-Engineering
Contacts2 people available
OfficeTurlock, CA, 95380, USA
Office AddressTurlock, CA, 95380, USA
Contacts
Charlotte CalvarioCapital Projects Coordinator
Gloria AguileraStaff Services Assistant

Interested Companies (23)

Sika SarnafilCanton, MA
Best Contracting ServicesGardena, CA
HSI MechanicalModesto, CA

See All 23 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Engineer's Estimate is $227,500.00.

More opportunities from California → Municipal Services-Engineering

Same awarding agency

NAICS: 237310
SLED
Transit Area Asphalt Resurfacing
Solicitation # 26-044
The Transit Area Asphalt Resurfacing project, solicitation number 26-044, is a municipal construction contract for the City of Turlock, California, with an engineer's estimate of 233,000.00 dollars. The scope of work involves the cold milling and removal of a two-inch asphalt concrete layer, scarifying the native subgrade to 95 percent relative compaction, and applying a new asphalt concrete overlay across approximately 28,400 square feet of pavement at an active Transit Corporation Yard. The project concludes with the installation of permanent thermoplastic striping for bus parking stalls, which must be performed seven calendar days after paving to allow for proper curing. Due to the facility's role in daily CNG bus fueling, the project is subject to strict operational constraints, requiring work to be phased within tight weekend-only windows. The contract will be awarded to the lowest responsive and responsible bidder possessing either a Class A General Engineering or Class C-12 Earthwork and Paving contractor license. Required securities include bid and indemnity bonds of at least 10 percent of the bid amount, and performance and payment bonds equal to 100 percent of the contract price. All work must adhere to California prevailing wage rates for Stanislaus County and City of Turlock Standard Specifications. Performance is tightly scheduled, with substantial completion required within ten days of the Notice to Proceed.
Highway, Street, and Bridge Construction

POSTED

7 days ago

DEADLINE

in 8 days
View Details
NAICS: 237110
SLED
Water Line Replacement on S Center Street and Crane Avenue
Solicitation # 24-022
City Project No. 24-022 is a public improvement agreement for the replacement of water lines on S Center Street and Crane Avenue in Turlock, California. The scope of work involves installing approximately 1,677 lineal feet of new PVC water main pipe and new water service laterals, removing the existing water main pipe, and restoring trenches. The project is managed by the Municipal Services-Engineering division, with Oscar Molina serving as the primary contract administrator. The Engineer's Estimate for the project is 1,100,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder possessing either a General Engineering Contractor (A) or Pipeline Contractor (C-34) license. Bidders must submit proposals via the OpenGov Procurement Portal by November 4, 2026, including a bid bond of at least 10 percent of the total bid. Once awarded, the contractor must provide performance and payment bonds equal to 100 percent of the contract price. Work must commence within 10 working days of the Notice to Proceed, with substantial completion required within 60 working days and final completion within 65 working days. Delay damages are set at 2,800 dollars per substantial working day and 700 dollars per final working day. Compliance requirements include adhering to California Department of Industrial Relations prevailing wage rates, submitting weekly certified payroll, and following highway repair safety standards. The project also emphasizes Disadvantaged Business Enterprise (DBE) participation, requiring specific reporting and commitment documentation. All improvements are subject to inspection and approval by the City of Turlock and its engineers prior to entering service.
Water and Sewer Line and Related Structures Construction

POSTED

20 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS