Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Colorado was posted on July 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

HVAC Controls and Building Automation System (BAS) Integration

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238290
New
Federal
Stair Towers (2 ea) Dismantle, Package/Palletize and Relocate IAW PWS
Solicitation # N32253-26-Q-0048
Solicitation N32253-26-Q-0048 is a request for a firm-fixed-price contract to disassemble, remove, and package for disposal two metal stair towers located at Dry Dock 4 at the Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility in Hawaii. Each tower weighs approximately 76,200 lbs and measures roughly 17 by 29 by 58.5 feet. The contractor is responsible for providing all labor, equipment, and rigging to dismantle the structures into pieces not exceeding 9 tons or dimensions of 8 by 20 by 10 feet. These components must be secured on dunnage or pallets, labeled by weight, and relocated to a government-designated area within a one-mile radius. The tentative period of performance is from September 11, 2026, to November 10, 2026. This procurement is a total small business set-aside under NAICS code 238290. Award will be based on a best-value determination, with technical capability and past performance rated as significantly more important than price. Requirements include strict adherence to safety and environmental guidelines, including NFPA 51B for hot work, OSHA standards, and specific packaging protocols for hazardous materials like asbestos and PCBs. Contractors must also comply with cybersecurity maturity model certification and security access requirements for the shipyard. Quotes are due by September 8, 2026, at 7:00 AM HST and must include a technical capability statement, a removal plan, and an itemized pricing breakdown. Payment will be processed electronically via Wide Area WorkFlow.
Pearl Harbor Naval Shipyard IMF

POSTED

2 days ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The contract entails the programming and integration of new HVAC equipment with existing building automation systems, requiring precise thermostat installation, strategic sensor placement, and full system commissioning to ensure optimal performance and energy efficiency. Work must align with industry standards for building controls and include thorough testing and calibration to validate system functionality across all zones and operational modes. This subcontract, categorized under NAICS code 238290, is issued by the DPA - Capital Construction/Controlled Maintenance division in Colorado with a response deadline of July 10, 2026. The scope demands technical expertise in HVAC controls and building automation, with all activities to be performed on-site where the equipment will be deployed. While specific location details are not provided, performers must be prepared to mobilize to the designated facility and coordinate with existing infrastructure without disrupting building operations.

General Info

HVAC integration with building automation, on-site commissioning, thermostat and sensor installation, Colorado-based, deadline July 10, 2026.

Agency

Colorado → DPA - Capital Construction/controlled MaintenanceView Agency

NAICS

238290 - Other Building Equipment ContractorsView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of IH- 25007.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

IH25007 GJ Boiler & DX Replacement

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → DPA - Capital Construction/controlled Maintenance
ContactsNo contacts available
OfficeN/A
Organization / Agency
Colorado → DPA - Capital Construction/controlled Maintenance
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Programming and integration of new HVAC equipment with building automation systems, including thermostat installation, sensor placement, and system commissioning.