Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

HVAC Curb Build-up

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Arcadia, CA, 91007, USA

Set-Aside

NONE

Documents

This scope was carved out of 100:27-28.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Roofing Services At Hugo Reid Elementary School

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 22 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom Roofing Services At Hugo Reid Elementary School
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Arcadia Unified School District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs structural adjustments to HVAC curbs for prime contractors on Arcadia Unified School District projects. Builds up existing HVAC curbs using framing materials, sealants, and flashing to meet current California Building Code height and specification requirements. Delivers modified HVAC curbs that meet building code requirements.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Federal
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a comprehensive infrastructure effort at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, installation of new instrumentation and electrical components, and the replacement of motor control center components. Additional tasks include modifying sluice gates, installing slide gates and access platforms, rerouting sump pump discharge lines, and performing excavation, trench work, and surveying. Managed by Ranger Pipelines Incorporated, the project has an estimated contract value between 18.5 million and 19.5 million dollars. The solicitation is designated as a set-aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). The bid opening date is scheduled for December 2, 2026. The agency is actively seeking certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and electrical and instrumentation work.
Ranger Pipelines Incorporated

POSTED

about 4 hours ago

DEADLINE

in 6 days
View Details

More opportunities from California → Arcadia Unified School District

Same awarding agency

NAICS: 238160
New
SLED
Roofing Services At Hugo Reid Elementary School
Solicitation # 100:27-28
The Arcadia Unified School District is soliciting bids for roofing services at Hugo Reid Elementary School in Arcadia, California. The project involves the removal and disposal of existing roofing and insulation down to the structural deck, including a 7% allowance for deck replacement. The scope of work includes the installation of a cold-applied 2-ply thermoplastic hybrid roof system (KEE-Stone HP) using District-furnished materials, building up HVAC curbs to meet California Building Code, and replacing various metal components such as coping caps, counterflashing, gutters, downspouts, and edge metal. The contractor is also responsible for installing new KEE Pipe Boots, drain grates, and walk pads while ensuring positive drainage and maintaining a clean jobsite. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must be certified Pre-Approved Garland Contractors with at least five years of documented experience, and the roofing manufacturer must have ISO 9001 certification and twelve years of experience. Required submissions include a bid bond, a designated subcontractors list, a noncollusion declaration, and an Iran Contracting Act certification. The project requires 100% performance and payment bonds, adherence to prevailing wage laws, and a 3% participation goal for Disabled Veteran Business Enterprises. Bids must be sealed and submitted to the District by December 17, 2026, at 2:00 P.M.
Roofing Contractors

POSTED

about 12 hours ago

DEADLINE

in 21 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS