Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from North Carolina was posted on July 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

HVAC Maintenance FY27

Closed
320-190526AGState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
SLED
ICE 8A - Ft Benning Improvements
Solicitation # 70CMSW25R00000011
Solicitation 70CMSW25R00000011 is a firm-fixed-price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for design-build services to support the Immigration and Customs Enforcement (ICE) Office of Firearms and Tactical Programs at Fort Benning, Georgia. The project, valued between 4.0 million and 4.5 million dollars, focuses on life, safety, and operational improvements. The scope of work includes the installation of two aluminum awnings at the shipping and receiving dock and Fiske Range Lane 2, turf replacement at Fiske Range, the demolition of Building 2294, gutter and drainage improvements for Building 234, commercial HVAC services and replacements, and general facility improvements for Building 301 and the DAGr Team facility. The period of performance is 365 days from the date of award. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach, appropriate design resources, and a comprehensive quality control and safety program. The contract is subject to the Davis-Bacon Act, requiring prevailing wage rates and specific paid sick leave for workers. Performance and payment bonds are required per FAR 52.228-15. Proposals must be submitted in two volumes: a technical and safety volume and a pricing volume using the provided template. All payment requests must be processed electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 13 hours ago

DEADLINE

in 6 days
NAICS: 238220
New
SLED
PIDC Project 3 - Dorm RTU Replacement and SCADA
Solicitation # 872287
This firm-fixed-price task order, issued under an 8(a) MACC IDIQ, involves the replacement and upgrade of Rooftop HVAC Units (RTUs) for the Alpha, Bravo, Charlie, and Delta dorms, as well as a SCADA system upgrade at the Port Isabel Detention Center in Los Fresnos, Texas. The project objective is to replace corroded and obsolete equipment with high-quality, coastal weather-resistant, and durable systems that exceed commercial standards. The scope includes removing existing RTUs, replacing necessary piping, electrical, and ducting, and installing new SCADA software and two chemical feed pumps in compliance with Texas Commission of Environmental Quality standards. The estimated magnitude of the project is between 1.2 million and 1.5 million dollars, with a period of performance of 365 days from the date of award. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach, appropriate design resources, and a comprehensive quality control and safety program. Key requirements include the submission of a Quality Control Plan, a safety plan, and the designation of a Project Manager with at least five years of relevant federal contracting experience. The contractor must also provide a one-year warranty for installation and craftsmanship and ensure all personnel pass required background checks for site access. Compliance with the Davis-Bacon Act and associated executive orders regarding wages and sick leave is mandatory. All payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 13 hours ago

DEADLINE

in 13 days
NAICS: 238220
New
RFQ7593 Smoke Detector Installation
Solicitation # RFQ7593
Management & Training Corporation (MTC) is soliciting bids for a fee-for-service subcontracting opportunity to provide smoke detector installation and fire system services at the Sierra Nevada Job Corps Center in Reno, Nevada. The scope of work requires the replacement of 43 smoke detectors across specific dormitory rooms, including 12 detectors in rooms 11, 15, and 18, 12 detectors in room 19, and 19 detectors in rooms 20 and 21. The contractor must ensure all installed detectors communicate with the fire panel and that all work adheres to NFPA standards and local Authority Having Jurisdiction requirements. Bids must be submitted via email to Tom Williams by 3:00 PM PST on September 18, 2026. To be considered, applicants must provide a completed bid sheet, proof of insurance, and a supplier packet containing a W-9, self-certification form, and acceptance of terms and conditions. This opportunity is open to various small business set-asides, including SDB, WOSB, HUBZone, and Veteran-Owned businesses, under NAICS code 238220. Award decisions will be based on the best value as determined by MTC. The contract mandates compliance with Service Contract Labor Standards and Wage Determination No. 2015-5595 Revision 28 for labor rates in Washoe and Storey counties. Additionally, subcontractors must provide a 12-digit Unique Entity ID and certify their debarment status under FAR 52.209-6 if the subcontract exceeds 30,000 dollars. Strict adherence to government and Department of Labor guidance regarding the protection of sensitive and proprietary information is required.
Sierra Nevada Job Corps Center

POSTED

about 13 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
2026-Clearfield-Bldg E8 Welding HVAC
Solicitation # 2026- Clearfield- Welding Bldg. E8 HVAC Replacement
Management & Training Corporation is seeking fixed-price lump sum bids for a subcontracting opportunity to replace the HVAC system at Building E8 Welding within the Clearfield Job Corps Center in Clearfield, Utah. The scope of work includes the complete change-out of the existing motor, installation of wiring, conduit, disconnects, breakers, fuses, and starters, and the subsequent validation of voltage, phase, and grounding. Deliverables include startup and testing documentation, onsite training for maintenance personnel, and the provision of manufacturer O&M manuals. All work must adhere to OSHA requirements, federal, state, and local codes, and site safety procedures. Bids must be submitted via email to nelson.dar@jobcorps.org and patricia.willover@mtctrains.com by September 19, 2026, at 3:00 PM MST. To be considered for award based on overall best value, offerors must complete a physical site visit, provide a detailed bid breakout on company letterhead, and submit a bid bond guarantee. The project is a small business set-aside under NAICS 238220 and requires compliance with Davis-Bacon prevailing wage determinations for Davis County. Awardees must provide a UEI number, submit a Schedule of Values for invoicing via AIA G702/G703 forms, and provide original payment and performance bonds from a surety with at least an A- rating within five business days of an Intent to Award letter. Performance dates will be established upon the signing of a Notice to Proceed.
Management & Training Corporation

POSTED

about 13 hours ago

DEADLINE

in 8 days
NAICS: 238220
New
CBP7664 Wellness HVAC Compressor Replacement
Solicitation # CBP7664
Management & Training Corporation is seeking bids for a subcontracting opportunity to replace a failed HVAC/refrigeration compressor at the Wellness facility of the Sierra Nevada Job Corps Center in Reno, Nevada. This fixed-price, single lump sum contract requires the contractor to provide all labor, materials, and equipment to execute a five-phase process including preparation, demolition, installation of an OEM-specified compressor, system testing and commissioning, and final closeout. The project must restore full cooling capacity and operational efficiency while adhering to EPA Section 608 regulations for refrigerant recovery. The work must be completed within thirty consecutive business days following the receipt of a written Notice to Proceed. Bids will be evaluated based on overall best value, considering price, quality, and delivery schedule. The estimated price range is between 0 and 25,000 dollars, though bids equal to or greater than 25,000 dollars require a 20 percent bid bond guarantee and subsequent performance and payment bonds from an A-rated surety company. Submission requirements include a bid sheet, proof of insurance, three comparable project references, and a completed supplier packet containing a W-9 and self-certification of business size under FAR 52.219-8. Contractors must comply with Davis-Bacon Act prevailing wage rates for Washoe County and adhere to FAR 52.204-10 reporting if the award reaches 40,000 dollars. Final payment is contingent upon a successful final inspection and the submission of a notice of final completion, certified payroll reports, and operation and maintenance manuals.
Sierra Nevada Job Corps Center

POSTED

about 13 hours ago

DEADLINE

in 12 days
NAICS: 238220
New
This is a subcontracting opportunity to replace a chiller in McKinney, TX.
Solicitation # subcontracting-opportunity-replace-chiller-mckinney-tx
Serrato Corporation is seeking bids for a subcontracting opportunity to replace a failing air-cooled chiller at the North Texas Job Corps Center, specifically within Building 214/215 in McKinney, Texas. The scope of work includes the demolition and disposal of the existing chiller, the installation and startup of a new air-cooled chiller, and the integration of building automation controls using a JACE 9000 central integration point. Additionally, the contractor is responsible for installing three-way control valves at four air handling units, replacing VFDs, performing AHU cleaning and inspection, and ensuring all wiring is plenum-rated. Bids must be submitted by September 18, 2026, and quotes must remain valid for 90 days. Required submission documentation includes manufacturer equipment specifications, a Certificate of Liability Insurance naming Serrato Corporation as the holder, and Form 1413 for Davis-Bacon Act certified payroll compliance for work exceeding 2,000 dollars. Insurance requirements include a minimum of 500,000 dollars for Employers Liability and 1,000,000 dollars per occurrence for Commercial General Liability. The project is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB. Primary points of contact for this solicitation are Stacy Smith and Roy Henderson.
Serrato Corporation DBA North Texas Job Corps

POSTED

about 13 hours ago

DEADLINE

in 7 days
NAICS: 238220
New
Main Building 1 Wing 5 – Six Rooftop HVAC Unit Replacement – Glenmont Job Corps Center
Solicitation # S26-010
The Glenmont Job Corps Center is soliciting proposals from qualified, New York State licensed contractors for the replacement and installation of HVAC equipment within Main Building No. 1, Wing 5 (Education Building) in Glenmont, New York. The project involves replacing two 7.5-ton split-system units for the auditorium, one 6-ton rooftop unit for the library and computer lab, and one 12.5-ton rooftop unit for the north and east wing classrooms. Additionally, the scope includes installing four 2-ton ductless mini-split heat pump systems, removing a window air-conditioning unit, and abandoning two 5-ton rooftop units in place. Comprehensive associated work encompasses demolition, roof curbs and penetrations, ductwork, refrigerant and condensate piping, electrical work, controls, structural roof evaluations, and fire alarm and duct smoke detector installations, concluding with testing, balancing, and commissioning. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and Veteran-Owned Small Businesses. The project must be completed within 210 calendar days following the written Notice to Proceed, and the facility will remain operational throughout the construction period. Key deadlines include a pre-proposal site walkthrough on September 10, 2026, with vendor questions due by September 14, 2026. Final proposals must be submitted by September 21, 2026, at 4:00 PM ET. All work must comply with applicable New York State codes, safety regulations, and environmental requirements.
Adams and Associates, Inc.

POSTED

about 13 hours ago

DEADLINE

in 10 days
NAICS: 238220
New
Replace HVAC Systems in the following buildings on our campus –1.) ABL Dormitory
Solicitation # 26-141
This subcontracting opportunity, managed by Adams & Associates, Inc. for the U.S. Department of Labor, involves the replacement of HVAC systems at the Atterbury Job Corps Center ABL Dormitory in Indiana. The project requires replacing existing R-22 Bryant condensing units and coils serving common areas and dormitory wings A, B, C, and D with new 12.5 SEER packaged units utilizing non-R22 refrigerants such as R-410A or R-454B. The contractor is expected to reuse existing electrical disconnects, ductwork, and thermostat wiring, and must label and leave all recovered refrigerant on-site. Bidders must attend a mandatory site visit on September 23, 2026, and submit a single lump sum proposal by October 5, 2026. Award will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Eligible vendors must maintain an active SAM.gov registration and a Unique Entity ID, hold a valid Indiana Contractor's License, and provide proof of specific automobile and workers' compensation insurance. Compliance with EPA, OSHA, and Davis-Bacon Act wage determinations is mandatory. Final payment is subject to Net 30 terms and is contingent upon the submission of a completed SF 1413, certified payroll records, and the release of liens from all subcontractors and material suppliers.
Adams & Associates, Inc.

POSTED

about 13 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The City of Rocky Mount is soliciting proposals for comprehensive HVAC maintenance and repair services under Contract HVAC Maintenance FY27, with solicitation number 320-190526AG, issued on July 21, 2026, and proposals due by August 6, 2026. The contract requires the contractor to provide preventative maintenance and emergency repair services for all heating, ventilation, and air conditioning systems across city facilities, including chillers, boilers, heat pumps, controls, refrigeration equipment such as ice machines and walk-in coolers, and restroom ventilation fans excluding ceiling-mounted units. Services must be performed during normal business hours from 8:00 A.M. to 5:00 P.M., Monday through Friday, excluding recognized holidays, with 24/7 emergency response required and repairs initiated within two hours of notification. The contractor must supply all necessary labor, tools, equipment, vehicles, and materials, including filters, belts, refrigerants, lubricants, paints, and replacement components for moving parts such as bearings, motors, seals, and actuators. All work must adhere strictly to manufacturer specifications, industry best practices, and applicable federal, state, and local regulations including OSHA, CARB, and AQMD standards. The contractor is responsible for troubleshooting system failures prior to repair or replacement, documenting all maintenance and repair activities, submitting written reports within 48 hours of service completion, and notifying the city representative if equipment is beyond economical repair and requires replacement. Excluded from the scope are original system design, installation, structural modifications, gas or water piping, electrical service beyond HVAC equipment, ductwork, thermal insulation, damage caused by misuse or vandalism, and work required by governmental or insurance agencies. The contract has an initial term of two years, beginning October 1, 2026, and ending September 30, 2028, with work to commence within 30 business days of the effective date. Proposals must include a cover letter, title page, RFP body and addenda, pricing details (Attachment A), terms and conditions (Attachment B), and supplemental vendor information (Attachment C), submitted as one original and one photocopy in separate sealed envelopes. Electronic, faxed, or emailed submissions are prohibited. The evaluation is based on a trade-off process that considers technical qualifications, vendor experience, personnel credentials, minority business enterprise participation goals, and overall value to the City, not on lowest price alone, and includes a

General Info

Contractor provides full HVAC maintenance, repairs, and emergency services with all parts and labor, excluding design, ductwork, and utility issues.

Agency

North Carolina → City of Rocky MountView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

NC, USA

Set-Aside

NONE

Documents

(2)

RFP 320-190526AG - HVAC Maintenance FY27

PDFrfp

2026 HVAC Equipment List

PDFequipment-list

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → City of Rocky Mount
Contacts1 person available
OfficeNC, USA
Organization / Agency
North Carolina → City of Rocky Mount
View Agency Profile
Office AddressNC, USA
Contacts
Alicia Gaines

Full Description

Show more
The Contractor shall retain professional personnel who have successfully and competently provided commercial facility HVAC maintenance and repair services on projects of similar scope and complexity. For the purpose of this contract, routine preventative HVAC maintenance shall be defined as scheduled routine inspection and proactive servicing of HVAC systems so as to facilitate heating/cooling with minimal downtime. The routine maintenance and all repairs shall be provided in accordance with the highest standards of the industry, skill, workmanship, applicable trade practices, meet warranties and in conformance to all applicable laws, codes and regulations. The successful Bidder’s preventative maintenance and repairs shall, at a minimum, include but not limited to the specifications outlined herein. It is the Bidder’s responsibility to provide an appropriate level of on-site staffing, materials, tools, equipment and vehicles to address the scope of work necessary to support all building HVAC equipment during normal business hours 8:00 A.M.- 5:00 P.M. Monday through Friday: Recognized holidays excepted and for response after normal working hours. Bidders’ services are to be compliant with all Federal, State, CARB, AQMD, OSHA and all other applicable regulatory requirements. Provide labor and material to perform preventative maintenance, service, and repair of all HVAC equipment. All filters, belts, annual testing and written report of the chilled water and semi-annual boiler, water treatment, grease, refrigerant, oil, touch-up, paint, and mechanical, electrical, miscellaneous parts and materials needed to maintain the equipment to service, repair, and maintain to the manufacturer's specifications will be included in this proposal. Also includes work as needed to other refrigeration equipment such as ice machines, walk-in coolers, etc. Contractor shall repair or replace failed or worn moving parts (such as, but not limited to: bearings, motor rotors, motor starters, seals, gears, burners, actuators, controls and switches). Prior to beginning any repair or replacement, Contractor will troubleshoot the system to diagnose the system's problems. Contractor shall itemize the equipment list covered as repairable or replaceable. If HVAC Equipment is not repairable, contractor will contact the City representative with an estimate to replace with an equivalent type. Work not included in this quote will be as follows: Original system design and installation; utility company service problems.; Non-moving parts such as heat exchangers, boiler tubes, shells, condenser tubes, , gas, and water piping ; natural gas supply; air distribution duct work; air balance; thermal insulation; improper operation; negligence or misuse of equipment by persons occupying the space, the owner, the owner's representative, or vandals; alteration, additions, or repairs made by others', catastrophic acts of nature; equipment interiors and exteriors; electrical service beyond the parts of the heating; cooling, and ventilation equipment; electrolysis; work required by governmental agencies or insurance agencies; removing, replacing, or altering any part of the building structure in the performance of this agreement. Individual ceiling mounted restroom ventilation fans are also excluded from this agreement.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS