HVAC Repairs at Worland, WY BLM Office
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Bureau of Land Management’s Wind River/Big Horn District Office is seeking contractors to perform critical repairs on the HVAC system at its facility in Worland, Wyoming, to ensure continued safe and efficient operations for employees and visitors. The system has experienced degradation in heating performance, damper functionality, and integration with the Metasys digital control interface, requiring comprehensive corrective action to meet BLM facility standards and maintain mission readiness. The work includes removing and replacing the existing heating coil in the Trane air handling unit, with the contractor responsible for field-verifying all dimensions and performance characteristics prior to fabrication to ensure the new coil meets or exceeds the original equipment’s capacity, flow, materials, and configuration, using Trane's published specifications as a baseline. This solicitation, identified as 140L6226Q0022, is a Small Business Set Aside under NAICS code 238220 and was posted on August 5, 2026, with a response deadline of August 20, 2026. The contract is managed by the Oregon State Office of the Department of the Interior, located in Portland, Oregon, though all work is to be performed at the BLM office in Worland, Wyoming. Primary point of contact for inquiries is Addison Page, reachable via phone at 303-236-3800 or email at addison_page@ios.doi.gov. All work must be completed to ensure full functionality of the HVAC system, including integrated control interface verification, and must adhere to all applicable federal facility operation and maintenance requirements.
General Info
Agency
NAICS
Place of Performance
ORSet-Aside
Documents
(3)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
This Statement of Work (SOW) defines the services required to restore proper function to the facility's HVAC system through the replacement of core components, correction of installation deficiencies, and verification of system performance within the Metasys digital control interface.
The Contractor must remove and replace the existing heating coil located in the Trane air handling unit (AHU). The Contractor must field-verify all dimensions and performance characteristics before fabrication. The replacement coil must meet or exceed the original equipment specifications for capacity, flow, materials, and configuration. Specifications may be obtained from Trane manufacturing.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of The Interior → Oregon State Office
Same awarding agency
