Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on December 5, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hydraulic Cylinder Fabrication and Repairs

Closed
W911WN26Q1AYXFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

333995 - Fluid Power Cylinder and Actuator Manufacturing

Place of Performance

Pittsburgh, PA, USA

Set-Aside

SBA

Documents

2
DOCX, High priority: read this first16 pages · specifications
High
PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Pittsburgh
Contacts2 people available
OfficePITTSBURGH, PA, 15222-4198, USA

Full Description

Show more

**Sources Sought Announcement: Hydraulic Cylinder Fabrication and Repairs BPA**


The U.S. Army Corps of Engineers is conducting a sources sought to identify qualified vendors capable of providing hydraulic cylinder fabrication, rehabilitation, honing, and associated services. This effort aims to establish a Blanket Purchase Agreement (BPA) for hydraulic cylinder fabrication and repair. The required services encompass a range of cylinder sizes and specifications, including fabrication of new cylinders and pistons, rehabilitation of existing cylinders, and honing services to restore cylinder bores to specified dimensions. Sizes range from 9" to 19" bore and lengths vary.


The BPA will cover a variety of contract line-item numbers (CLINs) including fabrication of new hydraulic cylinders, rehabilitation of existing cylinders, honing of cylinders, and fabrication of new pistons and piston rods. Work will be performed in accordance with provided specifications, reference drawings, and applicable industry standards. This includes material requirements, welding procedures (AWS D1.1/D1.1M, ASME BPVC SEC VIII D1, ASME BPVC SEC IX, ASME B31.1), and quality control measures, such as radiographic and magnetic particle inspection.


Interested vendors should demonstrate a minimum of 5 years of experience in the fabrication of industrial hydraulic cylinders of similar size and function. Respondents must also be able to meet stringent quality requirements, provide detailed shop drawings and submittals, and comply with all applicable security and access control procedures for work performed at government facilities. The selected vendor(s) will be responsible for the pickup and delivery of cylinders/parts to the Pittsburgh Engineer Warehouse and Repair Shop (PEWARS).

More opportunities from Department Of Defense → W072 Endist Pittsburgh

Same awarding agency

NAICS: 237990
New
Federal
Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Solicitation # W911WN27QA004
The Borough of Millvale Local Protection Project (LPP) rehabilitation is a USACE project located along Girty's Run in Millvale Borough, Pennsylvania. The scope of work involves repairing significant flood damage from April 2024, specifically addressing bank erosion, shoaling, ruptured gabion baskets, and washed-out concrete buttresses that currently impede streamflow. The contractor will be responsible for site preparation, including erosion and sediment controls and temporary water diversions, as well as the excavation and removal of debris, replacement of damaged concrete paving and gabions, and the placement of stone-filled gabions between Station 68+00 and Station 73+80. This is a 100% Small Business Set-Aside under NAICS 237990, with an anticipated construction cost between $300,000.00 and $350,000.00. The award will be a single Firm-Fixed-Price purchase order based on best value, evaluating price and past performance. The project must be completed within 365 calendar days of the written Notice to Proceed, with work commencing within 10 days of that notice. Key requirements include the provision of performance and payment bonds at 100% of the contract price, adherence to the Davis-Bacon Act, and the appointment of a Superintendent who cannot also serve as the Site Safety and Health Officer.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 25 days
View Details
NAICS: 238210
Federal
RFI - Survey for Advance Contract Initiative Temporary Emergency Power
Solicitation # ACI-TEP-Survey
The Department of Defense, through the USACE Pittsburgh District, is conducting a sources-sought fact-finding exercise for an Advance Contract Initiative regarding Temporary Emergency Power. This initiative aims to establish a contract prior to federal declared emergencies to ensure rapid response capabilities across the United States and its territories. The current objective is to gather industry feedback on logistics, mobilization sequencing, subcontractor relationships, and cost drivers to inform future scope considerations and efficiency improvements. The scope of work involves providing all labor, equipment, and materials to support temporary emergency power activities through three phases: Mission Readiness, Mission Mobilization, and Mission Execution. Key responsibilities include conducting pre-installation inspections to determine generator sizing and connection methods, managing equipment at staging areas, and executing the installation of generators and external fuel tanks. Contractors must adhere to specific FEMA Bill of Materials standards and maintain 24-hour response operations. Operational requirements include the potential deployment of a five-person Advanced Echelon team and the appointment of a Site Safety and Health Officer. Performance is measured by the accuracy of installation assessments and the ability to mobilize assets to staging areas in a fully operational status. The process is governed by strict reporting timelines, including a 30-minute voice communication response standard and a 60-minute notification window for mishaps or incidents.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

18 days ago

DEADLINE

in 18 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS