Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Hydrologic and Hydraulic Modeling Specialist

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity involves providing specialized hydrologic and hydraulic modeling services for restoration projects managed by the Virginia Department of Wildlife Resources. The selected specialist will support prime contractors by performing advanced hydrologic analysis and building and calibrating HEC-RAS 2D models to simulate both existing and design storm conditions. Key responsibilities include evaluating various restoration design concepts and analyzing potential hydrologic trespassing risks to ensure project integrity. The work will be performed at the Coastal Forest Wildlife Management Area Tract 38. To qualify for this role, the contractor must possess a Professional Engineer license and have access to HEC-RAS 2D software. Deliverables for the contract include comprehensive hydraulic modeling simulation results and a detailed technical summary report. Interested parties must submit their responses by the deadline of October 9, 2026. This engagement is classified under NAICS code 541330 and is specifically tailored for technical experts capable of high-level environmental and engineering modeling.

General Info

PE licensed specialist providing HEC-RAS 2D modeling for Virginia wildlife restoration projects.

Place of Performance

Coastal Forest Wildlife Management Area (WMA) Tract 38, VA, USA

Set-Aside

NONE

Documents

This scope was carved out of IFB-128587.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Hydrologic and Geomorphic Analysis at Coastal Forest WMA Tract 38

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVirginia Department of Wildlife Resources
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs advanced hydraulic modeling and hydrologic analysis for prime contractors on Virginia Department of Wildlife Resources (DWR) restoration projects. Builds and calibrates HEC-RAS 2D models of existing and design storm conditions, evaluates restoration design concepts, and analyzes hydrologic trespassing risks. Requires Professional Engineer (PE) license and HEC-RAS 2D software. Delivers hydraulic modeling simulation results and a technical summary report.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to resolve sewer system deficiencies in southwest Bend through the extension of a gravity sewer mainline, the decommissioning of existing pump stations, and the installation of service laterals for properties currently utilizing onsite septic systems. The scope of work specifically involves connecting to a manhole at the Cinder Lane and McMullin Drive intersection and extending west along Cinder Lane, Alpine Drive, and Lodgepole Drive, terminating at Poplar Street. Additional requirements may include transportation improvements such as ADA curb ramp design and roadway reconstruction. The total project budget for design and construction is 3,875,000 dollars, funded primarily by the Water Reclamation Capital Improvement Program fund and the Stormwater fund, with administration through the Oregon Department of Environmental Quality via the Clean Water State Revolving Fund. The City of Bend will award the contract based on a scoring system evaluating project understanding, team qualifications, and firm experience, with an optional interview component. The goal is to have the project advertised for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of its good faith effort to include diverse businesses.
Parametrix

POSTED

about 10 hours ago

DEADLINE

in 3 days
View Details
NAICS: 541330
New
College Park East Stormwater Infrastructure Design Services - Seal Beach, CA
Solicitation # CIP SD2601
The City of Seal Beach is soliciting professional engineering design services for the College Park East Stormwater Infrastructure Project, identified as solicitation CIP SD2601. The primary objective is to advance the project to a shovel-ready phase to mitigate chronic flooding in the College Park East neighborhood. The scope of work includes a comparative evaluation of two pump station siting alternatives—Ironwood and Aster Park—and the development of comprehensive 60%, 90%, and 100% plans, specifications, and estimates (PS&E). Additional responsibilities involve environmental review and permitting for CEQA and NEPA compliance, utility coordination, field surveys, and the design of storm drain lines, culverts, catch basins, and detention basins. This procurement is funded in part by a U.S. EPA Community Project Funding award and is subject to federal procurement standards under 2 CFR Part 200, including domestic-preference requirements and non-discrimination mandates. Selection will be conducted on a qualifications-based basis in accordance with the Brooks Act and California Government Code, with the City evaluating technical proposals before unsealing confidential, task-based fee proposals. Evaluation criteria are weighted toward the understanding of the scope and delivery (40%), team qualifications and experience (25%), and organization and project approach (25%). Proposals must be submitted by 2:00 PM on September 22, 2026, to the Department of Public Works. Selected consultants must adhere to strict professional standards, provide quality assurance and constructability reviews, and comply with California prevailing wage laws and federal equal employment opportunity regulations.
PACIFIC Advanced Civil Engineering, Inc.

POSTED

about 10 hours ago

DEADLINE

in 2 days
View Details
NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Ready Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-ready-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing utility locating and potholing, geotechnical and geophysical investigations, LIDAR, and drone services. It also includes comprehensive engineering support across civil, structural, mechanical, electrical, and instrumentation and controls disciplines, as well as cathodic protection system design, BIM/3D modeling, commissioning, startup planning, and land surveying. Additionally, the project requires environmental services, including hazardous materials surveys, permitting support, compliance monitoring, and environmental assessments, along with CPM scheduling. The solicitation specifically targets Disadvantaged, Minority, Women, and Other Business Enterprises, requiring certification from recognized agencies such as the SBA, MBDA, or California Unified Certification Program. Responsive bidders must hold a valid California Contractor license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the bond premiums. Bidders must also demonstrate the ability to maintain labor harmony, as Kiewit is a signatory to several collective bargaining agreements. Interested firms must contact Lead Estimator Joe Bockelman to receive an Invitation to Bid via the Building Connected system. The bid date is September 11, 2026, and plans and specifications are available for review at the Kiewit office in Costa Mesa, California.
Kiewit Infrastructure West Co.

POSTED

about 10 hours ago

DEADLINE

in 3 days
View Details

More opportunities from Virginia Department of Wildlife Resources

Same awarding agency

NAICS: 237990
New
SLED
Flippo-Gentry WMA Isolated Wetland Pool Project
Solicitation # IFB-128467
The Virginia Department of Wildlife Resources is soliciting competitive bids for the Flippo-Gentry WMA Isolated Wetland Pool Project in Sussex County, Virginia. The project involves the construction of four compacted clay-lined wetland pool basins and one earthen ditch plug. Key technical requirements include excavating clay-rich soils up to six feet deep and installing a compacted clay liner with a minimum total thickness of 24 inches. The scope also includes site restoration through seedbed preparation and the application of DWR-provided seed and straw mulch, as well as the management of woody debris and the legal disposal of metallic, wood, or concrete materials. All work must comply with the Virginia Erosion and Sediment Control Law, the Virginia Stormwater Management Handbook, and OSHA excavation standards. The contract period is scheduled from November 1, 2026, through December 31, 2026, specifically timed to avoid the Northern Long-Eared Bat time-of-year restrictions. Bids must be submitted electronically via the eVA portal by October 9, 2026, and must include firm unit pricing, a Virginia Contractor License number, and at least three professional references. Award priority is given to DSBSD-certified micro or small businesses. Evaluation is based on responsiveness and responsibility, with specific insurance requirements including a one million dollar per occurrence commercial general liability policy. Payment for invoices exceeding five thousand dollars is processed within 30 days of performance and receipt of a valid invoice.
Other Heavy and Civil Engineering Construction

POSTED

about 20 hours ago

DEADLINE

in 13 days
View Details
NAICS: 541620
New
SLED
Hydrologic and Geomorphic Analysis at Coastal Forest WMA Tract 38
Solicitation # IFB-128587
The Virginia Department of Wildlife Resources has issued Invitation for Bids IFB-128587 for hydrologic and geomorphic analysis at the Coastal Forest Wildlife Management Area Tract 38 in Accomack County, Virginia. The project, scheduled for implementation from October 2026 through July 2027, requires a contractor to perform hydrologic assessments, monitor stream and wetland conditions for up to six months, conduct LiDAR/DEM evaluations, and perform HEC-RAS 2D modeling. Key deliverables include the installation and coordination of three to four additional monitoring wells, the development of conceptual hydrologic restoration designs, and a final report. Bidders must submit a written project schedule within ten days of contract signing. This is a firm unit price solicitation, and interested parties must submit their bids electronically through the eVA portal by the deadline of October 9, 2026. To be determined responsive and responsible, bidders must provide a detailed technical response demonstrating their capability to meet the Statement of Need, along with a pricing schedule and at least three professional references for similar services. The contract includes award priority for DSBSD-certified micro and small businesses, including women-owned and minority-owned entities. All work is subject to the Commonwealth of Virginia Vendors Manual and various state regulations regarding ethics, drug-free workplaces, and equal opportunity employment.
Environmental Consulting Services

POSTED

about 21 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
SLED
Lunsford Mill Dam Removal
Solicitation # 128681
The Virginia Department of Wildlife Resources is soliciting bids for the removal of the Lunsford Mill Dam and the stabilization of a small section of streambank in the North Fork Holston River, located in Scott County, Virginia. This lump sum contract requires a licensed contractor to provide all labor, materials, and equipment to remove the dam, legally dispose of all unearthed debris, and restore impacted access roads to their original condition. Work is scheduled to begin around November 2, 2026, and is expected to be completed within approximately one week. Due to the need to protect aquatic species, construction must occur during low-flow conditions in coordination with agency biologists. Bids must be submitted electronically via eVA by 2:00 P.M. on October 21, 2026, and include a Small Business Procurement Plan and examples of two previously completed dam removals. A mandatory pre-bid conference is scheduled for October 6, 2026. The contract will be awarded to the lowest responsive and responsible bidder. Key requirements include compliance with Virginia Erosion and Sediment Control laws, adherence to prevailing wage rates, and the provision of performance and payment bonds. For bids exceeding 500,000 dollars, a bid bond equal to five percent of the bid amount is required. Substantial completion is required within 120 calendar days, with liquidated damages set at 500 dollars per day for delays.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in 25 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS