Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

I-80 CAPM Antelope to Sierra College, EA 03-2J170

Forecast
03-2J170State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The I-80 CAPM Antelope to Sierra College Project (EA 03-2J170), managed by the California Department of Transportation District 3, focuses on preserving and extending the service life of pavement and drainage systems on Interstate 80. The project scope spans from 0.7 miles east of the Antelope Road Overcrossing to 0.4 miles east of the Sierra College Boulevard Overcrossing, covering postmiles 17.4 in Sacramento County to 7.8 in Placer County. Key objectives include improving safety and mobility for freight and the general public, enhancing pedestrian safety, and upgrading facilities to meet Americans with Disabilities Act standards. Construction is projected for 2028 and will take place within Caltrans Right-of-Way and three Temporary Construction Easements. The project is certified as categorically exempt under CEQA and NEPA, with no significant environmental impacts identified. Compliance requirements include strict adherence to biological resource protections, noise control, and hazardous waste specifications. Specific deliverables include a Water Diversion Plan to be submitted 10 days before construction begins and the installation of full trash capture devices to comply with the Statewide National Pollutant Discharge Elimination System. Contractors must implement invasive species control by removing all soil, plant materials, and animal remnants from equipment. Additionally, the project requires a designated representative and a qualified biologist to be coordinated with the California Department of Fish and Wildlife.

General Info

Caltrans District 3 to rehabilitate I-80 pavement and drainage in Roseville for safety and longevity.

Agency

California → Caltrans, District 3 - Marysville/Sacramento

Place of Performance

On Interstate 80 (I-80) from postmile (PM) 17.4 in Sacramento County to PM 7.8 in Placer County, Roseville, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 3 - Marysville/Sacramento
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 3 - Marysville/Sacramento
Office AddressN/A
Contacts
Obaida AktherAssociate Environmental Planner

Full Description

Show more
The California Department of Transportation (Caltrans) proposes the “I-80 CAPM Antelope to Sierra College Project” to preserve and extend the service life of existing pavement and drainage systems, improve safety and mobility for freight and the traveling public, and enhance pedestrian safety and mobility along I-80.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including SWPPP and quality control. Kiewit is specifically seeking qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Furthermore, Kiewit prioritizes bidders who can demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid through the Building Connected electronic system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
250218.01 Reconstruction of 84th Avenue and Riley Street Bike Path
Solicitation # 250218.01
The City of Zeeland is soliciting bids for the reconstruction of 84th Avenue and the Riley Street Bike Path in Ottawa County, Michigan. This project involves approximately 1,450 feet of street and drive reconstruction and 1,450 feet of a shared use path, including HMA paving and storm sewer improvements. Key work items include the installation of 5,800 square yards of 8-inch aggregate base, 540 feet of 18-inch sewer in stone trench, and 2,800 feet of modified concrete curb and gutter, along with manholes and catch basins. The engineer's estimate for the project is 1,111,000 dollars. Encrypted bids must be submitted via the Bid Express e-bidding system by 11 a.m. local time on Thursday, November 12, 2026. To be considered, bidders must be prequalified by the City of Zeeland and include a proposal guarantee in the form of a bid bond or certified check for five percent of the total bid. The contract will be awarded based on the summation of unit prices, and unbalanced or incomplete bids will be disqualified. The project is entirely funded by the City of Zeeland and must be completed by April 30, 2027, with liquidated damages of 1,000 dollars per calendar day for delays. The selected contractor must provide performance and lien bonds each totaling 100 percent of the contract value and file certification of Workmen's Compensation Insurance. Payments will be made monthly at 90 percent of the value of work performed, with the City retaining 10 percent until final acceptance, subject to a 5 percent cap for Public Agency Contracts under MI PA 524 of 1980. Inspection and materials testing will be managed by Moore & Bruggink, Inc., and the contractor is required to implement a quality control plan following Division 5 of the MDOT Standard Construction Specifications.
Moore & Bruggink, Inc

POSTED

about 7 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237310
New
SLED
2026 St. Mary¿s Dr. Storm Improvements & Paving
Solicitation # PE-66212-NONST-2027-000000036
The 2026 St. Marys Dr. Storm Improvements and Paving project, issued by the City of Waycross, Georgia, focuses on critical infrastructure upgrades and road resurfacing on St. Marys Dr. The scope of work includes the removal and replacement of 30 linear feet of 24-inch RCP with 30-inch RCP, the replacement of two double wing catch basins, and the installation of approximately 100 linear feet of curb and gutter. Additionally, the project requires sealing connections for two 15-inch HDPE storm pipes protruding into a 30-inch CMP. Paving improvements consist of approximately 2700 linear feet of milling and overlay, including an open-graded interlayer, asphalt leveling course, pavement striping, and patching, supported by traffic and erosion control measures. This project is funded through LMIG and requires all bidding contractors to be licensed by the State of Georgia. Bidders must be registered with Quest/ESG Engineering, Inc. as having purchased the complete bidding documents, which are available digitally via QuestCDN. Sealed bids must be submitted to the City Manager's Office by December 10, 2026, at 2:00 PM. Bids must include a bid bond or certified cashier's check for at least 5% of the base bid. The successful awardee will be required to provide performance and payment bonds each equal to 100% of the contract price.
City of Waycross

POSTED

about 8 hours ago

DEADLINE

in 30 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS