Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from North Carolina was posted on February 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IFB 2026-020 Union County Sheriff's Office Fuel Station

Closed
377-2026-020State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
Federal
STA Sand Key Repair Fuel Lines and Tank
Solicitation # 30321PR270000001
The Department of Homeland Security, United States Coast Guard, is soliciting a single Firm-Fixed-Price contract for the repair, remediation, testing, and coating of fuel lines, storage tanks, and associated infrastructure at Station Sand Key in Clearwater, Florida. This total small business set-aside under NAICS 237120 involves comprehensive work including treating corrosion on diesel and regular unleaded spill containment units and tanks, applying environmentally safe paint, and calibrating clock gauges for 90 percent high-level warning alarms. The scope also includes repairing dispensers to correct flow rates, performing integrity tests on under dispenser containment and transition sumps, and replacing non-compliant copper fuel piping for the emergency generator tank. The contract will be awarded based on a best value tradeoff, evaluating technical capability, past performance, and price reasonableness. Performance is subject to strict military installation regulations, including a 15 mph speed limit, prohibition of firearms, and a requirement that only U.S. citizens or permanent resident aliens be permitted on site. The contractor must adhere to OSHA 29 CFR Part 1926 safety standards and provide a written safety plan. All work must be coordinated with the Contracting Officer’s Representative to ensure the facility maintains its capability to fuel operational vessels. A pre-proposal site visit is scheduled for November 4, 2026.
Base Miami Beach

POSTED

about 8 hours ago

DEADLINE

in 15 days
NAICS: 237120
New
Federal
Gas Leak Repair, Valve Installation, and Asphalt Patching Services
Solicitation # 75110PR270000104
Solicitation 75110PR270000104 is a request for quotation from the Department of Homeland Security, specifically the Special Mission Training Center, for gas-leak detection and repair services at the Coast Guard Training Center Birmingham Southern in Birmingham, Alabama. This small business set-aside under NAICS code 237120 is a firm-fixed-price contract requiring the contractor to perform excavation, gas-line repair, gas-valve installation, testing, gravel backfill, asphalt patching, and site cleanup. The scope of work focuses on a 6-foot by 6-foot area and must be completed within ten business days from the date of award. The government will award the contract to the small business that meets all technical requirements and provides the lowest total price. Technical acceptability is based on the contractor's ability to complete all Statement of Work tasks, provide a schedule for the ten-day performance period, identify a project manager, and demonstrate possession of required Alabama licenses. Offerors must submit a two-volume proposal consisting of a price section and a technical proposal not exceeding 30 pages. The contract is subject to the Davis-Bacon Act and requires strict adherence to security protocols for site access, including a mandatory site visit on November 2, 2026. Final acceptance is contingent upon a walk-through inspection by the Government Technical Representative.
Special Mission Training Center (smtc)

POSTED

about 8 hours ago

DEADLINE

in 6 days
NAICS: 237120
New
SLED
Rebid of WCTA Fuel System Installation - WCTA PA 2026-1.1GC – General Construction
Solicitation # WCTA PA 2026-1.1GC
Washington County Transportation Authority dba Freedom Transit is soliciting bids for contract WCTA PA 2026-1.1GC to construct a new fuel system at the WCTA Operations Facility located at 375 Berry Road, Washington, PA. The scope of work includes the construction of a concrete fuel tank pad with protective bollards, the installation of one 12,000-gallon gasoline aboveground storage tank and one 6,000-gallon diesel aboveground storage tank, two combo gas/diesel dispensers, two fuel management units, and a metal canopy. The project also requires the installation of all necessary electrical power and control wiring. Bids must be submitted electronically via the PennBid portal by 2:00 PM EST on November 18, 2026. The contract will be awarded to the lowest responsible proposer, with a strong emphasis on the use of Disadvantaged Business Enterprises (DBE). Compliance with Federal Davis-Bacon prevailing wage rates, Buy America requirements, and FTA Circular 4220.1 is mandatory. Bidders must provide a bid guarantee equal to 5 percent of the bid price, and the successful contractor must provide performance and payment bonds for 100 percent of the contract price. Project administration will be handled by a Construction Manager, and payments will be processed using AIA Documents G702/CMa and G703. The contractor is responsible for all quality control testing and inspections, and the project includes a 60-day warranty period from the date of installation.
Washington County

POSTED

1 day ago

DEADLINE

in 20 days
NAICS: 237120
New
International
EXCAVATION AND BACKFILLING OR JOINTS REPAIR WORK OF KWSC PIPELINE
Solicitation # Doc342127147
Pakistan Refinery Limited is seeking sources for the excavation and backfilling or joints repair work of the KWSC pipeline in Pakistan. The scope of work involves excavation across various surfaces including concrete, soil, rock, or roads, with an estimated total quantity of 24,000 square feet. Key technical requirements include backfilling in layers not exceeding 6 inches in depth, compacting to 95 percent ASHTO dry density, and performing dewatering as needed. The contractor is responsible for all barricading and shoring using planks and scaffolding in accordance with HSEQ and area standards. Payment for excavation will be based on actual work performed, subject to the satisfaction of the Engineer or Client Representative. Potential contractors are evaluated based on their company profile, legal status, and registration with local authorities such as FBR, SRB, EOBI, and SESSI. Critical evaluation criteria include a proven track record in the oil and gas industry, supported by a client list and official work orders. Applicants must demonstrate the availability of experienced staff and necessary equipment, provide their annual turnover and income tax return acknowledgments, and submit a comprehensive HSEQ competence policy. The solicitation, identified as Doc342127147, was posted on October 23, 2026, with a response deadline of November 4, 2026.
Pakistan Refinery Limited

POSTED

6 days ago

DEADLINE

in 6 days
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
W071 Endist Omaha

POSTED

6 days ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The contract involves the installation of a 12,000-gallon fuel tank along with a dispensing system and associated equipment for the Union County Sheriff's Office. A three-sided enclosure will be built to conceal the fuel tank, enhancing both security and aesthetics. The fuel management system to be installed will integrate with the existing system used by Union County, ensuring seamless coordination and monitoring. Additional work includes replacing a portion of asphalt with concrete and installing speed bumps designed to assist with spill containment, thereby improving safety and environmental compliance. Coordination is required with Union County Facilities and Fleet Management to ensure appropriate access, security protocols, and scheduling of any necessary shutdowns during the installation process. The solicitation for this project was issued by the County of Union in North Carolina, with Kyle Hodge designated as the primary point of contact. Responses to the solicitation were due by March 31, 2026, following its posting in February 2026. This effort supports infrastructure improvements that enhance fuel management and safety for county operations.

General Info

Install 12,000-gallon fuel tank, enclosure, fuel system integration, concrete replacement, and safety measures.

Documents

2

Addendum 1 to IFB 2026-020 Union County Sheriff's Office Fuel Station

PDF, High priority: read this firstamendment
High

IFB 2026-020 Union County Sheriff's Office Fuel Station

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → County of Union
Contacts1 person available
OfficeNC, USA
Office AddressNC, USA
Contacts
Kyle Hodge

Full Description

Show more
The project scope of work includes providing a 12,000-gallon fuel tank, dispensing system, and associated equipment. A three-sided enclosure will be constructed to conceal the fuel tank. The fuel management system will integrate with Union County’s existing fuel management system. Other accessory work includes replacing a section of asphalt with concrete, installing speed bumps to assist spill containment. The Work includes coordinating with Union County Facilities and Fleet Management for access, security, and shutdowns.

More opportunities from North Carolina → County of Union

Same awarding agency

NAICS: 238220
SLED
IFB 2026-068 Rebid IFB Detention Center Boilers Replacement
Solicitation # 2026-068
Union County, North Carolina, through its Facilities Management department, is soliciting lump sum bids for the turn-key replacement of two existing domestic water boilers at the Union County Detention Center in Monroe, North Carolina. The scope of work includes the demolition and legal disposal of existing equipment and the installation of two new Energy Star qualified condensing gas-fired boilers. One unit will serve the kitchen with a 500,000 MBH input and 100-gallon storage, while the other will serve the showers with a 1,100,000 MBH input and 100-gallon storage. Both units must achieve a thermal efficiency of 94% or better. The contractor is responsible for all necessary connections, including domestic water, gas, venting, condensate, and electrical, as well as providing all required permits, testing, startup, and owner training. The contract will be awarded to the lowest responsible responsive bidder. Bidders must be licensed in the State of North Carolina and provide a five percent bid deposit. Submissions must be delivered as a sealed package by 2:00 PM EST on November 4, 2026. The project must reach substantial completion within 120 calendar days of the Notice to Proceed. Key requirements include adherence to Federal Equal Employment Opportunity policies, compliance with the North Carolina Boiler Safety Bureau, and the execution of confidentiality agreements for all personnel accessing the detention center. The contract includes a one-year warranty on work and specifies that payments will be made within 30 days of invoice receipt, subject to appropriation by the Union County Board of Commissioners.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

10 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS