Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on December 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IFB B50784 ¿ Uninterruptible Power Supply (UPS) Data Center Rehabilitation ¿ Candler Park

Closed
B50784State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Metropolitan Atlanta Rapid Transit Authority (MARTA) is soliciting bids for the installation of a dual-feed uninterruptible power supply (UPS) system aimed at improving the reliability, resiliency, and efficiency of its critical power infrastructure at the Candler Park data center. The project involves procuring and installing one APM2 100kVA UPS unit along with necessary battery and maintenance bypass cabinets, transformers, and other supporting equipment. In addition to hardware installation, the contract includes factory-certified startup and testing services to ensure proper functionality and integration of the new UPS system. The solicitation was posted on December 24, 2025, with a response deadline set for January 20, 2026. This contract is managed by MARTA under the Georgia state agency framework. Interested parties can reach out to the primary point of contact, Kendra Clay, for further information or clarifications. The initiative reflects MARTA’s commitment to enhancing its power infrastructure to support uninterrupted operations of its critical systems, ensuring operational continuity and minimizing downtime risks.

General Info

MARTA seeks bids for installing a 100kVA UPS system at Candler Park data center.

Documents

1
PDF, High priority: read this firstifb
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • TRANSFORMER, POWEROpen now, due in 11 days
  • POWER SUPPLYOpen now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Metropolitan Atlanta Rapid Transit Authority
Contacts1 person available
OfficeN/A

Full Description

Show more
The Metropolitan Atlanta Rapid Transit Authority (MARTA) is undertaking a project to install a dual-feed uninterruptible power supply (UPS) system to enhance the reliability, resiliency, and efficiency of its critical power infrastructure. This initiative includes the procurement and installation of one (1) APM2 100kVA UPS units, associated battery cabinets, maintenance bypass cabinets, transformers, and supporting components, along with factory-certified startup and testing services.

More opportunities from Georgia → Metropolitan Atlanta Rapid Transit Authority

Same awarding agency

NAICS: 541512
SLED
IFB B600684 ¿ I.T. Infrastructure Monitoring and Observability Platform
Solicitation # B600684
The Metropolitan Atlanta Rapid Transit Authority (MARTA) is soliciting bids under IFB B600684 for an I.T. Infrastructure Monitoring and Observability Platform. The scope of work involves professional services to deploy High Availability (HA) configurations and configure the Server and Application Monitor (SAM) module for MARTA's SolarWinds monitoring platform, alongside a three-year maintenance and support renewal. Technical requirements include the implementation of Microsoft SQL Server Always on Availability Groups or SQL Server Failover Cluster Instances (FCI). To be eligible, contractors must be an active Authorized SolarWinds Value-Added Reseller (VAR) and a SolarWinds Certified Service Partner (CSCP), with personnel holding a SolarWinds Professional Certification or two years of equivalent experience. The contract will be awarded based on price to a responsive and responsible bidder who is technically and financially qualified. Bidders must adhere to strict cybersecurity standards, including the NIST Cybersecurity Framework, NIST Risk Management Framework, and CIS 18 controls, while ensuring the confidentiality, integrity, and availability of MARTA data. Compliance with the Americans with Disabilities Act, Title VI of the Civil Rights Act, and MARTA's Code of Ethics is mandatory. All bids must be submitted electronically by December 7, 2026, and must include required documentation such as the Contractor's Affidavit, No Conflict of Interest certification, and a list of proposed subcontractors.
Computer Systems Design Services

POSTED

10 days ago

DEADLINE

in 17 days
View Details
NAICS: 541330
SLED
AE50793 ¿ Planning and Preliminary Engineering Services
Solicitation # AE50793
The Metropolitan Atlanta Rapid Transit Authority (MARTA) is soliciting Qualification Statements from architectural and engineering design firms to provide professional consulting services for planning and preliminary engineering in support of Capital Program Delivery projects. The scope of work focuses on providing expertise in engineering, design, architecture, and planning during the preliminary engineering stage for system expansion. Work is authorized on a non-exclusive basis through individual Work Orders, each with a discrete scope, schedule, and compensation limit. The contract term is five years from the effective date. Proposals are due by December 10, 2026, and are evaluated based on technical capabilities, specialized experience, project monitoring and quality assurance, key personnel qualifications, management concepts, financial capability, and compliance with equal employment and disadvantaged business enterprise requirements. Contractors must adhere to EPA, OSHA, and DOT regulations, as well as ISO 9001 and ISO 10007 standards for quality and configuration management. Required submissions include a detailed technical proposal, audited financial statements for the past three years, and various certifications regarding debarment, lobbying, and conflicts of interest. There is no specified set-aside status for this solicitation.
Engineering Services

POSTED

25 days ago

DEADLINE

in 20 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS