This Solicitation opportunity from Virginia was posted on October 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
IFB - IMPROVE CAMPUS UTILITIES INFRASTRUCTURE - ELECTRICAL
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Radford University is soliciting bids for the Improve Campus Utilities Infrastructure - Electrical project, which involves a major upgrade to the campus medium voltage distribution system. The scope of work includes modifications to the utility provider's outdoor substation, the addition of campus walk-in service switchgear, the establishment of a sixth campus distribution loop, and connection to a new cogeneration plant. Additionally, the project requires the demolition of an overhead distribution circuit and the installation of various electrical components such as apparatus post insulators, line switches, surge arresters, and grounding connections, as well as the commissioning of SCADA, BMS, lighting, HVAC, and fire alarm automation systems. The contract will be awarded on a lump sum basis to the lowest responsive and responsible bidder. Bids are due by 2:00 P.M. on October 15, 2026, and must be submitted to the Armstrong Facilities Management Building in Radford, Virginia. Requirements for bidders include eVA registration, a mandatory site visit, and the submission of a Small Business Procurement Plan. For bids exceeding 500,000 dollars, a bid bond equal to 5 percent of the bid is required. The project has a performance period of 269 calendar days to substantial completion, with final completion due within 30 days thereafter. Contractors must comply with the Virginia Uniform Statewide Building Code and Department of Labor and Industry prevailing wage determinations. Key deliverables include power system studies, a detailed step-by-step testing plan for control systems, as-built drawings, and O&M manuals. The contractor is responsible for obtaining all permits except for the building permit, which will be provided by the owner. Payment will be processed monthly via Certificate for Payment (CO-12) following review by the Architect/Engineer and the Owner's Project Manager.
General Info
Place of Performance
Radford, VA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from Virginia → Radford University
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
