Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IFB Maintain Existing Planting Area at Saratoga Creek Bridge, Santa Clara County

Closed
04A7066State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
Federal
Solicitation is Restricted to the Land Management Integrated Resources (LMIR) BPA
Solicitation # 12363N27Q4006
Solicitation 12363N27Q4006 is a Small Business set-aside call order under the Land Management Integrated Resources (LMIR) BPA, issued by the USDA Forest Service Stewardship Contracting Branch. The project focuses on post-fire weed detection and suppression repair in Alamogordo, New Mexico, specifically utilizing Early Detection Rapid Response (EDRR) to identify and eradicate non-native invasive species introduced by fire suppression activities. The scope of work includes performing at least two surveys per area between March and July, providing GPS-located photo points and weed occurrence forms, and executing treatments via hand-pulling or approved herbicides. Mechanical removal is prohibited, and all herbicide use must comply with the Lincoln National Forest Integrated Non-Native Invasive Plant Management Project EIS. The period of performance is scheduled from January 4, 2027, to October 28, 2027, with an estimated workload of 389 acres for early detection surveys and 20 acres for rapid response treatments. Award will be based on the lowest price among technically acceptable quotes, evaluated through a two-step process covering equipment capability, timing, past performance, and the proposed technical approach. Key requirements include New Mexico pesticide applicator or operator licenses for all personnel handling herbicides and adherence to AGAR and FAR clauses regarding government property, emergency response, and employment certifications. Invoicing must be processed through the Department of Treasury's Invoice Processing Platform.
Stewardship Contracting Branch Usda-Fs

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 115310
New
Federal
Wisconsin - East Zone Gravel Pit NNIS Treatment Amendment 2: RFQ for 12363N26Q4152 This is for the Land Management Integrated Resources BPA only
Solicitation # 12363N26Q4152
Solicitation 12363N26Q4152 is a BPA Call issued by the USDA Forest Service Stewardship Contracting Branch for the control of non-native invasive plants (NNIP) within and adjacent to 23 gravel pits on National Forest System lands. The project is located in the East Zone of Wisconsin, specifically across the Eagle River-Florence and Lakewood-Laona Ranger Districts, covering areas in Florence, Long Lake, and Tipler Town, as well as Marinette, Menominee, Oneida, Portage, Shawano, and Vilas counties. The scope of work involves the treatment of 100 infested gross acres targeting species such as spotted knapweed, Canada thistle, and wild parsnip using Forest Service approved herbicides. This opportunity is restricted to Land Management Integrated Resources BPA holders and is designated as a total Small Business Set Aside under NAICS code 115310. The contract will be awarded to the most qualified responsive responsible bidder based on an evaluation of past experience, past performance, technical approach, and price. Offerors are required to submit a technical capability statement detailing their personnel, timeframe, deliverables, and survey work experience. The contractor must provide all necessary labor, equipment, and herbicides, and is required to use a GPS unit for boundary identification. Compliance is verified through 100 percent visual inspection by the COR, and final payment is contingent upon the submission of daily treatment logs and the return of any issued USFS Yale keys. Key regulatory requirements include adherence to biobased product certifications, DEI discrimination clauses, and strict PPE and herbicide label safety standards.
Stewardship Contracting Branch Usda-Fs

POSTED

about 12 hours ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 23 hours ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 23 hours ago

DEADLINE

in 3 days
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning (PCT) contracts in the McAllister Creek area on the Colville Indian Reservation. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit SP-16-PCT-27 (13.44 acres). The scope of work requires the selection and retention of the most vigorous trees, strict slash management including clearing roadways and streams, and the removal of all foreign debris. Contractors must adhere to specific technical standards, such as maximum stump heights of one-half the stump diameter and a maximum slash height of 24 inches, with financial penalties of 3 dollars per tree for damage to leave trees. Bids must be physically submitted to the mailbox at the Mt Tolman Complex by 4:00 PM on November 17, 2026, as electronic submissions are prohibited. A complete bid packet must include a bid sheet, bid evaluation form, a detailed work plan, TERO compliance and utilization forms, and a signed debarment certification. Award decisions are based on the contractor being responsive and responsible, though the lowest bid is not guaranteed to be accepted. Payment is issued per completed and accepted acre, with 20 percent of each payment withheld until final acceptance. Contractors are required to provide liability insurance and comply with TERO Title X and TOSHA safety regulations.
Confederated Tribes of the Colville Reservation

POSTED

about 23 hours ago

DEADLINE

in 18 days

General Info

Documents

2

IFB 04A7066 Addendum No. 1 - Saratoga Creek Bridge Planting Area

PDF, High priority: read this firstamendment
High

IFB # 04A7066 - Maintain Existing Planting Area at Saratoga Creek Bridge

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The documents and files attached to this solicitation do not have any updates for digital accessibility at this time. Updates will be applied as soon as they are available. For an accessible version of solicitation documents published on this page, please submit a request to contact@example.gov  or call +1 (555) 000-0000.
Contractor shall provide to the California Department of Transportation (Caltrans) all labor, tools, materials, equipment, travel, and incidentals necessary to provide services that Maintain Existing Planted Areas (MEPA) and conduct noxious weed and invasive non-native plant eradication for maintenance of established planted areas that are part of the Saratoga Creek Bridge Project Mitigation and Monitoring Plan for On-Site Restoration Activities (EA 04-3G631); the goal of which is to ensure a survival rate of 100% of existing plants and establishment of 75% of native vegetation cover is present and less than 10% groundcover is comprised of invasive species rated as ¿High¿ by the California Invasive Plan Council¿s database by November 2026.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Modify the existing traffic control signals.
Solicitation # 07-381404
The California Department of Transportation is soliciting bids for Contract 07-381404 to modify existing traffic control signals on State Highway Route 213 at Del Amo Boulevard in the City of Torrance, Los Angeles County. The project has an estimated cost of 780,000 dollars and requires bids to be submitted on a unit price basis by November 17, 2026. The scope of work includes modifying signal and lighting systems, implementing temporary signal systems and pedestrian access routes, and installing thermoplastic crosswalks and pavement markings with enhanced wet night visibility. Contractors must also submit a Lead Compliance Plan and adhere to specific technical standards for electrical systems and roadside signs. Performance must begin within 180 days of contract approval, with a 72-hour notice required before starting job site activities. The contract mandates compliance with Buy America requirements for certain department-furnished materials, such as traffic controller cabinets and camera assemblies, and requires adherence to California prevailing wage rates. Quality assurance involves source inspections for equipment enclosures and functional testing of cameras in the presence of an Engineer. Administrative requirements include submitting payment information through the department's prompt payment monitoring system, with strict payment timelines for subcontractors and material suppliers.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 19 days
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Los Angeles County At Various Locations On Route 10 From 0.2 Mile West Of Francisquito Avenue Undercrossing To Fairplex Drive Overcrossing And On Route 57 From 0.3 Mile South Of Brea Canyon Road Undercrossing To Gladstone
Solicitation # 07-379904
Solicitation 07-379904 is a unit price construction contract issued by the California Department of Transportation for highway improvements in Los Angeles County. The project scope involves construction on State Highway Route 10, from 0.2 mile west of the Francisquito Avenue undercrossing to the Fairplex Drive overcrossing, and on Route 57, from 0.3 mile south of the Brea Canyon Road undercrossing to Gladstone. With an estimated project cost of 7.4 million dollars, the work encompasses roadway excavation, concrete removal, clearing and grubbing, and the implementation of drainage, utilities, and electrical systems. Key deliverables include pavement structural work and comprehensive traffic management, requiring the use of special portable freeway detour signs and changeable message signs to ensure the traveled way remains open when construction is not active. The contract mandates strict adherence to 2025 Standard Specifications and Standard Plans, with project plans approved on June 9, 2026. Bidders must submit responses by December 8, 2026. Compliance requirements include following Buy America/Build America standards for manufactured products, providing environmental product declarations for concrete and asphalt, and adhering to prevailing wage rates as determined by the California Department of Industrial Relations or the U.S. Secretary of Labor, whichever is higher. Quality control is emphasized through mandatory ACI Concrete Field-Testing Technician Grade 1 certification for personnel and rigorous testing of materials at METS. Additionally, the project requires a lead compliance plan and specific marking and labeling standards for steel barriers, connection bolts, and pavement markings.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS