Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IFB #S26-33366 California Department of Rehabilitation Refrigeration Service & Repair (Sacramento, West Sacramento, Santa Clara, and Sonoma Counties)

Closed
S26-33366State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Rehabilitation is seeking a contractor to provide comprehensive refrigeration service and repair for equipment supporting its Business Enterprise Program across Sacramento, West Sacramento, Santa Clara, and Sonoma Counties. The contractor must service a wide range of equipment located in state, federal, and county offices as well as privately owned cafeterias, snack bars, convenience stores, and vending facilities, including refrigerators, freezers, salad bars, ice machines, frozen yogurt machines, wall-mounted air conditioners, prep stations, and walk-in units. All services must adhere to strict environmental regulations, requiring proper refrigerant recovery and recycling under 40 CFR 82, Subpart F and Section 608 of the Clean Air Act, with technicians holding valid Type 1, Type 2, or Universal certifications. The contractor must hold a valid California C38 Refrigeration Contractor license and use only original manufacturer parts, with no allowed use of refurbished or rebuilt components. Parts and materials charges are capped at 20% above wholesale cost excluding tax, with a maximum of $2,000 per job unless pre-approved, and all removed parts must be left on-site for BEP vendor inspection. Service is required five days a week, excluding state holidays, between 7:00 a.m. and 5:00 p.m., with premium rates applied for work outside these hours or on Sundays and holidays, contingent upon prior written authorization. The contractor must respond to service requests within four hours, or within six hours for emergencies defined as health and safety or hazardous conditions. All repairs carry a 30-day warranty, with the contractor bearing all costs for call-backs. Each job requires prior estimate approval and is initiated via an Authorization for Repairs and Service DR 1308 form, which must be signed by both the contractor and the BEP vendor on-site, confirming arrival and departure times and detailing work performed. The BEP vendor must remain present during service, and failure to coordinate access results in a one-hour labor charge. The contractor must maintain cleanliness, protect building surfaces, remove all tools and debris daily, and assume full liability for any damage to property or loss of items in their custody. Invoicing must be submitted monthly to [email hidden] on contractor letterhead within 30 days of service completion or five business days after request, with full documentation including signed DR 1308 forms, original receipts for parts and freight, and itemized labor, parts, and shipping costs

General Info

Provide 24/7 refrigeration repair for BEP facilities, five days weekly, with warranties, OEM parts, and strict documentation.

NAICS

N/A

Place of Performance

CA, USA

Set-Aside

NONE

Documents

5
PDF, High priority: read this first4 pages · special-notice
High
PDF, High priority: read this first9 pages · special-notice
High
PDF, High priority: read this firstifb
High
PDF, Low prioritypayee-data-record
Low
PDF, Low prioritycertification-form
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Rehabilitation
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
A) Type of Service 1) The Department of Rehabilitation's (DOR) Business Enterprise Program (BEP) equipment is located in State, Federal, County office buildings, privately owned buildings cafeterias, snack bars, convenience stores and vending machine facilities. 2) The contractor shall provide Commercial Refrigeration, Service and Repair, including replacement parts. Service shall be performed on equipment to include, but not limited to refrigerators, freezers, salad bars, ice machines, frozen yogurt machines (refrigeration only), wall-mounted air conditioning units, prep stations and walk-in refrigerators and freezers. Observing and testing system operation Dismantling malfunctioning systems and test components Repairing and replacing defective parts (with approval) Recovering and reclaiming refrigerant Installing wiring to connect component to a power source Brazing or soldering defective joints and leaks. B) Locations Locations listed in Exhibit G are subject to change. The Contractor will be notified in writing of any change in locations. C) Service Hours All Services shall be provided five (5) days a week, excluding holidays, between the hours of 7:00 a.m. to 5:00 p.m. For work which needs to be accomplished before or after normal working hours, a charge of one-and-one-half (1-1/2) times the bid rate will be granted. For work which needs to be accomplished on a Sunday or official State holiday, an amount of twice the bid rate will be granted. Prior authorization must be obtained, in writing, from the DOR's Contract Manager and/or designee for time requested other than normal working hours, Sundays and official State holidays. A list of official State holidays is available from the DOR. D) Estimates The DOR's Contract Manager and/or designee requires¿ the Contractor to provide an estimate prior to authorizing any services. E) Response Time From the time the DOR initiates a service request to the time the service commences shall not exceed four (4) hours, unless an extension of time is approved by the DOR's Contract Manager and/or designee. Occasionally, the DOR will inform the Contractor that an emergency condition exists and the Contractor shall complete the required service within a six (6) hour period to the satisfaction of the DOR. In general, service shall be completed within a reasonable and acceptable time period to the DOR taking into consideration the nature and degree of the difficulty of the work involved. Emergency shall be defined as a health and safety or hazardous working environment situation. F) Call Back Services All work shall be under warranty for thirty (30) days from date of completed repair. Time and costs for call backs to previous repairs under warranty shall be borne by the Contractor. G) Notification The Contract Manager will notify the Contractor, via an Authorization for Repairs and Service - DR 1308, of location(s) requiring service and location contact person. The Contractor shall schedule service date(s) and time(s) with the BEP vendor. If the BEP vendor or designee is not on site at the scheduled time and date, the Contractor is to contact the Contract Manager/designee for further instructions. If Contract Manager/designee can not be reached, Contractor is to leave the site without performing any service and will charge the DOR one (1) hour at the Contract labor rate. The Contractor shall obtain the BEP vendor or designee¿s signature on the Authorization for Repairs and Service - DR 1308 upon work completion and verification that equipment is in working order and submit signed Authorization for Repairs and Service - DR 1308 for payment. H) Verification of Arrival The Contractor/service technician is required to have the BEP vendor or his or her staffs verify time of arrival on the job site, as well as the time of departure. BEP vendor or his or her staff must be on site while the service is being performed. The Contractor shall leave a copy of the work order signed by the BEP vendor or his or her staff indicating: 1) minimum time of arrival; 2) time of departure; and 3) general description of work performed at the location. I) Parts and Materials The charges for parts and materials shall not exceed twenty percent (20%) of the Contractor's wholesale costs; excluding tax, i.e.; $100.00 parts cost x 20% x 7.75 (City Sales) Tax = $129.30. The Department of Rehabilitation may pay any applicable sales and use tax imposed by another State. Only original manufacturer parts and materials shall be used. Removed parts shall be left at the location with the BEP vendor or his or her staff for BEP inspection. The maximum amount that may be charged per job shall be $2,000.00. The maximum amount that may be charged per job may be increased with the approval of the Contract Manager or the Business Enterprise Program Manager. See Exhibit B - paragraph 1. Invoicing and Payments - Item 9 for parts and materials cost reimbursements. Used or refurbished or rebuilt parts are not allowed. ¿ J) Freight Charges Contractor will be allowed to recover freight or shipping costs for parts, with no allowance for mark-up, by: 1) Itemizing the cost of freight or shipping on the invoice. 2) Attaching a copy of the freight or shipping invoice (original whenever possible) to the invoice. 3) An original receipt is required for any freight/shipping cost over $50.00. 4) When the freight or shipping invoice includes costs not specifically associated with the billing, the Contractor will only charge for the costs associated with the billing and note the freight or shipping invoice accordingly. K) Work Area Contractor will ensure that the work area is kept clean and free of debris, as necessary, to maintain a safe working environment in and around the location. While working on equipment, Contractor agrees to perform services with as little disruption to the State¿s and BEP vendor operations as possible. All tools, equipment and other work materials belonging to the Contractor will be removed from the work location at the end of each working day. The State shall not be responsible for storage of any Contractor property. L) State Property 1) It shall be the Contractor's responsibility to make all necessary arrangements with office or building manager and local traffic authorities for use of elevators, loading docks, adjacent streets, sidewalks, and/or malls. 2) Any damages by the Contractor to portions of building, premises, equipment, furniture, material or other property will be repaired or items will be replaced by Contractor to the satisfaction of the DOR with no expense to the DOR. 3) Any damages by the Contractor to portions of buildings or premises for which the DOR is responsible, the DOR may, itself, at its option, repair or replace damages and deduct the cost thereof from the Contractor's invoice. 4) Contractor shall provide dust covers, temporary dust barriers, pads, etc., as required to protect building occupants and contents during its operation. Any items lost or stolen while in the Contractor's custody will be replaced by the Contractor at no expense to the State/Federal government. Contractor must receive approval from the State/Federal government to remove equipment from a location. 5) Floors, walls, and ceilings of buildings, including elevators, will be adequately protected by Contractor to prevent marring and scratching or other damages. The State may, itself, at its option, repair any damage or replace any lost or stolen items and deduct the cost thereof from Contractor's invoice. 6) Contractor shall keep site clean as work progresses. Upon completion of the work, all surfaces involved in this project shall be clean of any foreign material. Contractor shall remove all waste materials from the work site and dispose of as required to maintain a safe working environment.

More opportunities from California Department of Rehabilitation

Same awarding agency

NAICS: 445132
New
SLED
03-0190-8 PERS Q Lincoln Plaza
Solicitation # 03-0190-8
The California Department of Rehabilitation has issued an informal competitive solicitation, RFQ 03-0190-8, for the procurement of three Vendo 721 V21 10-select cold drink machines. The contract requires the delivery, installation, and operational setup of these machines within 35 calendar days after receipt of order, with shipping terms set as FOB Destination. All equipment must be newly manufactured goods, as used or reconditioned items are prohibited. The supplier must be the original manufacturer or a factory-authorized supplier and must ensure all machines comply with ADA accessibility standards, UL Standard 751, and NAMA listings. Electrical specifications require 110/120 VAC (60Hz) power with GFCI protected cords and interior safety shut-off switches. A critical requirement of this contract is the coordination with a visually impaired operator to determine specific machine configurations, labels, and coin mechanism requirements. The awarded vendor must provide a 90-day warranty covering all parts and labor, including setup and training, free of charge. Award decisions will be based on the lowest responsive and responsible bidder. Bidders must submit their quotes via email by November 20, 2026, and include essential documentation such as the Bidder Declaration Form GSPD-05-105, a California retailer's seller's permit, and certifications regarding recycled content, federal debarment, and the Darfur Contracting Act. Additionally, bidders must disclose the use of generative AI in their deliverables and provide SB/DVBE certifications where applicable.
Vending Machine Operators

POSTED

1 day ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS