Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Improvements by ABM Parking Services at the Elbow Lot on Harbor Island Drive

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → San Diego Unified Port District

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

(1)

2025-119 Improvements by ABM Parking Services at Elbow Lot NOE

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Justin C HuitemaPlanner I
Adam KellnerBranch Manager

Full Description

Show more
The proposed project would involve maintenance and improvement work by ABM Parking Services (Tenant) to the Elbow Lot at 851 Harbor Island Drive in the city of San Diego, California. Work to specifically complete the proposed project would involve installation of a pay station, parking-related signage, restriping of the lot and associated ongoing maintenance work. Work to complete the project would more specifically include: Installations • Install one (1) solar-powered pay station onto the existing concrete pad on the north end of the lot using approximately four (4) bolts in the same location as the previous pay station onsite; • QR Code signs would be mounted to moveable A-Frame signs and locked to existing light poles; • ADA signage would be mounted to the existing fence using wire straps; • Terms/Conditions signage would be mounted to existing poles at the entrance/exit and by the pay-stations; and • A total of two (2) logo signs would be installed along the fence onsite, with one to be mounted at the northwest corner and one at the southeast corner of the lot. Both logo signs would be attached to a wooden post and secured in the ground by digging a hole and pouring concrete in place. Maintenance • Restriping the parking lot to match the existing layout; • Removal of existing weeds and debris from the parking lot surface; • Repair of broken fences; and • Cleaning out the drains and gutters. Construction of the proposed project is anticipated to occur in late 2025 and would take approximately one (1) month to complete with ongoing maintenance as needed. Equipment required for construction would consist of hand tools, a work truck and associated equipment. Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, the Tenant would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
Monterey One - Renewable Energy Improvements (CP361), Marina, CA
Solicitation # monterey-one-renewable-energy-improvements-cp361-marina-ca
GSE Construction Co., Inc. is seeking qualified subcontractors and suppliers to participate in the Monterey One Water Regional Treatment Plant CP361 Renewable Energy Improvements Project located in Marina, California. The project scope includes extensive upgrades and replacements such as digester gas piping and safety equipment, new access roof hatches with concrete repairs, recoating and structural repairs to all four digesters and the digester building, installation of new level measurement devices, and integration of five Owner-furnished linear generators with associated electrical systems. Additional work involves installing biogas conditioning and renewable natural gas upgrading equipment with a pipeline to the PG&E injection station, replacing the existing steam system with a hydronic heating water boiler, removing old waste gas flares and installing new enclosed flares, and demolishing the Cogen facility and related structures. The project also encompasses civil, structural, mechanical, electrical, and demolition tasks necessary to support these improvements. Bidders must be prepared to comply with the project’s set-aside requirements, which include participation from Disadvantaged Business Enterprises certified by the Department of Transportation, Minority Business Enterprises certified by NMSDC, and Women Business Enterprises certified by WBENC. Responses are to be submitted by August 20, 2026, and interested parties must email estimating@gseconstruction.com to request access to the complete project documentation via a secure link. The solicitation is open to vendors under various NAICS codes related to construction specialties and is not restricted to federal procurement standards, with the lead point of contact being Michael Demissie at GSE Construction Co., Inc.
GSE Construction Co., Inc.

POSTED

about 5 hours ago

DEADLINE

in 12 days
View Details
NAICS: 238910
New
SEA S Concourse Evolution (SCE) – Bid Package 02
Solicitation # sea-s-concourse-evolution-sce-bid-package-02
The Seattle-Tacoma International Airport’s S Concourse Evolution (SCE) Bid Package 2, managed by Hensel Phelps as General Contractor/Construction Manager, encompasses a comprehensive suite of construction and systems integration activities critical to the modernization of the airport’s infrastructure. The scope includes demolition and abatement, building concrete retrofit, structural steel and metal stairs and railings, fire suppression systems, site paving, runway and taxiway marking, site demolition and earthwork, deep foundations, site utilities, aviation fueling systems, and baggage handling systems, with estimated contract values ranging from $124.2 million to $143.7 million across eleven subsystems. This bid package is structured under a Project Labor Agreement (PLA), requiring all workers to adhere to union labor standards, and mandates the use of Hensel Phelps’ standardized subcontract forms for all subcontracts. All subcontractors must provide performance bonds for contracts exceeding $100,000 and are required to submit a Workers’ Compensation Waiver of Subrogation. The work is to be performed entirely at the airport in Washington State, with bids due by August 11, 2026, and must be submitted via email to SEA-SCEBids@henselphelps.com using the official bid form provided in the Instructions To Bidders document. This solicitation is specifically reserved for Small Disadvantaged Businesses (SDB) under NAICS code 238910, with Hensel Phelps acting as an Equal Opportunity Employer and Contractor. Documentation requirements include the submission of the bid form, applicable bonds using provided templates, and strict adherence to the defined submission process, though specific performance periods, inspection criteria, payment terms, and evaluation factors are not detailed in the available materials.
Hensel Phelps

POSTED

about 5 hours ago

DEADLINE

in 25 days
View Details
NAICS: 238910
New
Pismo - DB Services for the Central Coast Blue AWPF, Pismo Beach, CA
Solicitation # pismo-db-services-central-coast-blue-awpf-pismo-beach-ca
GSE Construction Co., Inc. is seeking qualified subcontractors and suppliers to participate in the Design-Build construction of the Central Coast Blue Advanced Water Purification Facility in Pismo Beach, California, under solicitation number 2026-138. The project will deliver a new 0.50 million gallon per day facility aimed at producing approximately 500 acre-feet of purified water annually, incorporating critical components such as a 200,000-gallon equalization tank, membrane filtration, two-stage reverse osmosis, UV/advanced oxidation, post-treatment stabilization, chlorination, chemical storage and feed systems, purified water storage and pumping, and about 2,000 linear feet of HDPE conveyance pipelines. Additional scope includes groundwater recharge infrastructure comprising one injection well and two monitoring wells, along with full electrical, instrumentation, SCADA, and control systems. The solicitation targets specific NAICS codes related to construction, water and wastewater systems, chemical supply, and specialized fabrication, and is open to small businesses including Small Disadvantaged Businesses, Women-Owned Small Businesses, Disadvantaged Business Enterprises, and Minority Business Enterprises certified through NMSDC. Interested parties must contact estimating@gseconstruction.com to request secure access to all project documents prior to submitting a bid, with the response deadline set for August 11, 2026. The solicitation is managed under a set-aside designation supporting small and disadvantaged business participation, and key points of contact for inquiries are Michael Demissie and Juan Catano via their respective GSE email addresses. All technical details, scope requirements, and submission protocols are provided exclusively through the secure link issued after request, ensuring bidders have full context before preparing their proposals. The place of performance is confirmed as Pismo Beach, California, and GSE Construction Co., Inc. is acting as the lead contracting entity on behalf of the City of Pismo Beach for this municipal water advancement initiative.
GSE Construction Co., Inc.

POSTED

about 5 hours ago

DEADLINE

in 3 days
View Details
NAICS: 238910
New
SLED
AL ROLLINS PARK ARTIFICIAL TURF BASEBALL FIELDS RFP
Solicitation # PE-75552-NONST-2026-000000066
The City of Dalton is soliciting proposals for the supply and installation of four new artificial turf baseball fields at Al Rollins Park located at 521 Threadmill Road in Dalton, Georgia. The project requires the contractor to provide and install a complete artificial turf system, including a stone base, storm drainage, nailers, artificial turf, infill, base inserts, and field striping, along with all necessary labor and materials. The City will handle preliminary site work by removing soil to sub-grade and providing a connection point for the underdrainage system, as well as installing a concrete perimeter curb for the wood nailer. The selected contractor must coordinate closely with the City to ensure proper scheduling and phasing of installation. All interested parties are required to attend a mandatory pre-proposal meeting on August 25, 2026, at 2:00 p.m. at KRH Architects Inc. in Dalton; late arrivals will not be admitted. Sealed proposals must be submitted to the City’s Finance Department by 2:00 p.m. on September 8, 2026. The City reserves the right to request additional information from proposers and may shortlist qualified firms for interviews scheduled for September 10 and 11, with notifications sent by the end of the day on September 8. The solicitation number is PE-75552-NONST-2026-000000066, and the primary point of contact is Kenneth Harless of KRH Architects.
City of Dalton

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details