Improvements by ABM Parking Services at the Elbow Lot on Harbor Island Drive
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → San Diego Unified Port District
NAICS
238910 - Site Preparation ContractorsView NAICS
Place of Performance
San Diego, CASet-Aside
NONE
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Full Description
Show more
The proposed project would involve maintenance and improvement work by ABM Parking Services (Tenant) to the Elbow Lot at 851 Harbor Island Drive in the city of San Diego, California. Work to specifically complete the proposed project would involve installation of a pay station, parking-related signage, restriping of the lot and associated ongoing maintenance work. Work to complete the project would more specifically include:
Installations
Install one (1) solar-powered pay station onto the existing concrete pad on the north end of the lot using approximately four (4) bolts in the same location as the previous pay station onsite;
QR Code signs would be mounted to moveable A-Frame signs and locked to existing light poles;
ADA signage would be mounted to the existing fence using wire straps;
Terms/Conditions signage would be mounted to existing poles at the entrance/exit and by the pay-stations; and
A total of two (2) logo signs would be installed along the fence onsite, with one to be mounted at the northwest corner and one at the southeast corner of the lot. Both logo signs would be attached to a wooden post and secured in the ground by digging a hole and pouring concrete in place.
Maintenance
Restriping the parking lot to match the existing layout;
Removal of existing weeds and debris from the parking lot surface;
Repair of broken fences; and
Cleaning out the drains and gutters.
Construction of the proposed project is anticipated to occur in late 2025 and would take approximately one (1) month to complete with ongoing maintenance as needed. Equipment required for construction would consist of hand tools, a work truck and associated equipment. Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, the Tenant would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.