Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Improvements to Interior and Exterior Hotel Spaces and Recreation, Pool and Fitness Areas by Manchester Grand Hyatt

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → San Diego Unified Port District

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

(1)

9-10-25-Project-No-2025-100-KC Environmental Document Filing Fee Receipt and Notice of Exemption

PDFenvironmental-document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Kelly CunninghamAssistant Planner
Dena RoadyGeneral Manager

Full Description

Show more
The proposed project would involve interior and exterior improvements by Manchester Grand Hyatt in the city of San Diego, California. Manchester Grand Hyatt (MGH) (Applicant) is proposing a series of property improvements that are currently scheduled to occur in late 2025 through 2026. The scope of work includes interior club, restaurant, and retail updates and renovations, necessary exterior maintenance and repairs, and improvements to the exterior recreation, pool and fitness areas. Work to specifically complete these various improvements is outlined in further detail below. Project Element 1: •Façade Maintenance & Repairs: These repairs would include removing and replacing caulking at joints and windows, patching the Exterior Insulating Finishing System (EIFS) as necessary, pressure washing the façade, and repainting the exterior of the building. These improvements would take approximately 6-12 months to complete and would require hand tools, pressure washers, and a swing stage for façade access. Work for this portion of the proposed project is anticipated to begin fall 2025. •Top of Hyatt and Grand Club Renovations: Work to specifically complete this component of the proposed project would include, new furniture, fixtures, equipment (FF&E), and finishes including but not limited to, carpet, paint, vinyl wallcoverings, and millwork modification. The proposed work would also include acoustic paneling, retrofit of existing lights, additional sconces, replacement of window shades, installation of new finishes in the existing bathrooms, and adding an electrical circuit in the kitchen for additional cooking equipment. These improvements would take approximately 2-3 months to complete and would utilize hand tools. Work for this portion of the proposed project is scheduled to occur from late 2025 to early 2026. •Market 1 Renovations: Work to complete this portion of the proposed project would involve new finishes including tile flooring, wall tile, millwork, paint, wallcoverings, new lighting layout, and new retail shelving. Work would also include new food service equipment in the front of house service line and additional refrigeration and equipment replacement in the back of house kitchen. This work would require mainly hand tools with minor use of a concrete saw to cut access to allow for plumbing relocation at the service line. This portion of the proposed project would take approximately 4 months to complete and is anticipated to begin fall 2025. Project Element 2: •Recreation Area Renovations: The current recreation space for the Hotel is located on top of the existing parking structure. This portion of the project proposes to further activate the space to allow for improved use of the space. Work to complete this activation effort would include restriping the existing sports courts, adding synthetic turf, replacement of the existing chain link fence with glass windscreens in select locations to enhance views, installation of a shade structure with retractable fabric, and the addition of restrooms and equipment storage to the recreation area. Hand tools would be utilized for most of the proposed work. The shade structure would require approximately three (3) nonsequential days of crane use to load materials for the shade structure. Placement of the crane would be in a location that does not disrupt public access. Work to complete this portion of the proposed project is anticipated to begin early 2026. Project Element 3: •4th Floor Pool and Fitness Renovations: The existing 4th floor pool and fitness space is located between the Seaport and Harbor towers, and directly above the Seaport and Grand Ballrooms. Work to complete this portion of the proposed project includes resurfacing of the existing deck, installation of new glass balustrades to reduce wind impact, relocation of the existing cabanas and fire pit, new landscaping, service bar, and shade trellis, new pool enclosure fencing, and enhancements to the children’s play area. The existing pool and hot tubs would remain in their current location and receive new plaster, tile, and coping. The fitness center would receive new flooring, vinyl wall covering, and new updated equipment. Work would be completed mainly with hand tools but would require approximately three (3) nonsequential days of crane use to load materials for the shade structure, and approximately three (3) days for concrete pumping equipment. Placement of the crane would be in a location that does not disrupt public access. The pool plaster would be mixed on the deck using portable mixers. This portion of the proposed project would take approximately 6 months to complete and is anticipated to begin summer 2026. •Seaview Renovations: Renovations to this restaurant space would include minor new finishes and improvements to existing equipment. This work would include new carpet, vinyl wall covering, paint, lighting retrofits, and induction tops to increase kitchen efficiency. All work would be completed with hand tools. This portion of the proposed project would take approximately 2-3 months to complete and is anticipated to begin summer 2026. All construction staging required for exterior work included in the above project elements would be located on the basement level of the parking structure and the recreations space. Parking of necessary vehicles would occur at either the nearby ACE or ABM lots. Due to its temporary nature and limited scope, construction of the proposed project would generate a minor number of vehicle trips and would require limited use of equipment, such as limited use of cranes. Minimal truck trips associated with the removal of debris and transportation of materials are anticipated to be generated for this Project. The proposed project would not result in a change in size, capacity, or operations of the hotel facility from that which is currently existing. Therefore, the Project is not anticipated to result in impacts related to air quality, greenhouse gas emissions, and transportation and traffic. Furthermore, the applicant would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Enlisted Unaccompanied Personnel Housing at Eglin AFB, FL
Solicitation # enlisted-unaccompanied-personnel-housing-eglin-afb-fl
The contract solicits the construction of two two-story enlisted unaccompanied personnel housing barracks at Eglin Air Force Base in Florida, each designed to accommodate 120 personnel across 32 individual units. Each unit is equipped with a kitchen, dining area, living area, and laundry room, while the buildings include shared amenities such as lobbies, elevators, entrance vestibules, exercise rooms, day rooms, lounges, and dedicated mechanical, electrical, and communications spaces. The project extends beyond the structures to encompass comprehensive site development, including parking facilities for vehicles and motorcycles, a large open pavilion, basketball and volleyball courts, concrete sidewalks, roadways, grading, storm sewer systems, utilities, landscaping, and related incidental work. All construction activities must comply with a broad range of trade scopes including demolition, sitework, concrete, masonry, steel, millwork, insulation, roofing, waterproofing, doors and hardware, glass and glazing, drywall, flooring, paint, elevators, plumbing, HVAC, fire protection, electrical systems, fencing, asphalt paving, and landscaping. The solicitation is issued by Roy Anderson Corp as the general contractor and is targeted exclusively toward small businesses, with set-asides available for Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business entities. Subcontractors from Minority Business Enterprises, Disadvantaged Business Enterprises, Women’s Business Enterprises, and other certified categories are encouraged to participate. The contract incorporates mandatory equal employment opportunity requirements under Executive Order 11246, Section 503 of the Rehabilitation Act of 1973, and the Vietnam Era Veterans’ Readjustment Assistance Act of 1974, ensuring compliance with affirmative action and non-discrimination standards as defined in 41 CFR 60-4. Proposals must be submitted by Tuesday, August 18, 2026, at 1:00 PM Central Time, with interested bidders required to notify the point of contact, Patrice Lindman, via email or fax to confirm intent to bid. No contract value, pricing structure, period of performance, or bonding requirements are specified in the solicitation materials, and the award will be based on submissions from qualified small business entities meeting the stated technical and compliance criteria.
Roy Anderson Corp

POSTED

about 5 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
RFO AWP-1072, IIJA: ZUA CCF Environmental Wing and Underground Utilities, Hagatna, GU
Solicitation # rfo-awp-1072-iija-zua-ccf-environmental-wing-underground-utilities-hagatna-gu
The contract pertains to the construction of a new Environmental Wing and associated underground utility improvements at a facility in Hagatna, Guam, with a construction value exceeding $10 million. The project includes the demolition of existing structures, comprehensive upgrades to the building’s electrical and HVAC systems, and significant underground utility enhancements. The work is classified under multiple NAICS codes including 236220, 236210, 237990, and 238110, reflecting the broad scope of construction activities involved. This solicitation is set aside for small business concerns including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone, Veteran-Owned, and Service-Disabled Veteran-Owned Small Businesses, as well as Alaskan Native Corporations. Interested firms must respond to the solicitation by the deadline of August 27, 2026, and should contact Anna Ma, Subcontract Administrator at Parsons, via email at anna.t-ctr.ma@faa.gov to express confirmed interest. The solicitation, identified as RFO AWP-1072, IIJA: ZUA CCF Environmental Wing and Underground Utilities, was posted on August 7, 2026, under the PTSI Managed Services, Inc. agency. The project’s location is exclusively in Guam, and all responses must align with the Small Business Administration’s set-aside requirements. No physical office address is listed, and inquiries should be directed through the provided point of contact.
PTSI Managed Services, Inc.

POSTED

about 5 hours ago

DEADLINE

in 19 days
View Details
NAICS: 236220
New
Windsor SECONDARY TREATMENT SYSTEM UPGRADES PROJECT
Solicitation # windsor-secondary-treatment-system-upgrades-project-0
The Windsor Secondary Treatment System Upgrades Project involves a major expansion and modernization of the Water Reclamation Facility’s aeration basin, requiring complete dewatering, extensive excavation, and the construction of a new concrete aeration basin equipped with a flow splitting structure, air lines, diffusers, a mixing system, surface wasting pumps, and a high flow return pump connected to an adjacent storage pond. Parallel to this, a new blower building with integrated blowers and a dedicated electrical control building will be erected, alongside a separate carbon feed building housing chemical storage tanks and metering pumps. Additional scope includes a below grade secondary clarifier weir flow splitting structure and the relocation of an existing concrete sand filter high flow diversion structure. The project is scheduled to span 482 working days with defined intermediate milestones to ensure progress tracking. The project is funded in whole or part through the U.S. Environmental Protection Agency’s WIFIA program, triggering specific compliance requirements under Section 9 of the Special Provisions that contractors and subcontractors must adhere to. Preference is actively encouraged for participation by Disadvantaged Business Enterprises including DBE, DVBE, MBE, WBE, and SBE, aligning with the SBA’s small business set-aside categories such as Small Business, Small Disadvantaged Business, Women-Owned Small Business, and Minority and Women Business Enterprises certified through NMSDC or similar programs. The solicitation was posted on August 7, 2026, with a response deadline of September 3, 2026, and although the pre-bid conference occurred on January 14, 2026, contract documents are accessible online through BuildingConnected and the Town of Windsor’s official bids portal after completing a brief registration form. The contracting entity is C. Overaa & Co., with Anna Stein listed as the primary point of contact for inquiries.
C. Overaa & Co.

POSTED

about 5 hours ago

DEADLINE

in 26 days
View Details
NAICS: 236220
New
Vehicle Maintenance Shop #71 Fort Hood, Texas
Solicitation # vehicle-maintenance-shop-71-fort-hood-texas
Cerris Builders, INC is soliciting bids for the construction of Vehicle Maintenance Shop #71 at Fort Hood, Texas, with a focus on delivering a fully equipped facility to support military vehicle maintenance and operational readiness. The project encompasses a large-scale maintenance facility designed for tactical and organizational vehicles, along with dedicated spaces for UAV storage and maintenance, petroleum and hazardous material handling, and comprehensive storage solutions. The scope further includes critical infrastructure such as fire protection and alarm systems, intrusion detection systems, and an Energy Monitoring Control System to ensure safety, security, and operational efficiency. Supporting site improvements are required, including utilities, storm drainage, paved surfaces, sidewalks, lighting, signage, fencing, and landscaping to complete the site to full operational standards. The solicitation is set aside exclusively for small business concerns, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone, Veteran-Owned, and Service-Disabled Veteran-Owned Small Businesses, reflecting a commitment to fostering diverse contracting opportunities. The response deadline for submissions is August 11, 2026, with Drake Martin serving as the primary point of contact for inquiries.
Cerris Builders, INC

POSTED

about 5 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
SLED
Construction Manager at Risk for New Precinct 4 Maintenance Center
Solicitation # F2027007
Tarrant County is soliciting proposals for a Construction Manager at Risk (CMAR) to oversee the construction of the New Precinct 4 Maintenance Center at 1005 Scotland Avenue in Azle, Texas. The project includes the development of an Administration Building, Maintenance Building, Fleet Building, Covered Storage, Fuel Island, and Covered Parking Areas. The selected CMAR will assume full responsibility for construction execution at the contracted price, acting as the general contractor while also providing advisory services during any project redesign phases. The role requires strict adherence to all applicable laws, regulations, and technical specifications established by the designated design teams, including Parkhill for architecture and engineering disciplines, McAdams for civil engineering, WJHW for audio/video systems, and Datacom Design Group for IT and security systems. Selection will be conducted through a one-step process focused on qualifications and proposed approach. Proposals must be submitted by September 17, 2026, with the solicitation issued under reference number F2027007 and posted on August 7, 2026. Interested parties are encouraged to review all documents available in the “Attachments” tab and attend the designated Pre-Proposal Conference and Site-Walks outlined in the “Activities” tab. The primary point of contact for inquiries is Gwen Peterson, Senior Buyer, reachable via email at gpeterson@tarrantcountytx.gov or by phone at 817-884-1145. The facility is to be constructed in Texas, and all work must comply with local, state, and federal requirements governing public infrastructure projects.
Tarrant County

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
SLED
Rail RFI Engine House Construction
Solicitation # BD-27-1030-0T100-0T281-132125
The Massachusetts Department of Transportation Rail and Transit Division is seeking industry input through a Request for Information to inform the future procurement process for constructing the Hyannis Engine House. This solicitation, identified as BD-27-1030-0T100-0T281-132125, was posted on August 7, 2026, with responses due by August 25, 2026, and is aimed at gathering technical expertise and market feedback from qualified vendors to shape the scope, requirements, and approach of a potential upcoming bid. While no specific set-aside or NAICS code is currently defined, the initiative is classified under state and local government procurement and is managed by the MassDOT Rail and Transit Division based in Boston, Massachusetts. The primary point of contact for this RFI is Monica Auguste, designated as the Purchaser, and all submissions must be directed through the official CommBuy portal linked in the notice. The place of performance for the eventual construction is expected to be in Hyannis, though the agency’s administrative address for this solicitation is listed as Park Plaza in Boston, with a zip code of 02116. This RFI does not constitute a commitment to procure but is a critical step in gathering insights to ensure the future solicitation aligns with current industry capabilities, technologies, and best practices for rail infrastructure development.
0T100 - RAIL AND TRANSIT

POSTED

about 8 hours ago

DEADLINE

in 18 days
View Details
NAICS: 236220
New
Federal
Z1DA--| SOL| NRM| 646-21-101 UD SPS AHU & RO Upgrade Construction (VA-26-00036217)
Solicitation # 36C24426R0139
This is an unrestricted construction solicitation under FAR Subpart 15 for the UD B1 SPS AHU & RO Upgrade project at a Department of Veterans Affairs facility in Pittsburgh, Pennsylvania, with a NAICS code of 236220 and an estimated value between $10 million and $20 million. The scope includes comprehensive architectural and engineering services to upgrade air handling and reverse osmosis systems, overhaul backup power infrastructure, remove ethylene oxide abator equipment, add a second cart wash, separate SPS and SPD operational spaces, install visible and audible alerts, renovate finishes and lighting, reinforce and lower slabs under cart washers, and develop satellite SPS spaces on upper floors. All work must comply with VA Handbook 7610, the VAPHS Master Space Plan, The Joint Commission standards, ANSI/AAMI ST79:2017, AAMI TIR34:2014(R)2017, and ANSI/AAMI ST91:2021 for endoscope processing, while adhering to ADA accessibility requirements. The period of performance is 720 calendar days from receipt of the Notice to Proceed. The contract enforces strict compliance with technical and administrative requirements, including mandatory pre-approval of all equipment and materials by the Government prior to delivery, with all items to be delivered and stored in original sealed manufacturer packaging clearly labeled with OEM name, model, catalog, and serial numbers. Packaging must protect against damage, moisture, dirt, cold, and rain, and specialty items like paints and coatings must include batch numbers, safety instructions, and federal specification numbers. Submittals must follow the exact sequence of the specifications, and offerors must submit a point-by-point compliance statement indicating “DOES NOT COMPLY” or “COMPARABLE” with full descriptions for alternatives; failure to do so will result in disqualification. Payment is governed by FAR 52.232-5, requiring monthly AIA G702 and G703 forms, a satisfactory progress schedule update, and electronic submission via the VAFSC Tungsten Network after CO and COR signature. The contractor must maintain a full-time CQC team on-site and provide a Safety and Occupational Health program aligned with USACE EM 385-1-1 and OSHA regulations, including designated Safety and Health Managers, Site Safety and Health Officers, and specialized Competent Persons for high-risk activities. All personnel require VA pre-approval
244-NETWORK Contract Office 4 (36C244)

POSTED

about 9 hours ago

DEADLINE

in 20 days
View Details