Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Improvements to Interior and Exterior Hotel Spaces and Recreation, Pool and Fitness Areas by Manchester Grand Hyatt

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → San Diego Unified Port District

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

(1)

9-10-25-Project-No-2025-100-KC Environmental Document Filing Fee Receipt and Notice of Exemption

PDFenvironmental-document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Kelly CunninghamAssistant Planner
Dena RoadyGeneral Manager

Full Description

Show more
The proposed project would involve interior and exterior improvements by Manchester Grand Hyatt in the city of San Diego, California. Manchester Grand Hyatt (MGH) (Applicant) is proposing a series of property improvements that are currently scheduled to occur in late 2025 through 2026. The scope of work includes interior club, restaurant, and retail updates and renovations, necessary exterior maintenance and repairs, and improvements to the exterior recreation, pool and fitness areas. Work to specifically complete these various improvements is outlined in further detail below. Project Element 1: •Façade Maintenance & Repairs: These repairs would include removing and replacing caulking at joints and windows, patching the Exterior Insulating Finishing System (EIFS) as necessary, pressure washing the façade, and repainting the exterior of the building. These improvements would take approximately 6-12 months to complete and would require hand tools, pressure washers, and a swing stage for façade access. Work for this portion of the proposed project is anticipated to begin fall 2025. •Top of Hyatt and Grand Club Renovations: Work to specifically complete this component of the proposed project would include, new furniture, fixtures, equipment (FF&E), and finishes including but not limited to, carpet, paint, vinyl wallcoverings, and millwork modification. The proposed work would also include acoustic paneling, retrofit of existing lights, additional sconces, replacement of window shades, installation of new finishes in the existing bathrooms, and adding an electrical circuit in the kitchen for additional cooking equipment. These improvements would take approximately 2-3 months to complete and would utilize hand tools. Work for this portion of the proposed project is scheduled to occur from late 2025 to early 2026. •Market 1 Renovations: Work to complete this portion of the proposed project would involve new finishes including tile flooring, wall tile, millwork, paint, wallcoverings, new lighting layout, and new retail shelving. Work would also include new food service equipment in the front of house service line and additional refrigeration and equipment replacement in the back of house kitchen. This work would require mainly hand tools with minor use of a concrete saw to cut access to allow for plumbing relocation at the service line. This portion of the proposed project would take approximately 4 months to complete and is anticipated to begin fall 2025. Project Element 2: •Recreation Area Renovations: The current recreation space for the Hotel is located on top of the existing parking structure. This portion of the project proposes to further activate the space to allow for improved use of the space. Work to complete this activation effort would include restriping the existing sports courts, adding synthetic turf, replacement of the existing chain link fence with glass windscreens in select locations to enhance views, installation of a shade structure with retractable fabric, and the addition of restrooms and equipment storage to the recreation area. Hand tools would be utilized for most of the proposed work. The shade structure would require approximately three (3) nonsequential days of crane use to load materials for the shade structure. Placement of the crane would be in a location that does not disrupt public access. Work to complete this portion of the proposed project is anticipated to begin early 2026. Project Element 3: •4th Floor Pool and Fitness Renovations: The existing 4th floor pool and fitness space is located between the Seaport and Harbor towers, and directly above the Seaport and Grand Ballrooms. Work to complete this portion of the proposed project includes resurfacing of the existing deck, installation of new glass balustrades to reduce wind impact, relocation of the existing cabanas and fire pit, new landscaping, service bar, and shade trellis, new pool enclosure fencing, and enhancements to the children’s play area. The existing pool and hot tubs would remain in their current location and receive new plaster, tile, and coping. The fitness center would receive new flooring, vinyl wall covering, and new updated equipment. Work would be completed mainly with hand tools but would require approximately three (3) nonsequential days of crane use to load materials for the shade structure, and approximately three (3) days for concrete pumping equipment. Placement of the crane would be in a location that does not disrupt public access. The pool plaster would be mixed on the deck using portable mixers. This portion of the proposed project would take approximately 6 months to complete and is anticipated to begin summer 2026. •Seaview Renovations: Renovations to this restaurant space would include minor new finishes and improvements to existing equipment. This work would include new carpet, vinyl wall covering, paint, lighting retrofits, and induction tops to increase kitchen efficiency. All work would be completed with hand tools. This portion of the proposed project would take approximately 2-3 months to complete and is anticipated to begin summer 2026. All construction staging required for exterior work included in the above project elements would be located on the basement level of the parking structure and the recreations space. Parking of necessary vehicles would occur at either the nearby ACE or ABM lots. Due to its temporary nature and limited scope, construction of the proposed project would generate a minor number of vehicle trips and would require limited use of equipment, such as limited use of cranes. Minimal truck trips associated with the removal of debris and transportation of materials are anticipated to be generated for this Project. The proposed project would not result in a change in size, capacity, or operations of the hotel facility from that which is currently existing. Therefore, the Project is not anticipated to result in impacts related to air quality, greenhouse gas emissions, and transportation and traffic. Furthermore, the applicant would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for Government Furnish, Government Installed equipment, classrooms, debriefing areas, administrative offices, and various support spaces such as electrical, mechanical, and telecommunications rooms. Site work includes the installation of sidewalks and landscaping while utilizing existing parking areas. The project is issued as a task order under the National Multiple Award Construction Contract III, Pool Two, with an estimated contract value of approximately 16 million dollars and a period of performance of 719 calendar days from award. The procurement utilizes a best-value tradeoff selection process, weighing price against non-price factors including planning, organization, communication, and the proposed construction approach. Technical requirements specify the use of Siemens Building Automation Systems for installation-wide compatibility and adherence to UFC 4-010-06 cybersecurity standards. All on-site personnel must be US citizens, and security clearance is managed via RAPIDGate. The project is subject to Davis-Bacon Act wage determinations for building and heavy construction in Pasquotank County. Quality control is mandated per FAR 52.246-12, with specific ASTM standards required for the testing of concrete, soil, and structural steel.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Both structures will feature shallow foundations, structural steel framing, standing-seam roofs, and a combination of masonry and metal panel exterior walls. The scope of work is extensive, covering everything from demolition of an existing engineering facility to comprehensive site improvements, including stormwater retention, utilities, landscaping, and parking. Bids are requested across numerous trades, including concrete, masonry, electrical, mechanical, plumbing, and structural steel. The project adheres to Davis Bacon Wage Rates and is exempt from sales tax. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and project documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 11 hours ago

DEADLINE

in 2 months
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. is for the construction of the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base New London in Groton, Connecticut. The project involves a comprehensive scope of work over 1828 calendar days, including the construction of six Containerized Long Weapons Storage units and three earth-covered high-explosive magazines equipped with overhead cranes. Additional structures include a new Ordnance Operations building, a Truck Inspection area, and a Sentry building. The project also requires the demolition of 18 existing magazines and two specific buildings, along with extensive site preparation involving rock excavation, grading, and wetland mitigation. Technical requirements include specialized foundation features such as rigid inclusions and load transfer mats, as well as the installation of grounding, lightning protection, and intrusion detection systems. The scope covers a wide array of trades, including structural steel, electrical utilities, plumbing, mechanical systems, and paving for access roads and loading areas. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must respond by October 31, 2026, and should contact Rahul Maheshwari for bid invitations and documentation.
J & J Contractors, Inc

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS