Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Increase Guaranteed Maximum Price

Active
GS-04P-09-EX-C-0077-PS03Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract modification pertains to an increase in the guaranteed maximum price (GMP) by $1,114,216 for a firm, fixed-price contract originally awarded under solicitation number GS-04P-09-EX-C-0077. The contract supports the modernization of the Robert Smith Vance Federal Building and U.S. Courthouse in Birmingham, Alabama, as part of the American Recovery and Reinvestment Act (ARRA) of 2009, which aims to stimulate job creation and economic recovery. The modernization efforts focus on reducing energy consumption, enhancing environmental performance, improving stormwater management, and promoting occupant health and productivity, while maintaining affordability over the long term. Because the design was not finalized when the original contract was awarded, this GMP contract allows for adjustments as the design and scope evolve, necessitating this increase in funds to cover expanded modernization requirements. The General Services Administration (GSA), through its Acquisition Management Division in Atlanta, Georgia, oversees this contract, with Christopher D. Banks serving as the point of contact. The initial contract flexibility was intended to accommodate uncertainties and refinements during the design phase. The increased GMP reflects necessary changes to the scope of work to fully support the building’s planned modernization. This type of contract reinforces ongoing negotiation and adaptation to design advancements, ensuring the project can meet its key goals of sustainability, efficiency, and economic impact within the framework of ARRA funding and federal procurement regulations.

General Info

GMP increased by $1,114,216 for modernization of Robert Smith Vance Federal Building under ARRA.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Robert Vance Federal Building and Courthouse 1800 5th Ave North, Birminham, AL, 35203, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R4 (amd) Acquisition Management Division
Contacts1 person available
OfficeATLANTA, GA, 30303, USA
Office AddressATLANTA, GA, 30303, USA
Contacts

Full Description

Show more
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO THE CONTRACTOR UNDER THE CURRENT CONTRACT NUMBER GS-04P-09-EX-C-0077. This modification is to increase ARRA funding on the firm, fixed-price Guaranteed Maximum Price (GMP) contract in the amount of $1,114,216. This Contract Award was posted to FBO on July 28, 2009. The American Recovery and Reinvestment Act of 2009 was created to preserve and create jobs and promote economic recovery. The Robert Smith Vance Federal Building and U. S. Courthouse has been selected in support of this Recovery Plan. The Modernization of the Robert Smith Vance Federal Building seeks to lower energy usage, improve environmental performance, increase on-site storm water management, improve indoor environmental quality, occupant health and productivity, maximize energy efficiency and cost savings while strengthening the local economy and keeping this building affordable in the long term. In an effort to achieve these goals, the original GMP solicitation strived to anticipate and accommodate all aspects of the Modernization efforts. The award was designed to permit ongoing discussions and negotiations throughout the development of the design and specifications. Inherent in this type of contract are numerous uncertainties that do not permit costs to be estimated with sufficient accuracy. At the time of solicitation and award, the design had not yet commenced. The award of a GMP contract, without a design in place, was anticipated to be adjusted to reflect conditions that may occur after refinement of the design. Such a living award document is necessary during the refinement of the scope of work. It has now been determined that the Statement of Work requires further development in obtaining the modernization of the Robert Smith Vance FB & CH. Consequently, the scope is hereby increased to support the Modernization efforts and an increase in the GMP is a fundamental component of this undertaking. As such, the GMP is hereby modified in the amount of $1,114,216.00.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 7 hours ago

DEADLINE

in 13 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of the plant featuring a packaged Membrane Bioreactor, headworks, UV disinfection, SCADA systems, and various support buildings; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension and a second sludge handling unit. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and agree to the Overaa standard agreement without modification. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Performance and labor bonds for 100 percent of the subcontract price may be required, and all subcontractors must provide a waiver of subrogation endorsement for workers compensation insurance.
C. Overaa & Co.

POSTED

about 7 hours ago

DEADLINE

in 19 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS