Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on June 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

INDEFINITE DELIVERY CONTRACT (IDC) FOR ARCHITECT-ENGINEER (AE) SERVICES FOR OMAHA DISTRICT, US ARMY CORPS OF ENGINEERS

Closed
W9128F25RA067Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 CPRG NCD SOQ
Solicitation # 2026-SOQ-004
The City of Rogers is soliciting Statements of Qualifications (SOQ) under solicitation number 2026-SOQ-004 for Natural Channel Design services to restore approximately 4,200 linear feet of stream in an urban setting. The scope of work includes engineering, plan design, hydrologic and hydraulic modeling, and the procurement of all necessary local, state, and federal regulatory permits, including potential Letter of Map Revision submissions to FEMA. This project is funded by the Climate Pollution Reduction Grant (CPRG) subaward CPRG-NWA-001 and EPA award 02F75801, requiring compliance with EPA nondiscrimination regulations, Title VI of the Civil Rights Act of 1964, and 40 CFR Parts 5 and 7. Key milestones include the completion and approval of construction plans and permit applications by May 1, 2027, with final construction completion targeted for December 31, 2027. Selection is based on a ranking of qualifications rather than price, with the highest-ranked firm invited to negotiate a contract. Evaluation criteria focus on professional staff expertise, past performance, understanding of the scope, and the quality of the work plan. Interested firms must submit a PDF via OpenGov or hard copy to Colt Craig by November 10, 2026. Submissions are limited to 25 pages and must include Standard Form 330 Part II, an Equal Employment Opportunity policy, the Arkansas DFA Illegal Immigrant Contractor Disclosure Form, and EPA certifications regarding debarment and lobbying for contracts exceeding 100,000 dollars. Additionally, firms must maintain active registration in SAM.gov and demonstrate a commitment to DBE goals through six good faith efforts in subcontracting per 40 CFR 33.301.
Community Development

POSTED

about 4 hours ago

DEADLINE

in 12 days
NAICS: 541330
New
International
Pump Optimisation and Aeration Efficiency Analysis
Solicitation # FA2253
Thames Water Utilities Limited is establishing a single-lot, sole-supplier framework agreement under solicitation FA2253 for pump optimisation and aeration efficiency services. The contract focuses on the monitoring, testing, and analysis of pumping and aeration systems across approximately 60 operational sites, encompassing roughly 200 tests during the AMP period. The primary objective is to reduce whole-life costs and improve operational performance through a structured delivery model that includes site identification, efficiency studies, and performance monitoring. The agreement will feature fixed pricing structures based on an agreed rate card and will be managed through key performance indicators to ensure strategic partnership and continuous improvement. The contract is scheduled for an initial three-year term starting May 10, 2027, with potential extensions up to a maximum of eight years, ending May 9, 2035. Eligible suppliers must demonstrate a proven track record of delivering measurable savings and innovation and must have the capacity to operate within London, the Thames Valley, and the Home Counties. Award selection is based on a 50% technical and 50% commercial weighting. The procurement process is a multi-stage procedure requiring a Pre-Selection Questionnaire via SAP Ariba by October 19, 2026, followed by an Invitation to Negotiate stage. Successful providers must also meet stringent insurance requirements, including 15 million pounds for public and products liability and 10 million pounds for professional indemnity.
Thames Water Utilities Limited

POSTED

about 4 hours ago

DEADLINE

N/A

General Info

NAICS

541330 - Engineering Services

Place of Performance

Omaha, NE, 68102, USA

Set-Aside

SBA

Documents

2

Announcement W9128F25RA067 - IDC for AE Services for Omaha District, USACE

DOCX, High priority: read this first8 pages · presolicitation
High

Q&A for Synopsis W9128F25RA067 (Updated 26 Jun 2025)

PDF, Low priorityq-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

9 updates
PhaseClosed
Posted

special-notice

Notice updated

Notice type changed from Special Notice to Contract Update. The notice description changed.

Notice updated

Notice type changed from Contract Update to Special Notice. The notice description changed.

Notice updated

Notice type changed from Special Notice to Contract Update. The notice description changed.

Notice updated

Notice type changed from Contract Update to Special Notice. The notice description changed.

Notice updated

Notice type changed from Special Notice to Contract Update. The notice description changed.

Notice updated

Notice type changed from Contract Update to Special Notice. The notice description changed. The point of contact changed.

Notice updated

Notice type changed from Special Notice to Contract Update. The notice description changed.

Notice updated

Notice type changed from Contract Update to Special Notice. The notice description changed.

Notice updated

Notice type changed from Special Notice to Contract Update. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts2 people available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
Contacts
Nadine Catania

Full Description

Show more
**Updated Questions and Answers document dated 26 June 2025 has replaced the previous Q&A document in the attachments section below.** **Updated Questions and Answers document dated 24 June 2025 has replaced the previous Q&A document in the attachments section below.** **Updated Questions and Answers document has replaced the previous Q&A document in the attachments section below.** **Questions and Answers document has been added to the attachments section below.** ANNOUNCEMENT W9128F25RA067 FOR INDEFINITE DELIVERY CONTRACT (IDC) FOR ARCHITECT-ENGINEER (AE) SERVICES FOR OMAHA DISTRICT, US ARMY CORPS OF ENGINEERS 1. CONTRACT INFORMATION: This contract is being procured in accordance with the Brooks A-E Act as implemented in FAR Subpart 36.6. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work. The services will consist of preparation of studies, analysis, and design services for Military and Civil works projects for the Omaha District (NWO) within the Northwestern Division (NWD), U.S. Army Corps of Engineers (USACE). One (1) Indefinite Delivery/Indefinite Quantity (ID/IQ) will be negotiated and awarded, with a base ordering period of five (5) years and $7M in capacity. Work will be issued by negotiated firm-fixed-price task orders. Task orders will be issued from time to time as the need arises during the contract period. The amount of the task orders will not exceed the total contract amount. When two (2) or more indefinite delivery contracts (IDCs) are available to the procuring agency and contain the same or overlapping scopes of work so that a particular task order might be issued under more than one IDC, the contracting officer will consider the following factors in deciding which contractor will be selected to negotiate a task order: performance and quality of deliverables under the current contract, current capacity to accomplish the order in the required time, uniquely specialized experience, and equitable distribution of work among the contractors. The North American Industrial Classification System code is 541330, which has a size standard of $25,500,000 in annual average gross receipts over the past three (3) years. Competition for this procurement is restricted to small business concerns. This solicitation is a Small Business set-aside only, any submittals received from a large business will not be evaluated. The selected and successful firm will be required to comply with the subcontracting limitations as set forth by the FAR Clause 52.219-14 LIMITATIONS ON SUBCONTRACTING, wherein stated in pertinent part, "Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern." Contract award is anticipated between February 2026 and April 2026. To be eligible for contract award, the Contractor must be registered in the System for Award Management (SAM). Registration is free and can be accessed at: http://www.sam.gov. 2. PROJECT INFORMATION: All projects will be located within the USACE, Northwest Division, with majority of the projects located within the boundaries of the Omaha District. Each task order to be issued will fully describe the project to be designed or the studies to be accomplished and will identify all work to be accomplished. TYPES OF SERVICES Types of services will include a broad range of USACE products prepared for water resource project design and analysis. Services will require the use of industry standard and specialized computer programs, design and analysis for USACE planning and operation projects, report writing, site visits, project reconnaissance, and data collection including hydrographic and land surveys, water quality, and sediment sampling. Types of engineering services are further defined as: a. Hydrologic computations for planning and design of flood control and channel restoration projects to include risk assessment, alternative evaluation, channel improvements, geomorphic analysis, detention ponds, levees, floodwalls, and nonstructural measures or combination of the same. Prepare conceptual construction quantity estimates for comparison purposes and budgeting and programming requirements. b. Hydrologic design and analysis of watersheds for both rainfall and snowmelt using computer software programs including HEC-HMS and similar for short-term and long-term simulation; flood risk reduction projects; real-time flood forecasting; dam safety including inflow design flood and stage frequency of extreme events; wetland mitigation basins; design and analysis of interior drainage facilities for flood protection projects including coincident probability assessment; flood warning systems. c. River modeling / floodplain analysis of existing baseline conditions and design alternatives with applicable models for one-dimensional (HEC-2, HEC-RAS v.6.x, or similar) and two-dimensional (HEC-RAS v.6.x and 2025, RMA-2, ADH, or similar) evaluations with steady/unsteady flow and sediment transport. d. Floodplain analysis using applicable computer software programs, including floodway computations, floodplain delineation of water surface profiles, CLOMR/LOMR development and processing, digital mapping, and similar products according to Federal Emergency Management Agency (FEMA) criteria in support of the National Flood Insurance Program (NFIP). e. Reservoir area-capacity analysis, reservoir aggradation/degradation assessments, deposition patterns, future sedimentation rate estimates. Sediment yield analysis and detention \ reservoir sizing. f. Hydrographic and land surveys using Global Positioning System (GPS) or other electronic positioning systems (both multi-beam and single beam, and side scan sonar). Sediment and water quality sampling. g. River sediment transport analysis and alluvial geomorphology evaluations including sediment transport modeling, stream bank and streambed erosion assessments, river stage trend analysis, specific gage analysis, and aerial photo analysis. h. Design of hydraulic structures and project features including stilling basins, spillways, chutes, outlet works, culverts, drop structures, energy dissipation structures for same, and riprap design for energy dissipation and bank protection. i. Statistical analysis of stream flow records to develop discharge-frequency relationships, flow duration characteristics and volume-probability relationships for various hydrologic conditions including regulated-unregulated conditions and mixed population analysis Monte Carlo simulation. j. Reservoir analysis and operation using programs including HEC-RESSIM. k. Groundwater assessments and trend analysis. l. Wind and wave analysis. m. Preparation of reservoir operation manuals and water resources studies. This will include alternative development and analysis, and development of decision support documents. n. Preparation of dam failure contingency plans and flood inundation mapping. o. Statistical analysis of meteorological data including precipitation frequency and determination of probable maximum precipitation. p. Surface water supply and reservoir reallocation analysis. q. Qualitative and quantitative hydraulic uncertainties. r. Lake/stream water quality modeling using approved computer software programs. s. Risk and uncertainty analysis of water resource projects using methods such as HEC-FDA. t. Related computer services, programming and data preparation. Professional qualifications and specialized experience shall be required for the following team members to successfully support the services listed above: Hydraulic Engineering Project Management Hydrology Water Resources Sedimentation Water Quality Hydrographic Surveying General Civil Engineering GIS CADD 3. SELECTION CRITERIA: The selection criteria for this particular project are listed below in descending order of importance. Criteria - a through - e are primary. Criteria - f through - h are secondary and will only be used as a tie- breaker among firms that are essentially technically equal. a. Specialized Experience and technical competence. b. Professional Qualifications c. Past Performance d. Capacity e. Knowledge of Locality f. SB/SDB Participation g. Geographic Proximity h. Volume of DoD Contract Awards PRIMARY SELECTION CRITERIA a. Specialized experience and technical competence The specialized experience and technical competence of the firm and consultants in the work categories listed above in Section 2. Submittals shall demonstrate the specialized experience and technical competence, and if any experts were utilized to execute the projects listed above in Section 2. Only relatable experience on completed projects from the last five (5) years should be included in the submittal. The firm shall include no more than 10 previous projects in this submittal and be no more than two (2) pages per project. All projects cited shall identify start/complete dates as well as the project size (scope and scope) (SF 330, Part I, Section F). Firms should provide examples of successfully completed work that encompass the list below (we are looking for strong examples of the following work that help illustrate the level of complexity your firm(s) are capable of accomplishing): i. Experience in Hydrologic Engineering and Related Water Resource Services Demonstrate experience and past performance for hydrologic analysis of typical USACE engineering analysis, design, and planning projects conducted in water resources; flood damage reduction; hydraulic structures; hydrology; floodplain analysis and delineation; sediment processes. More favorable scoring given for use of in-house staff, longer experience levels, and higher total task order value. ii. Engineering Software and Hardware Demonstrate a high level of competency using hydrologic engineering analysis software and associated hardware with typical USACE project analysis software that includes the use of the HEC suite of programs including; steady\unsteady, multi-dimension computer models and sediment transport: typical USACE project analysis software includes: HEC-RAS, HEC-HMS, HEC-FDA, HEC-WAT, SAM, DSSVue, HEC-SSP, SWAT, CEQUAL-W2, SMS with ADH and similar; GIS programs including MicroStation, Inroads, AutoCAD, and ArcGIS; legacy water resources programs HEC-1, HEC-2, HEC-6, HEC-5, DAMBRK, UNET. Hardware: demonstrate sufficient computer hardware capability for program use (both speed and memory). More favorable scoring given for demonstration of a broad range of software competency, use of in-house staff, longer experience levels, possession of equipment, and higher total task order value. iii. Hydrographic Surveying Demonstrate either in-house or subcontractor capability to conduct surveys on both lakes and rivers. Preference will be given to owning plant over renting plant. Project experience in excess of five (5) years performing: 1) multi-beam and single beam hydrographic surveys; 2) Acoustic Doppler Current Profiler (ADCP); 3) land-based surveying using GPS equipment, or remote sensing (e.g. fixed wing based LiDAR) for waters edge, banks, structures, etc. 4) all appropriate software, positioning equipment, and etc. Demonstrate possession of watercraft capable of safely operating in waves up to 3-feet and/or in riverine environments. More favorable scoring given for a broad range of competency, use of in-house staff, longer experience levels, possession of equipment, and higher total task order value. iv. Water Quality Sampling Demonstrate experience through in-house or subcontractor staff possession and use of sampling equipment: 1) electronic logging of measurements at depths up to 100 meters for water temperature, dissolved oxygen, pH, conductivity, turbidity, oxidation-reduction potential (ORP) and chlorophyll a; 2) collection of representative water quality samples from discrete depths up to 100 meters; 3) determination of Secchi depth; 4) collection of representative phytoplankton, zooplankton, and benthic invertebrate samples; 5) collection of sediment samples to a depth of 10- feet for physicochemical analysis. Demonstrate possession of watercraft capable of safely operating in waves up to 3-feet and/or in riverine environments. Demonstrate use of a Quality Management Plan and Standard Operating Procedures for all water-quality sampling operations that meets U.S. Environmental Protection Agency - QA/QC requirements for the collection of water quality samples for environmental assessment. More favorable scoring given for a broad range of competency, use of in-house staff, longer experience levels, possession of equipment, and higher total task order value. b. Professional qualifications The professional qualifications of the proposed team members (including subcontractors) shall provide specialized experience in relevant water resource development planning services. Key services that may be required to be performed by professionals holding current appropriate licensure or certification are: civil, structural, hydrologic, hydraulic, electrical, mechanical, environmental, and geotechnical engineers. Preference will be given to firms that submit resumes demonstrating highly qualified personnel for the discipline related to the requirements of this solicitation and listed above in Section 2. Evaluation of these disciplines will consider education, training, relevant experience in water resource planning services similar to those listed in the work categories above, and longevity with the firm. Resumes should not exceed one page in length. (SF 330, Part I, Sections E, F, and G). This selection criterion is primarily concerned with the qualifications of the key project managers and senior technical experts (not organization management) and not the number of personnel, which is addressed under the capacity criterion. This criterion is also specifically concerned with staff that the firm expects to perform work awarded under this contract. Provide the organization chart/table, (both Prime and Subcontractor firms), summary of duties for minimum project personnel, and resumes for the following labor categories: minimum of two (2) Project Managers, both registered as a Professional Engineer or Architect Professional Engineer(s) in each of the following fields with professional registration: minimum of three (3) Hydrology minimum of three (3) Flood Plain Hydraulics minimum of one (1) Design of Hydraulic Structures minimum of one (1) Sediment Transport minimum of one (1) Hydrologic Data Collector minimum of one (1) Water Quality Expert minimum of one (1) Staff engineer *Note: Resumes are not required for additional personnel indicated in organization chart.* Preference given for 1) experience on USACE water resource projects; 2) years of experience; 3) experience on large river systems; and 4) non-duplicate use of personnel for resumes for the labor categories listed above. c. Past performance Contractors past performance shall demonstrate that Projects were completed on time, within budget, and considered outstanding/exceptional by the customer. More favorable scoring given for use of in- house staff, longer experience levels, possession of equipment, and higher total order value on DoD and other relevant contracts as determined by Contractor Performance Assessment Reporting System (CPARS) and other sources. This criterion will focus on evaluation of overall ratings. Note: Past Performance Questionnaires (PPQ) may also be submitted to provide or supplement a firm's past performance with DoD or other than U.S. Governmental clients. Past Performance submittals should match projects submitted for Paragraph a. Specialized Experience and Technical Competence. d. Capacity to accomplish work. Capacity is the ability to complete task orders within a reasonable (potentially aggressive) schedule and the availability of an adequate number of personnel in the key disciplines to meet required schedules of multiple, simultaneous task orders. Firms shall demonstrate the capacity to accomplish at least four (4) $200,000 simultaneous individual task orders, or two (2) $500,000 simultaneous task orders. The evaluation will consider the experience of the firm and any subcontractors in similarly sized projects, and adequate number of personnel in key disciplines identified above in section b. A management plan shall be presented that includes an organization chart and addresses team organization, any anticipated sub-contractors or entities to supplement the team, quality control procedures, explanation of the ability to complete multiple simultaneous task orders and/ or task orders within a reasonably aggressive schedule, cost control, coordination of in-house disciplines and consultants. The management plan shall clearly showcase how at a minimum 50% of the workload will be accomplished by the Prime Contractor and Small Business Firms in accordance with FAR 52.219-6, Notice of Total Small Business Set-Aside. The SF 330 shall clearly indicate the primary office where the work will be performed and the staffing at this office. The management plan shall be organized into the following sections: (a) Quality Control Procedures, (b) Subcontractor Management Plan, (c) Schedule Development and Maintenance (including completion of multiple simulations task orders), (d) Change Management Plan (address risks to schedule, budget, staff turnover, etc.), (e) Communication Plan (internal communication and communication with the USACE), and (f) Current Active Contracts. The evaluation will consider the key persons identified in Sections D, E, and G of the SF330, as well as other available staff and information provided in Section H and Part II (SF 330, Part I, Section H). Knowledge of Locality. Submittals shall demonstrate knowledge of performing the type of projects and activities as described in the PROJECT INFORMATION section listed above for the Northwestern Division of the USACE with particular emphasis on the Omaha District's Missouri River watershed and its tributaries. More favorable scoring given for higher task order value on USACE projects completed with in-house staff within Omaha District. SECONDARY SELECTION CRITERIA a. SB & SDB Participation - Small Businesses will be evaluated on the extent of participation of small business community (SBC) members in the performance of the acquisition. Offerors shall propose their best efforts when projecting the level of participation of Small Businesses. b. Geographic Proximity Submittal shall address offeror's geographic locations and their capability to address project work through the Northwestern Division of the USACE with particular emphasis on the Omaha District's Missouri River watershed and its tributaries. c. Volume of DOD A-E contract awards. The volume of DOD A-E contract awards in the last 12 months, with the objective of effecting an equitable distribution of DoD A-E contracts among qualified firms, including SB and SDB. When IDCs are involved, this selection criterion will consider the total value of task orders actually issued by agencies in the last 12 months, not the potential value of the contracts nor will it consider options that have not yet been exercised on any type of contract. (SF 330, Part I, Section H, Item 4) 4. SUBMISSION REQUIREMENTS: Interested firms having the capabilities to perform this work must submit one (1) electronic copy of SF 330 Part I, and (1) copy of SF 330 Part II for the prime firm and all consultants/subcontractors. The SF 330 and all supporting documentation shall be submitted electronically in a single searchable PDF file. The submittal shall have a page limit of 75 pages and SF 330 Part II and Past Performance submittals do not count towards the 75 page limit. A page is one (1) side of a sheet. Blank sheets/Tabs separating the sections within the SF 330 will not count against the maximum page count. All fonts shall be at least 10 font or larger. Pages shall be 8-1/2 inches by 11 inches. Organizational charts may be presented on a sheet up to 11 inches by 17 inches. Cover letters, company literature, other extraneous materials are not desired and content beyond 75 pages will not be considered during the evaluation. Part I of the SF330, interested firms must include UEI number and CAGE code in SF 330 Part I, Section B, Block 5. Additionally, the UEI number and CAGE code should be identified in SF 330 Part I, Section C, Block 9, for EACH TEAM MEMBER. Sections E and G of SF 330 Part I must include only individuals anticipated to perform the work, including all consultants/subcontractors. In SF 330 Part I, Section G, Block 26, along with the name, include the firm with which the person is associated. A maximum of 10 projects including the prime and consultants/subcontractors will be reviewed for SF 330 Part I, Section F. Use no more than two (2) pages per project and no more than one (1) page per resume. When listing projects in SF 330 Part 1, a task order executed under an IDIQ contract is considered a project; an overall IDIQ with multiple task orders is not considered a project. A Part II of the SF 330 is required for each branch office of the prime firm and any consultants/subcontractors that will have a key role in the proposed contract (i.e. a Part II is required for all entities identified in SF 330 Part I, Section C of the submittal). Joint Ventures (JV) shall submit the following additional documentation of the evidence of a joint venture entity: 1) Firms shall provide a copy of a legally binding joint venture agreement, and 2) Identification of the party who can legally bind the joint venture. Facsimile submissions will not be accepted. Send electronic submission to: Karen L. Caskey, Contract Specialist contact@example.gov. Submissions should be clearly labeled with Solicitation Number W9128F25RA067, Hydrologic Engineering Services A-E IDIQ and are due no later than 2:00pm Central Time, 27 June 2025. Regulation requires that the Selection Board not consider any submittals received after the specified time and date. Late proposal rules in FAR 15.208 will be followed for submittals received after 2:00pm Central time on the closing date specified in this announcement. The SF 330, 07/2021 edition, must be used, and may be obtained from the following web site: https://www.gsa.gov/forms. Personal visits for the purpose of discussing this announcement will not be scheduled. Please check for updates to this announcement at www.sam.gov (SAM). Contracting Office Address: Attn: CENWO- CT 1616 Capitol Ave Omaha, Nebraska 68102-4901 United States Primary Point of Contact: Karen L. Caskey Contract Specialist contact@example.gov Phone: +1 (555) 000-0000 Technical Point of Contact: Kelsey Smith Design Manager contact@example.gov Phone: +1 (555) 000-0000 This synopsis is attached as a word document for your convenience.

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 541990
New
Federal
Fort Campbell, KY - API 653 External Tank Inspection
Solicitation # W9128F27QA006
Solicitation W9128F27QA006 is a total small business set-aside for API 653 external above-ground storage tank inspections at Fort Campbell, Kentucky. The project focuses on facilities G7140 and H7140 and is structured as a firm-fixed-price contract with a final delivery deadline of March 20, 2027. The scope of work requires a certified API 653 inspector to conduct external inspections, visual assessments of containment areas, and verification of alarms and Automatic Tank Gauge equipment. Deliverables include a teleconference kick-off meeting, completed API Std 653 checklists, and the submission of draft and final reports that identify any appurtenances not complying with DoD Standard AW 78-24-27. The government will award the contract to the responsible offeror deemed most advantageous based on technical capability, experience, and price reasonableness. Proposals must be submitted as a single PDF not exceeding five pages, excluding the cover page, price worksheet, and certifications. Required submission materials include the inspector's certification, a one-page resume, and past performance references. Due to the work being performed on a closed military installation, all personnel must undergo identity proofing and vetting unless they possess a current government security clearance. Quotes must be submitted electronically to Contracting Specialist Tony Manna and Contracting Officer Brent Bertrand by the response deadline of November 13, 2026.
All Other Professional, Scientific, and Technical Services

POSTED

about 7 hours ago

DEADLINE

in 15 days
View Details
NAICS: 541330
New
Federal
USACE Omaha District - $249M Unrestricted Sentinel Construction Management Services (CMS) MATOC
Solicitation # W9128F26RA124
The USACE Omaha District is soliciting proposals for the Sentinel Construction Management Services (CMS) Multiple Award Task Order Contract (MATOC) under NAICS 541330. This unrestricted effort has a total estimated capacity of 249 million dollars, with the government intending to award four firm-fixed price Indefinite Delivery Contracts (IDCs). The contract supports the U.S. Air Force across the Northwestern Division, covering 15 states including Washington, Oregon, Idaho, Nevada, Utah, Montana, Wyoming, Colorado, North Dakota, South Dakota, Nebraska, Kansas, Iowa, Missouri, Minnesota, and Wisconsin. The performance period consists of a five-year base period with options extending the total duration up to seven years and six months. The scope of work involves providing professional, administrative, and management staff augmentation to oversee construction projects. Key responsibilities include performing Quality Assurance inspections per ER 1180-1-6, monitoring safety compliance according to EM 385-1-1, and managing project documentation through the Resident Management System or Construction Management Platform. Awards will be based on a best-value tradeoff process evaluating past performance, technical and management approach, key personnel resumes, small business participation, and cost. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) by November 10, 2026.
Engineering Services

POSTED

2 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2 project is a construction effort located along the left descending bank of Lake Sharpe near Big Bend, South Dakota. Managed by the USACE Omaha District, the project focuses on Reach 4 of the lake and involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and a 200-by-1,500-foot island in water up to three feet deep. Key technical requirements include the installation of a riprap revetment to protect against erosion and the planting of cottonwood trees and other culturally significant vegetation. These efforts are designed to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland through tasks such as earth moving, grading, bank shaping, and topsoil placement. This procurement is a 100 percent Small Business Set-Aside under NAICS code 237990, with an estimated construction value between 10 million and 25 million dollars. The project is being solicited as a single-step sealed bidding process via an Invitation for Bid, with a required period of performance of 550 days following the Notice to Proceed. Bidders must be registered in the System for Award Management and submit their offers through the PIEE Solicitation Module. Additional requirements include the provision of performance and payment bonds and adherence to South Dakota Heavy and Highway wage determinations, with a specific note regarding a 4.5 percent Tribal Employment Rights Ordinance tax.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541990
New
Federal
Vandenberg SFB Tank Inspection
Solicitation # W9128F27QA002
Solicitation W9128F27QA002 is a firm-fixed-price, non-personnel services contract for the inspection of Department of Defense fuel tanks at Vandenberg SFB, California. This 100 percent Service-Disabled Veteran-Owned Small Business set-aside under NAICS 541990 requires the contractor to perform API 653 internal inspections on aboveground storage tanks, specifically focusing on Tank 1702, a welded steel vertical Jet A storage tank. The scope of work includes fuel removal, disposal, tank cleaning, and the replacement of wiper seals. Contractors must provide a certified API 653 inspector and a project manager to ensure compliance with API 650, API 653, NFPA 30, and various Unified Facilities Criteria and military standards. The government will award the contract based on best value, evaluating technical capability, relevant experience in fuel tank draining and cleaning, and price reasonableness. Proposals are limited to five pages and must be submitted electronically by November 13, 2026. Key deliverables include draft and final inspection reports featuring non-destructive testing summaries, engineering calculations, and categorized repair recommendations. Due to the location on a military installation, all personnel must adhere to strict security vetting and base access requirements. The contract also includes an option for the removal and disposal of excess fuel up to 2,000 gallons per purchase order.
All Other Professional, Scientific, and Technical Services

POSTED

3 days ago

DEADLINE

in 15 days
View Details
NAICS: 237120
New
Federal
Mather Fueling System Repairs
Solicitation # PANNWD26P028176
The Mather Fueling System Repairs project, solicitation W9128F27RA045, is a design-build effort located at the Mather Army Aviation Support Facility in California. Managed by the USACE Omaha District, this firm-fixed-price contract is restricted as a total Small Business Set-Aside. The scope of work involves comprehensive repairs and upgrades to the AVGAS fueling system, including the installation of a sampling gauge hatch, a mechanical gauge, and an automatic tank gauge system. Physical improvements include recoating the tank exterior, replacing collision barriers, adding a full-length catwalk, and replacing audible and visual alarms. Additional requirements include repairing the remote containment basin drainage, replacing asphalt and concrete pavement in multiple areas, relocating a generator with a new concrete pad, and the demolition and replacement of the POL operation building. The project will be awarded using the Lowest Price Technically Acceptable (LPTA) method, with technical evaluations focusing on project experience—requiring three examples of projects exceeding 1 million dollars—and a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases. The projected period of performance is 365 days. Contractors must comply with the Davis-Bacon Act for prevailing wages and adhere to strict quality control standards, including a three-phase control process and final acceptance through punch-out, pre-final, and final inspections. Required deliverables include as-built drawings, and the contractor must provide performance and payment bonds within 10 days of award. Optional CLINs are included for the remediation of petroleum-contaminated soil, lead-based paint, and asbestos-containing materials.
Oil and Gas Pipeline and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS