This Solicitation opportunity from Florida was posted on August 25, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Indrio Road 6" Water Main and 4" Force Main Extension
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The project involves connecting to a newly constructed 16-inch water main along the south side of Indrio Road, approximately 1,400 feet east of the Emerson Avenue intersection, by installing around 85 feet of 6-inch PVC water main, 1,205 feet of 8-inch HDPE directional bore, and associated valves, hydrants, and fittings. Additionally, it includes a force main connection to a 12-inch force main in the same vicinity, with about 75 feet of 4-inch PVC force main and 1,195 feet of 6-inch HDPE directional bore, along with necessary appurtenances. The primary goal is to enhance potable water supply and wastewater collection for residential and commercial properties in the area. Construction activities encompass utility exploration, permitting coordination, trenching, dewatering, soil compaction, testing, traffic control, and other essential tasks to ensure the system’s operational readiness, adhering to standards set by FDEP, FDOT, and St. Lucie County. The project is valued between $500,000 and $1,000,000, with a solicitation posted on August 25, 2024, and a response deadline of September 25, 2024. It aims to improve infrastructure reliability and service delivery within the specified region of Florida.
General Info
Agency
Place of Performance
FL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
This project proposes (1) force main connection to the recently-constructed 12” force main along the south side of Indrio Road approximately 1,400 lineal feet east of the Emerson Avenue intersection. Project proposes approximately 75 lineal feet of 4-Inch PVC force main, 1,195 lineal feet of 6" HDPE directional bores, and associated gate valves, service laterals, fittings and necessary appurtenances along the south side of Indrio Road.
Project will provide potable water supply and domestic wastewater collection/transmission to residential and commercial properties located in the project area.
Construction consists of, but not limited to: utilities exploration; coordination with any permitting agencies; trenching; dewatering; restrainers; soil compaction; testing; traffic control; and necessary items to result in an operational system as required by FDEP, FDOT, and St. Lucie County, Regulations. All construction and material shall be per St. Lucie County Latest Standards.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
