Industrial Electrical Systems (Building & Distribution)

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Industrial Electrical Systems focuses on the installation of low and medium voltage power distribution for prime contractors on Department of Energy projects at Fermilab. The scope of work includes the installation of medium-voltage cables, low-voltage conductors, raceways, cable trays, and underground ducts, as well as the setup of medium-voltage transformers, diesel engine generators, and luminaires. A primary objective of the contract is the delivery of a complete electrical distribution system for the KRS control building. The project is located in Batavia, Illinois, and falls under NAICS code 238210. Interested parties should note that the response deadline is December 18, 2026. This effort is managed through a Fermilab DOE contractor to ensure the necessary electrical infrastructure is established to support facility operations.

General Info

Industrial electrical installation for DOE projects at Fermilab, due December 18, 2026.

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Place of Performance

Batavia, IL, 60510, USA

Set-Aside

NONE

Documents

This scope was carved out of RFP-383167-CD.

The full solicitation package (18 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs low and medium voltage power distribution for prime contractors on Fermilab Department of Energy projects. Installs medium-voltage cables, low-voltage conductors, raceways, cable trays, and underground ducts. Installs medium-voltage transformers, diesel engine generators, and luminaires. Delivers a complete electrical distribution system for the KRS control building.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
26-140 Installation of Emergency Shut Off Switches
Solicitation # 26-140
Solicitation 26-140 is a subcontracting opportunity for the installation of emergency shut-off switches on power tools at the Atterbury Job Corps Center in Edinburgh, Indiana, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The scope of work specifically requires the installation of two mushroom-head push-button emergency shut-off switches and a new 60A, 208/120V, 3-phase, 4-wire, 6-circuit branch circuit panel with a 60A shunt-trip main circuit breaker in the Facility Engineering Storage/Maintenance Shop. All work must comply with OSHA, EPA, FNC guidelines, and applicable state and local building codes. This is a small business set-aside opportunity requiring a single lump sum bid with a detailed cost breakdown for labor, materials, and equipment. Award will be based on best value, evaluated on a 100-point scale consisting of price (60), quality (20), past performance (10), and schedule (10). A mandatory site visit was scheduled for November 10, 2026, with a response deadline of November 20, 2026. Bidders must provide a valid Indiana Contractor's License, proof of comprehensive insurance, and certification of compliance with Davis Bacon Act wage rates. The contract includes a one-year guarantee of workmanship and Net 30 payment terms. Key deliverables include the functional equipment, operating and maintenance manuals, and a completed SF 1413. Contractors must submit a sequenced construction schedule within 10 days of the Notice to Proceed and adhere to a strict inspection process, including a substantial completion walk-through and a final acceptance inspection. Final payment is contingent upon the release of liens by all subcontractors and material suppliers.
Atterbury Job Corps. – Adams & Associates

POSTED

about 8 hours ago

DEADLINE

in 17 days
View Details
NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency (IEUA) is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections of energized transformers to identify thermal anomalies, installing standardized external oil sampling devices to improve safety and access, and performing comprehensive oil testing analysis. Additionally, the selected contractor will evaluate nitrogen blanket systems to ensure positive pressure is maintained, provide on-site training for up to 20 agency staff members, and develop standard operating procedures for the new sampling devices. This is a fixed-pricing contract with a not-to-exceed total price, intended as a single award to the most capable and cost-effective offeror. Proposals must be submitted electronically via PlanetBids by December 23, 2026. Evaluation criteria include the contractor's experience with utilities or industrial facilities, personnel certifications—specifically Level 1 or higher in Thermography per ASNT standards—and the proposed staffing plan. All work must adhere to ASTM D923, NETA MTS, IEEE, and NFPA 70E safety protocols. The agency requires comprehensive documentation, including annotated IR images and condition reports, and mandates strict adherence to cybersecurity goals and confidentiality agreements.
Inland Empire Utilities Agency

POSTED

about 8 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management & Training Corporation is soliciting bids for a fixed-price, single lump sum subcontract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves the inspection, inventory, functional testing, repair, and certification of emergency lighting systems to ensure compliance with NFPA 101 (2024 Edition) and NFPA 70 standards. The estimated contract value ranges between $25,000 and $100,000, with a required performance period of 30 business days following the written Notice to Proceed. Key deliverables include the integration of maintenance requirements into the facility's Computerized Maintenance Management System, the provision of hazardous material disposal certificates, and the application of durable, uniquely numbered labels to all tested fixtures. Bids are due by December 1, 2026, and must be submitted via email to Sandra Clore. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids equal to or greater than $25,000, contractors must provide a bid bond guarantee of 20% of the base bid, as well as performance and payment bonds from a surety company with at least an A- rating. The award will be based on overall best value. Compliance requirements include adherence to the Davis-Bacon Act for prevailing wages, FAR 52.222-4 for overtime and safety, and the submission of a complete supplier onboarding packet including a W-9 and business self-certification.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in 29 days
View Details

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 237130
New
Federal
KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS
Solicitation # RFP-383167-CD
Solicitation RFP-383167-CD is a firm fixed price contract for the rebuild and renovation of the Kautz Road Substation (KRS), designated as UIP subproject SP-2, at the Fermi National Accelerator Laboratory in Batavia, Illinois. The project is critical to Fermilab's mission, as the KRS provides electricity for both conventional facility needs and process utility requirements. The scope of work includes the demolition of existing buildings, equipment, and feeders, the construction of a new control building on the existing foundation, and comprehensive civil utilities upgrades and pavement renovation. The general contractor is responsible for providing all supervision, labor, materials, and quality control necessary to complete the project. Construction is strictly constrained by the Fermilab accelerator shutdown window, anticipated to run from January 1, 2028, to January 1, 2030. Key project milestones include the completion of submittals and shop drawings within 60 days of the Notice to Proceed, the start of on-site work by January 4, 2028, the completion of the building foundation by March 31, 2028, and the formal issuance of the Authorization for Use and Possession by July 2, 2029, with final project completion due by September 30, 2029. Award selection is based on best value with tradeoffs, where technical factors—specifically organizational structure, key personnel, and experience with government agencies or DOE laboratories—are significantly more important than cost. Offerors must meet strict pass-fail financial requirements, including a current ratio of 1.10 or greater and an aggregate bonding capacity of at least 30 million dollars. The contract adheres to various federal regulations, including the Davis-Bacon Act for wages, the Buy American Act for materials, and FAR requirements for reporting payments and combating trafficking in persons.
Power and Communication Line and Related Structures Construction

POSTED

about 19 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 332323
New
Federal
Bar Grating and Saddle Clips
Solicitation # 388000kmb
Fermi Forward Discovery Group, LLC, acting for Fermilab, is soliciting firm-fixed price proposals for the fabrication and delivery of bar grating assemblies and saddle clips for the LBNF/DUNE project. The requirement includes various sizes of bar grating with 1-1/2 inch tall by 3/16 inch thick bearing bars and 19-W-4 spacing, along with Type W44 and W10 saddle clips. Technical specifications mandate a minimum live load of 100 PSF, a minimum concentrated line load of 1,000 lbs at mid-span, and a maximum dead load of 11 PSF. All materials must be hot-dipped galvanized carbon steel and conform to drawing FDC-0001043 Rev B. The solicitation follows a Lowest Price Technically Acceptable (LPTA) source selection process, with award granted to the responsible offeror providing the lowest price for a technically acceptable proposal. Proposals must be submitted via email to Karen Berger by 5:00 PM CT on November 13, 2026, and must include a proposal with lead times, a completed RFP page one, Subcontractor Annual Representations and Certifications (PROC-FRM-100), and Proposal Certifications (PROC-FRM-466). Delivery is FOB Destination to the Dakota Warehouse in Rapid City, South Dakota. Shipments must strictly adhere to the Ross Shaft Load Envelopes and Shipping Expectation Fact Sheet to avoid rejection. Required delivery documentation includes mill certifications and a Certificate of Conformance. Compliance with federal regulations is mandatory, including the Buy American Act, FAR 52.222-90 regarding anti-discrimination, and various DOE site access and security requirements.
Ornamental and Architectural Metal Work Manufacturing

POSTED

about 19 hours ago

DEADLINE

in 11 days
View Details
NAICS: 23822
New
Federal
PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
Solicitation # 378854_MR
Fermi Forward Discovery Group, LLC is soliciting proposals for the fabrication and installation of a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room at the Fermi National Accelerator Laboratory in Batavia, Illinois. This firm-fixed-price project, part of the Proton Improvement Plan II, involves the installation of two 50 hp centrifugal pumps, a shell and tube heat exchanger, a 250-gallon expansion reservoir tank, and various processing equipment including deionization and dissolved oxygen removal skids. The scope encompasses the procurement of all piping, valves, and instrumentation, as well as the installation of structural supports and pump foundation bases. All work must adhere to ASME B31.3 and B31.9 standards, with specific requirements for weld examinations and pressure testing conducted under Fermilab oversight. The contract has a performance period of 180 calendar days from the Notice-to-Proceed. Proposals are due by November 19, 2026, at 2:00 p.m. CDT and must be submitted in two separate volumes: a technical proposal and a business/price proposal. Award will be based on a lowest price-technically acceptable (LPTA) selection process. Offerors must demonstrate at least ten years of business experience or ensure key personnel, specifically the superintendent and project manager, possess ten years of relevant experience. Due to the secured nature of the Department of Energy site, all attendees for the site visit must be U.S. citizens with a REAL ID and submit access requests at least seven days in advance. Compliance requirements are extensive, including adherence to the Davis-Bacon Act for wages, the Buy American Act, and strict Environmental, Health, and Safety (ES&H) protocols per 10 CFR 851 and FESHM manuals. Subcontractors are required to provide performance and payment bonds, maintain comprehensive construction insurance, and submit a project-specific Quality Control plan. Additionally, offerors must complete various federal certifications, including those regarding small business subcontracting plans and anti-trafficking in persons regulations.

POSTED

about 19 hours ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS