KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS

Active
RFP-383167-CDFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

Batavia, IL, 60510, USA

Set-Aside

NONE

Documents

18
PDF, High priority: read this first2 pages · payment-bond
High
PDF, High priority: read this first4 pages · performance-bond
High
PDF, High priority: read this first4 pages · bid-bond
High
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
Contacts1 person available
OfficeBatavia, IL, 60510, USA
Office AddressBatavia, IL, 60510, USA

Full Description

Show more

This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads.


The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.


The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab.  The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.


This project includes the following milestones:


Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.


Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin.


Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward).


Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed..


Milestone 5 – 30th September 2029; This milestone marks the completion of the project.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
SLED
Seaflower Energy Storage System Project
Solicitation # PLN 25-0027
The Seaflower Energy Storage System Project, identified by solicitation number PLN 25-0027, involves the construction and operation of a 100 MW / 400 MWh utility scale battery energy storage system in Menifee, California. The facility will utilize lithium iron phosphate or similar battery modules arranged on racks within individual containers, including 102 SolBank 3.0 enclosures. The system is designed to interconnect with the Southern California Edison Valley Substation and will feature automated monitoring and remote management systems, eliminating the need for permanent onsite staff. Site infrastructure will include power conversion equipment, a security fence or wall, and a permanent parking area for periodic maintenance and inspection visits. The project has undergone extensive environmental and technical evaluations, including a Mitigated Negative Declaration, geotechnical investigations, and a Hazard Mitigation Analysis to ensure compliance with the 2022 California Fire Code. Assessments have covered air quality, greenhouse gas emissions, noise levels, and biological resources across the approximately 4 acre site. Cultural resource surveys indicate a low to moderate potential for archaeological deposits, necessitating monitoring during ground disturbance. Traffic analysis suggests minimal impact, with an estimated 9 daily trips. The City of Menifee Planning Commission scheduled a public hearing for October 28, 2026, following a public review period that concluded on October 21, 2026.
City of Menifee

POSTED

about 18 hours ago

DEADLINE

N/A
View Details

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 332323
New
Federal
Bar Grating and Saddle Clips
Solicitation # 388000kmb
Fermi Forward Discovery Group, LLC, acting for Fermilab, is soliciting firm-fixed price proposals for the fabrication and delivery of bar grating assemblies and saddle clips for the LBNF/DUNE project. The requirement includes various sizes of bar grating with 1-1/2 inch tall by 3/16 inch thick bearing bars and 19-W-4 spacing, along with Type W44 and W10 saddle clips. Technical specifications mandate a minimum live load of 100 PSF, a minimum concentrated line load of 1,000 lbs at mid-span, and a maximum dead load of 11 PSF. All materials must be hot-dipped galvanized carbon steel and conform to drawing FDC-0001043 Rev B. The solicitation follows a Lowest Price Technically Acceptable (LPTA) source selection process, with award granted to the responsible offeror providing the lowest price for a technically acceptable proposal. Proposals must be submitted via email to Karen Berger by 5:00 PM CT on November 13, 2026, and must include a proposal with lead times, a completed RFP page one, Subcontractor Annual Representations and Certifications (PROC-FRM-100), and Proposal Certifications (PROC-FRM-466). Delivery is FOB Destination to the Dakota Warehouse in Rapid City, South Dakota. Shipments must strictly adhere to the Ross Shaft Load Envelopes and Shipping Expectation Fact Sheet to avoid rejection. Required delivery documentation includes mill certifications and a Certificate of Conformance. Compliance with federal regulations is mandatory, including the Buy American Act, FAR 52.222-90 regarding anti-discrimination, and various DOE site access and security requirements.
Ornamental and Architectural Metal Work Manufacturing

POSTED

about 14 hours ago

DEADLINE

in 11 days
View Details
NAICS: 23822
New
Federal
PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
Solicitation # 378854_MR
Fermi Forward Discovery Group, LLC is soliciting proposals for the fabrication and installation of a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room at the Fermi National Accelerator Laboratory in Batavia, Illinois. This firm-fixed-price project, part of the Proton Improvement Plan II, involves the installation of two 50 hp centrifugal pumps, a shell and tube heat exchanger, a 250-gallon expansion reservoir tank, and various processing equipment including deionization and dissolved oxygen removal skids. The scope encompasses the procurement of all piping, valves, and instrumentation, as well as the installation of structural supports and pump foundation bases. All work must adhere to ASME B31.3 and B31.9 standards, with specific requirements for weld examinations and pressure testing conducted under Fermilab oversight. The contract has a performance period of 180 calendar days from the Notice-to-Proceed. Proposals are due by November 19, 2026, at 2:00 p.m. CDT and must be submitted in two separate volumes: a technical proposal and a business/price proposal. Award will be based on a lowest price-technically acceptable (LPTA) selection process. Offerors must demonstrate at least ten years of business experience or ensure key personnel, specifically the superintendent and project manager, possess ten years of relevant experience. Due to the secured nature of the Department of Energy site, all attendees for the site visit must be U.S. citizens with a REAL ID and submit access requests at least seven days in advance. Compliance requirements are extensive, including adherence to the Davis-Bacon Act for wages, the Buy American Act, and strict Environmental, Health, and Safety (ES&H) protocols per 10 CFR 851 and FESHM manuals. Subcontractors are required to provide performance and payment bonds, maintain comprehensive construction insurance, and submit a project-specific Quality Control plan. Additionally, offerors must complete various federal certifications, including those regarding small business subcontracting plans and anti-trafficking in persons regulations.

POSTED

about 14 hours ago

DEADLINE

in 17 days
View Details
NAICS: 236210
New
Federal
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
Solicitation # RFP-376508-CD
Solicitation RFP-376508-CD is a firm-fixed-price request for proposals issued by Fermi Forward Discovery Group, LLC for the addition and renovation of the Central Utility Building (CUB) at the Fermi National Accelerator Laboratory in Batavia, Illinois. The project, designated as UIP Subproject 1-CUB, involves expanding the facility to accommodate new chillers and increasing chilled water capacity, renovating the exterior shell and roof, and installing new fire protection, fire alarm, and medium and low voltage power systems. The work is subject to strict schedule constraints tied to the laboratory's accelerator shutdown, with on-site construction required to occur between January 1, 2028, and January 1, 2030, and a final completion deadline of October 1, 2029. Award will be determined using a tradeoff best-value source selection method, where technical factors—including organizational structure, safety compliance, and past performance—are significantly more important than price. Technical proposals are scored out of 70 points, while the price proposal accounts for 30 points. Offerors must demonstrate significant experience, including at least one project valued at 50 million dollars or more. Mandatory requirements include the submission of bid, performance, and payment bonds, adherence to Davis-Bacon wage rates, and compliance with the Buy American Act and ADA standards. Proposals are due by 4:00 pm CT on December 17, 2026, and must be submitted in two separate volumes: a technical proposal and a business management and price proposal.
Industrial Building Construction

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS