Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on February 7, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Industry inquiries about substations

Closed
PZI-2024-SubstationFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Hanscom AFB, MA, 01731, USA

Set-Aside

NONE

Documents

6

B1200 Substation Replacement One-Line Diagram

PDF, High priority: read this first3 pages · specifications
High

C10905 Customer Station (STA) Outdoor Construction Standard

PDF, High priority: read this firstspecifications
High

Eversource Construction Standard C10903: Customer Station (STA) Vaults, Indoor

PDF, High priority: read this firstspecifications
High

Fiber Optic and Electrical Equipment Specifications

PDF, High priority: read this firstspecifications
High

Hanscom AFB Market Research Questions - Distribution Switchgear

DOCX, High priority: read this firstrfi
High

SPC-SWG-002 Medium Voltage Switchgear for Customer Stations

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Deadline changed

Response deadline changed from Feb 7, 2024 to Mar 1, 2024.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2835 Aflcmc Hanscom Pzi
Contacts1 person available
OfficeHANSCOM AFB, MA, 01731-2107, USA
Office AddressHANSCOM AFB, MA, 01731-2107, USA
Contacts

Full Description

Show more
Hanscom AFB is looking to replace its primary distribution switchgear with a new state-of-the-art equipment solution providing increased redundancy and protection of its electrical distribution system. The equipment system will have (1) sheltered single aisle NEMA 3R utility switchgear for utility interconnection, and (1) multi-unit indoor NEMA 3 government switchgear for installation internal electrical distribution. Based on the provided one-line and sequence of operations, the utility gear should be no fewer than 10 structures(cubicles) and meet the local utility specifications (Eversource Eastern Massachusetts). The government switchgear should be no fewer than 15 structures(cubicles) and will be arc-resistant. Both switchgears will nominal voltage rating of 15kV and utilize house 1200A breakers. 95Kv BIL The one-line, sequence of operations, and utility requirements are provided in the attachments. The incoming utility service functions via 3 incoming feeders. The government requires the ability to isolate any/all utility feeders from the government switchgear. Automation, controls and HMI interface will be required to interface between various generation sources and paralleling. Hanscom AFB is Requesting the following information to clarify enclosure requirements and facilitate on-going project development: Provide a letter describing the capabilities of manufacturing, installation, servicing, and integration between required systems (utility supply and customer distribution generation). Include specific examples of turn-key work experience and equipment related to integration and automation projects on DoD facilities. Provide recommended product cut-sheet(s) and literature of product line appropriate for this replacement. Based on the information provided, what is the minimum required footprint for each equipment item including: utility sheltered-isle switchgear government indoor switchgear HMI system and controls cabinet Method of bus and switchgear interconnects (bus duct, below grade cables, etc) Include any additional installation requirements/clearances, and operational clearances if recommendations exceed NEC minimums. Required building opening dimensions for installation Provide recommended pad assembly and required concrete flatness/levelness ratings Provide equipment designed service life information, ideal operational temperature and humidity criteria to maximize equipment lifespan and minimize arc flash risk. Provide list of and requirements for recommended accessories, including breaker cart, breaker testing equipment, space for maintenance, remote racking, on board DC system etc Provide required spatial criteria and interface requirements for SCADA, HMI and micro-grid integration equipment.

More opportunities from Department Of Defense → FA2835 Aflcmc Hanscom Pzi

Same awarding agency

NAICS: 333914
New
Federal
Hanscom Aero Club Automated Fuel Management System Replacement
Solicitation # 2027-PZI-1839
Solicitation 2027-PZI-1839 is a firm-fixed-price contract issued by the AFLCMC/PZIB at Hanscom Air Force Base, Massachusetts, for the replacement of an obsolete fuel management terminal at the Hanscom Aero Club. The project requires a contractor to provide all labor, materials, and technical expertise to decommission the existing QTPod M3000 terminal and pedestal and install and commission one new brand-name QTPod M4000 automated fuel management terminal. The estimated value of the project is 30,000 dollars, and it is designated as a 100 percent Total Small Business Set-Aside under NAICS code 333914. The contractor must utilize certified fueling technicians and ensure the system integrates with JPMorgan Chase Paymentech. Key compliance requirements include providing an active PCI Attestation of Compliance and submitting an ATO technical package within 10 days of award. All work, including installation and final acceptance testing, must be completed within 45 calendar days of the Notice to Proceed, with the physical on-site changeout limited to two consecutive business days. Award will be based on the Lowest Price Technically Acceptable (LPTA) method, evaluating technical proposals on an acceptable or unacceptable basis before considering price. Quotes are due via email by 12:00 PM EST on November 6, 2026.
Measuring, Dispensing, and Other Pumping Equipment Manufacturing

POSTED

4 days ago

DEADLINE

in 17 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS