Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on June 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Innovation Park Industrial Subdivision Phase 4 - 2506 Bonder Road

Closed
BT-RFT-2026-070International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237210
New
International
We Wai Kai Nation Thunderbird and Elders SubdivisionThe We Wai Kai Nation is inviting bids for the construction of municipal infrastructure and site servicing for two developments: the Thunderbird Subdivision, which includes 37 single-family residential lots, and the Elders Complex, comprising 18 duplex units and one common building. The scope of work encompasses full road construction, installation of underground water, sanitary, and storm sewer systems, coordination and installation of shallow utilities, construction of stormwater management facilities, and all necessary earthworks, grading, testing, commissioning, restoration, and ancillary works required to complete the project to functional and regulatory standards. All activities must be executed with careful attention to environmental and community impacts, ensuring long-term durability and compliance with local and Indigenous infrastructure requirements. Tender submissions are due by July 31, 2026, following the solicitation’s posting on July 25, 2026, under reference number BC231795. The contract is administered by the We Wai Kai Nation with oversight from the Government of Canada, and inquiries should be directed to the primary point of contact, John Sorenson, Contracting Authority, via john.sorenson@wwkengineering.ca. The project is federally supported and located within the jurisdiction of the We Wai Kai Nation, with performance expected in the designated development areas. Bidders must be prepared to meet stringent quality, safety, and timeline expectations, as well as coordinate closely with Indigenous governance and environmental protocols throughout all phases of construction.
We Wai Kai Nation

POSTED

about 18 hours ago

DEADLINE

in 5 days
NAICS: 237210
New
SLED
Carmichael Promenade Phase 4 Lot Line AdjustmentThe contract involves a lot line adjustment within the Carmichael Promenade Phase 4 subdivision to realign property boundaries between Lots 18, 19, and 20 and the shared Lot B. The adjustment will expand the individual lot sizes of Lots 18, 19, and 20 by transferring land from Lot B, which will be significantly downsized to consist solely of a north-south paseo that runs adjacent to Lots 12, 13, 20, and 21. This change is intended to create private backyard areas for residents of Lots 9 through 24 while preserving an essential pedestrian and bicycle pathway that connects throughout the neighborhood. The modification ensures continued public access for non-motorized traffic and maintains the subdivision’s overall connectivity, even as ownership and use of the land are reconfigured. The project is forecasted by Sacramento County under the title Carmichael Promenade Phase 4 Lot Line Adjustment, with a posted date of July 24, 2026. Julie Newton, the Environmental Coordinator, is the primary point of contact, handling regulatory and environmental inquiries, while Tim Blair is listed as the applicant. The place of performance is in Sacramento, California, and the project can be tracked through the California Environmental Quality Act database using the provided link. No solicitation number or NAICS code has been assigned, and the project type is listed as a forecast, indicating it is not yet open for bidding but is in the planning and notification phase.
Sacramento County

POSTED

1 day ago

DEADLINE

N/A
NAICS: 237210
New
SLED
Carmichael Promenade Phase 6 Lot Line AdjustmentThe contract pertains to a lot line adjustment within the Carmichael Promenade Phase 6 development in Sacramento, California, involving Lots 21, 22, and 23 along with the common Lot B. The adjustment will expand the individual parcel sizes of Lots 21, 22, and 23 by reconfiguring the boundaries to deduct land from Lot B, which will be significantly reduced in size. The revised Lot B will be limited to a narrow paseo running north to south, bordered by Lots 12, 13, 20, and 21, designed to preserve pedestrian and cyclist connectivity across the subdivision while enabling private backyard space for residents of Lots 9 through 24. This change enhances residential usability without compromising public access, maintaining the subdivision’s open space function and transit-friendly design. The project is listed as a forecast under Sacramento County’s jurisdiction with no solicitation number or set-aside classification indicated. It was posted on July 24, 2026, and is managed through the California Environmental Quality Act portal. Primary point of contact is Julie Newton, Environmental Coordinator at Sacramento County, reachable via email and phone, while Tim Blair of SGI Companies serves as the applicant. The place of performance is clearly defined as Sacramento, California, with no specified zip code or additional address details provided. All regulatory and procedural actions associated with the adjustment are subject to local land use and environmental compliance requirements under California law.
Sacramento County

POSTED

1 day ago

DEADLINE

N/A
NAICS: 237210
New
SLED
Carmichael Promenade Phase 3 Lot Line AdjustmentThe Carmichael Promenade Phase 3 Lot Line Adjustment involves modifying the boundaries between Lots 10, 11, 12, and the common Lot B within the Carmichael Promenade Map to expand the private lot sizes of Lots 10, 11, and 12 while reducing Lot B to a narrow paseo running north to south adjacent to Lots 12, 13, 20, and 21. This adjustment is designed to provide enhanced private backyard space for residents of Lots 9 through 24 without compromising essential pedestrian and cyclist connectivity throughout the subdivision. The reconfiguration ensures that Lot B retains its function as a public corridor, preserving access and circulation for nonmotorized traffic while accommodating increased residential use of adjacent parcels. The project is forecasted by Sacramento County in California with a posted date of July 24, 2026, and is managed through the California Environmental Quality Act (CEQA) process, as indicated by the provided uiLink. The primary point of contact is Julie Newton, Environmental Coordinator, reachable via email and phone, while Tim Blair is listed as the applicant. There is no solicitation number, set-aside designation, or NAICS code associated with this forecast, and the place of performance is clearly identified as Sacramento, California. The adjustment reflects a planning effort to balance private property expansion with the continued need for public open space and connectivity within the development.
Sacramento County

POSTED

1 day ago

DEADLINE

N/A
NAICS: 237210
New
SLED
Carmichael Promenade Phase 5 Lot Line AdjustmentThe Carmichael Promenade Phase 5 Lot Line Adjustment involves reconfiguring the boundaries between Lots 13, 14, and 15 and the existing common Lot B within the Carmichael Promenade Map to expand the individual lot sizes of Lots 13, 14, and 15 while significantly reducing the area of Lot B. The revised Lot B will be narrowed to accommodate only the paseo—a pedestrian and cyclist corridor extending north to south—bordering Lots 12, 13, 20, and 21. This adjustment is intended to create private backyard spaces for residents of Lots 9 through 24 while preserving continuous public access for nonvehicular traffic throughout the subdivision. The change supports enhanced residential use without compromising the neighborhood’s connectivity and open space goals. The project is forecasted by Sacramento County under the California Office of Planning and Research’s CEQA process, with the official record accessible through the provided UI link. No solicitation number has been assigned, and the procurement is not currently categorized under a specific set-aside or NAICS code. The primary point of contact is Julie Newton, Environmental Coordinator at Sacramento County, reachable via phone or email, while Tim Blair of SGIC Companies serves as the applicant. The place of performance is clearly defined as Sacramento, California, and all actions pertain to land use modifications within the existing Carmichael Promenade development boundaries.
Sacramento County

POSTED

1 day ago

DEADLINE

N/A
NAICS: 237210
New
SLED
Carmichael Promenade Phase 1 Lot Line AdjustmentThe Carmichael Promenade Phase 1 Lot Line Adjustment involves a reconfiguration of property boundaries between Lot 16, Lot 17, and Lot B within the Carmichael Promenade subdivision in Sacramento, California. The adjustment will increase the sizes of Lots 16 and 17 by transferring land from Lot B, which will be significantly reduced to encompass only the narrow paseo running north to south, adjacent to Lots 12, 13, 20, and 21. This change is designed to create private backyard areas for residents of Lots 9 through 24 while preserving continuous pedestrian and cyclist access through the public paseo, ensuring the subdivision maintains its intended connectivity for nonvehicular traffic. The modification supports enhanced residential usability without compromising public rights-of-way or community access. The project is forecasted by Sacramento County with a posted date of July 24, 2026, and is listed under the agency’s environmental review process. Julie Newton, the Environmental Coordinator, serves as the primary point of contact for inquiries, while Tim Blair is identified as the applicant. Although no solicitation number, NAICS code, or set-aside details are provided, the project is part of a broader development context requiring environmental coordination and compliance. The official project page can be accessed through the California Environmental Query and Notification system at the provided URL, indicating that further documentation, environmental analysis, and public review are anticipated prior to implementation.
Sacramento County

POSTED

1 day ago

DEADLINE

N/A
NAICS: 237210
New
SLED
Woodlands Specific Plan Supplemental EIR (ED00-428)Monarch Village Nipomo, LLC is seeking approval for a mixed-use development on a 4.6-acre site in Nipomo, California, within the Village of Monarch Dunes, bordered by Center Point Place, Trilogy Parkway, and Via Concha, and located near the Monarch Club at Trilogy. The project proposes to subdivide three existing parcels into ten new parcels using a phased vesting tentative parcel map, including eight vertically configured airspace parcels: four ground-floor commercial condominium units with common areas and four corresponding second-story residential condominium units, totaling 28,259 square feet of commercial space and 40 two-bedroom residential units. The development will include two commercial retail buildings and four mixed-use commercial/residential buildings, with a total building floor area of 96,019 square feet, supported by circulation, storage, and utility areas. Associated improvements will include grading, drainage, on-site utilities, parking, and landscaping, with both on-site and off-site parking provisions. Approximately 3.82 acres of the site, including three off-site parcels, will be disturbed during construction. The site is zoned within the Commercial Retail and Recreation-Resort land use categories and is situated approximately half a mile east of Highway 1 and four miles west of Highway 101. The project requires a Conditional Use Permit and is being reviewed under the Woodlands Specific Plan Supplemental EIR, with primary point of contact Kerry Brown, Supervisor Planner at San Luis Obispo County, and authorized agent Jamie Jones available for inquiries.
San Luis Obispo County

POSTED

4 days ago

DEADLINE

N/A

AI Contract Overview

Show more

The contract opportunity titled Innovation Park Industrial Subdivision Phase 4 - 2506 Bonder Road is a federal solicitation issued by the City of London under the Government of Canada, with a NAICS code of 237210 indicating it relates to utility system construction. The solicitation was posted on June 8, 2026, with a strict response deadline of June 11, 2026, at 11:00 PM Eastern Time. Despite the federal classification, the organizing agency is the municipal City of London, and the place of performance is tied to the specified industrial subdivision location, though exact geographic details such as city, state, or zip are not provided. The primary point of contact for inquiries is Darren Mockler, the Contracting Authority, reachable via email at dmockler@london.ca or phone at 1111111111. The opportunity is open for competitive bidding with no specific set-aside designation indicated, and interested parties can access the full solicitation through the official Canada Buys portal using the provided UI link.

General Info

City of London seeks bids for Innovation Park Industrial Subdivision Phase 4 by June 11, 2026.

Agency

Government of Canada → City Of LondonView Agency

NAICS

237210 - Land SubdivisionView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → City Of London
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → City Of London
View Agency Profile
Office AddressN/A
Contacts
Darren MocklerContracting Authority

Full Description

Show more
Refer to Documents

More opportunities from Government of Canada → City Of London

Same awarding agency

NAICS: 237310
International
Reconstruction of Richmond Street from Windermere Rd to Huron StThe City of London is seeking proposals for the reconstruction of Richmond Street between Windermere Road and Huron Street under solicitation BT-RFP-2026-027, posted on July 10, 2026, with responses due by July 30, 2026. This federal procurement is managed by the Government of Canada through the City of London as the implementing agency, and it involves significant infrastructure upgrades to a key urban corridor. The project requires comprehensive civil engineering work including roadbed reconstruction, drainage improvements, utility upgrades, and pavement resurfacing, with specific technical standards and performance requirements outlined in the referenced documents. Proposals must be submitted by the deadline, and all bidders are expected to demonstrate qualified experience, compliance with applicable regulations, and capacity to deliver the project within the specified timeline and budget. Darren Mockler, the Contracting Authority, serves as the primary point of contact for inquiries and can be reached via email at dmockler@london.ca or by phone at 1111111111. The procurement is open to eligible vendors without a specific set-aside classification, and interested parties are directed to the official CanadaBuys portal for full solicitation details. The place of performance is clearly defined as the stretch of Richmond Street in London, Ontario, with no additional regional or jurisdictional constraints indicated. All contractors must ensure compliance with municipal, provincial, and federal regulations regarding construction, environmental protection, and public safety during project execution.
Highway, Street, and Bridge Construction

POSTED

16 days ago

DEADLINE

in 5 days
View Details