Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on September 3, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

install a fume extraction system

Awarded
weld-feFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238290
New
Centennial JCC Panic Hardware Services (Electrical Room Egress Doors)
Solicitation # Panic Hardware (Electrical Room Egress Doors)
Management & Training Corporation (MTC) is soliciting bids for the installation of commercial-grade panic hardware on electrical room egress doors at the Centennial Job Corps Center in Nampa, Idaho. The scope of work includes conducting site surveys to verify door dimensions and fire ratings, procuring Grade I heavy-duty panic bars, exterior trim, rim cylinders, strikes, and door closers, and performing installation and testing. All work must adhere to NEC 2023 Article 110.26(C)(3), NFPA 101 Life Safety Code, and ADA standards. To ensure fail-safe operation, contractors must perform at least 10 consecutive cycle tests on all installed hardware. This is a fee-for-service subcontracting opportunity open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities under NAICS code 238290. Bidders must be licensed in the State of Idaho and provide three references for similar projects. Required submission documents include a completed bid sheet with lump sum and individual deficiency pricing, a W-9, a self-certification form, and acceptance of terms and conditions. All bids must be submitted via email to Sandra Clore by December 1, 2026, at 3:00pm MST. The contract is subject to various federal regulations, including the Davis-Bacon Act for prevailing wage rates and fringe benefits, as well as FAR clauses regarding Buy American preferences and combating trafficking in persons. Contractors are required to comply with DOL records management, mandatory training, and privacy breach notification requirements. Payment will be issued upon the submission of invoices for materials and services that have been delivered and accepted by MTC. Final inspection and acceptance will occur at the MTC designated point of delivery.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 238290
New
SLED
Pauma Security Gate
Solicitation # 2026-27-06
Solicitation 2026-27-06 for the Valley Center Pauma Unified School District involves the fabrication and installation of automated, keypad-entry hinging steel security swing gates at entry and egress driveways in Valley Center, California. The project requires two powder-coated steel double swing gates, each 18 feet wide by 5 feet tall, and explicitly prohibits the use of chain link options. Key technical components include a mounted Knox switch with Fire Department filing, two entry remotes, gate hold timers, a mounted strobe detector for emergency vehicles, and a keypad similar to the Door King 1506-086. The contract value is capped at 1,000,000 dollars, and the award will be granted to the lowest responsive and responsible bidder. Eligible bidders must hold a California contractor's license C13 or C-61/D28 and comply with prevailing wage requirements and Department of Industrial Relations registration. The project mandates a payment bond for 100 percent of the total bid price and a DVBE participation goal of at least 3 percent. Required submissions include a comprehensive bid packet featuring non-collusion affidavits, Iran Contracting Act certification, and fingerprinting certifications. Performance must be coordinated with the Director of Maintenance and Operations, with work hours restricted to 7:00 am to 5:00 pm, Monday through Friday. Additionally, contractors must adhere to strict hazardous material standards and California Air Resources Board compliance, with the district maintaining the right to terminate the agreement upon 30 calendar days written notice.
Valley Center Pauma USD

POSTED

about 22 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This project involves the installation of a fume extraction system for twelve welding booths in Greenville, Kentucky. The system requires an outdoor extraction unit designed to support all twelve arms operating simultaneously, with each arm providing an airflow of approximately 675 to 700 cfm. The design includes galvanized industrial standard round ductwork supported by the building structure, a spark extractor prior to the collector, and extraction arms at least 18 inches long. The system will utilize a two stage compressor providing 17 CFM at 90 PSI and will not require HEPA filters or a gas fired air make up unit. Electrical requirements include 480 volt three phase 30 amp circuits for the welders and specific three phase circuits for machine tools including a band saw, drill press, and iron worker. Each booth requires a 120 volt circuit, and the extraction unit requires 480 volt three phase power. While the mechanical and electrical quotes are to be submitted separately, the electrical contractor is responsible for all connections to the fume extraction system. Additionally, the project includes portable grinding tables with lighting, though these do not require filtration or airflow.

General Info

Agency

N/A

Contract Value

$47,353

NAICS

238290 - Other Building Equipment Contractors

Place of Performance

Muhlenberg Career Development Center 3875 State Highway 181 North, GREENVILLE, KY, 42345, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline time changed from 10:00 PM UTC to 9:00 PM UTC on Jul 31, 2009. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Glen EmbryDirector of Administration

Full Description

Show more
Location of fume extraction unit, indoor or out..? Outdoor unit Typical booth layout showing duct location...? Location of duct work will be as mentioned above the welding booths Does the unit require compressed air and if so can we connect in the drop located on the wall behind booths..? yes Duct work layout and size..? The system should be designed for having all 12 arms in use at once, with an airflow of approx 675-700cfm each Has the consultant specified the exhaust airflow (Cfm) that he wants in each booth? The system should be designed for having all 12 arms in use at once, with an airflow of approx 675-700cfm each Has the engineer specified the diameter of the exhaust duct in each booth? The system should be designed for having all 12 arms in use at once, with an airflow of approx 675-700cfm each What Air to Cloth ratio does the engineer want to use in the collector? There is no specification for the Air to Cloth ratio for use in the collector Does the engineer want to use HEPA filters before exhausting the air outside? No Does the engineer want to consider a gas fired air make-up unit to provide replacement air? No Will the service equipment be mounted in the shop area and where is the desired location. If referring to fume extraction, the equipment will be installed outside In the bid package on the extent of work page question #5 states "install service feed for extra 20 amp circuits on the opposite side of building" could we get more specifics on this? This is referring to the other side of the building that is planned for an additional welding fabrication classroom in the future. Statement #8 on same page "Install all electrical outlets needed for shop operation" also needs to be more specific. This is for the 12 booths What kind of plug configuration are the welders? 480 three phase Can we use an Amtech 12 cartridge fume collector with reverse pulse cleaning technology? No, not familiar with unit Confirm Unit will be located outside in the area discussed at the meeting? Yes unit is to be outside as mentioned in walk-through What diameter and length are the arms. As mentioned, the diameter will be proportional to exhaust fan. The system should be designed for having all 12 arms in use at once, with an airflow of approx 675-700cfm each The length must be at least 18 inches long enough for students to manipulate the arm easily within the welding booth. Electrical installation and connection by others. Yes, electrical and fume extraction installation are separate What is the capability of the compressor? SCFM @ what PSI? (Dust collector requires 5 SCFM @ 90 PSI) Two stage compressor; 5 HP, 120 Gallon; 17 CFM Who supplies the combination motor starter disconnect? Vender Can we use round duct instead of rectangular duct? (less static loss with round) Yes What is maximum noise level in dBA? Lowest dBA possible Is there a specified CFM requirement? The system should be designed for having all 12 arms in use at once, with an airflow of approx 675-700cfm each Shall we provide enough exhaust air to operate all the booths at any one time. Or will there be a diversity factor that only 75% of the boothes will be operating at any one time. The system should be designed for having all 12 arms in use at once, with an airflow of approx 675-700cfm each What total airflow at what esp shall we figure the collector and what square footage of the filter media should we provide. What shall the media be made of? The system should be designed for having all 12 arms in use at once, with an airflow of approx 675-700cfm each Filter media Do you want a spark extractor prior to the collector? yes What ampacity are the 480 volt 3 phase welder circuits supposed to be? 30 amp What ampacity and phase are the 480 volt machine tool circuits supposed to be? band saw 27 amp three phase drill press 27 amp three phase iron worker 27 amp three phase Does the grinding booth need (5) 208 volt circuits and (5) 120 volt circuits? No, there will only be two grinding booths two 120 Are the 208 volt circuits single phase or three phase? Prefer three phase How many circuits are required for the extraction unit and what voltage, ampacity, and phase are these circuits? One per booth, 120 volt for each booth and 480 three Where are the new panel boards and transformer to be located in the building? Loft may be a possibility As recommended by electrician Is a bid bond required for this bid? No bond is required. Is the electrical contractor responsible for all electrical work to new fume extraction system? Yes Will the exhaust ductwork be supported from the building structure above the welding booths, or supported from the floor? From the building structure above the welding booths Will make up air be required for the new exhaust system? No If the new extraction unit is set outside the building, will an air silencer be required for the exhaust air due to the noise level that may interfere with the surrounding class rooms? No Where will the 12 total extraction arms need to be mounted? This needs to be pre-determined because of the cost factor involved. Extension arms will be mounted above the welding booth and should extend at least 18". Will the mechanical and electrical be separate, or be combined together as one quote? Yes separate Which standard is to be used for duct fabrication, SMACNA HVAC duct construction standards etc. Galvanized industrial standard How do we review the responses to questions that have been submitted? On the Federal Business Opportunity website. Can the fume Extraction system be made individual for each booth eliminating the need for outside unit? No Variable air flow per booth is needed with shut-on/off for each booth? Yes Because you are enclosing each booth would there not be a need for lighting? No What filtration are you looking for is it just particulate (and to what level or eff.) or do you need vapor and gas filtration as well? on the grinding tables how many are needed.? Not needed for grinding tables Can the grinding tables be made with a dust collector built-into it. on the grinding table they need a down draft air flow? What filtration level is required for this application? No filtration for grinding tables nor airflow needed Grinding tables are to be portable? YES/NO? Yes The Grinding table will need lighting? Yes

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS