Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 9, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Install and replace damaged chain link fence.

Closed
07-398504State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 21 days

General Info

Documents

1

Bid 07-398504: Install and replace damaged chain link fence

PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
07-LA-105-R2.1/R2.5   ***   LOS ANGELES COUNTY NEAR LENNOX ON ROUTE 105 FROM NORTHBOUND ROUTE 405 CONNECTOR TO INGLEWOOD AVENUE

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Modify the existing traffic control signals.
Solicitation # 07-381404
The California Department of Transportation has issued solicitation 07-381404 for the modification of existing traffic control signals on a State Highway in Los Angeles County, specifically at Del Amo Boulevard in the City of Torrance. With an estimated project cost of 780,000 dollars, the scope of work includes modifying signal and lighting systems, implementing temporary signal systems, and installing thermoplastic crosswalks and pavement markings with enhanced wet night visibility. The project also requires the establishment of traffic control systems, construction area signs, and temporary pedestrian access routes, as well as the development of a lead compliance plan and a water pollution control program. Contractors must hold either a Class A or Class C-10 license and adhere to prevailing wage rates as determined by the California Department of Industrial Relations. Performance must begin within 180 days of contract approval, with a 72-hour notice required prior to starting job site activities. Key technical requirements include compliance with MIL-STD-810G for cellular routers and strict marking and identification standards for temporary steel barrier segments. Quality control measures involve source inspection of equipment enclosures and specific testing for cables and concrete compressive strength. Payment is managed through the Department's prompt payment monitoring system, requiring subcontractors to be paid within seven days of progress payments. The solicitation also emphasizes Buy America requirements for furnished materials and includes specific submittal preferences for Disabled Veteran Business Enterprises and small businesses.
Highway, Street, and Bridge Construction

POSTED

about 16 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Los Angeles County At Various Locations On Route 10 From 0.2 Mile West Of Francisquito Avenue Undercrossing To Fairplex Drive Overcrossing And On Route 57 From 0.3 Mile South Of Brea Canyon Road Undercrossing To Gladstone
Solicitation # 07-379904
Solicitation 07-379904 is a unit price construction contract issued by the California Department of Transportation for highway improvements in Los Angeles County. The project scope involves construction on State Highway Route 10, from 0.2 mile west of the Francisquito Avenue undercrossing to the Fairplex Drive overcrossing, and on Route 57, from 0.3 mile south of the Brea Canyon Road undercrossing to Gladstone. With an estimated project cost of 7.4 million dollars, the work encompasses roadway excavation, concrete removal, clearing and grubbing, and the implementation of drainage, utilities, and electrical systems. Key deliverables include pavement structural work and comprehensive traffic management, requiring the use of special portable freeway detour signs and changeable message signs to ensure the traveled way remains open when construction is not active. The contract mandates strict adherence to 2025 Standard Specifications and Standard Plans, with project plans approved on June 9, 2026. Bidders must submit responses by December 8, 2026. Compliance requirements include following Buy America/Build America standards for manufactured products, providing environmental product declarations for concrete and asphalt, and adhering to prevailing wage rates as determined by the California Department of Industrial Relations or the U.S. Secretary of Labor, whichever is higher. Quality control is emphasized through mandatory ACI Concrete Field-Testing Technician Grade 1 certification for personnel and rigorous testing of materials at METS. Additionally, the project requires a lead compliance plan and specific marking and labeling standards for steel barriers, connection bolts, and pavement markings.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS